# 245 Leavenworth St

Block 0337, lot 003. Page: https://www.permitgraph.org/a/0337/003

- City's use: Multi-Family Residential
- Built: 1910
- Stories: 6
- Units: 49
- Rooms: 49 bathrooms
- Building: 26,430 sq ft
- Lot: 5,355 sq ft
- Zoning: RC4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

41 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202201045313](https://www.permitgraph.org/p/202201045313) | Jan 4, 2022 | Completed: final sign-off Mar 2022 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | apt# 36: kitchen and bath remodel only. no structural/ exterior work req. no change to wall layout. all work within unit. no fire alarm or sprinkler work req. in kind. | $30,000 |
| [202107305509](https://www.permitgraph.org/p/202107305509) | Jul 30, 2021 | Expired or cancelled: cancelled Jan 2026 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | replacement of (e) wood drop beam within the basement. | $20,000 |
| [202005067334](https://www.permitgraph.org/p/202005067334) | May 6, 2020 | Completed: final sign-off Jul 2020 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | apt 67: kitchen and bath remodel. new cabinets, countertops and fixtures. no structural, no exterior work. no change in existing layouts or wall modifications/infills. all work within unit. no fire a… | $18,000 |
| [201907125794](https://www.permitgraph.org/p/201907125794) | Jul 12, 2019 | Completed: final sign-off Aug 2019 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit 41: kitchen and bath remodel. no structural, no exterior work req no change in wall layout. all work within unit no fire alarm sprinkler work req | $29,000 |
| [201809129820](https://www.permitgraph.org/p/201809129820) | Sep 12, 2018 | Completed: final sign-off Nov 2018 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit 35. kitchen & bath remodel, no structural, no exterior work. all work within the unit. no work in any common areas. no fire alarm or sprinkler work required. no wall modification. no reframing. | $25,000 |
| [201704113708](https://www.permitgraph.org/p/201704113708) | Apr 11, 2017 | Completed: final sign-off Jun 2017 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit#27 kitchen & bath remodel. no structural. no exterior. like for like. n/a for maher. | $20,000 |
| [201701106877](https://www.permitgraph.org/p/201701106877) | Jan 10, 2017 | Completed: final sign-off Feb 2017 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | #33 1. kitchen and bath remodel as like. no alteration of wall, window and door. | $25,000 |
| [201612215536](https://www.permitgraph.org/p/201612215536) | Dec 21, 2016 | Never finaled: issued Oct 2018, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | site permit to add two new accessory dwelling units to basement level per ordinance 162-16. ** maher: n/a ** | $100,000 |
| [201608023972](https://www.permitgraph.org/p/201608023972) | Aug 2, 2016 | Never finaled: issued Aug 2016, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit #62 - revision to pa #201606139827: relcoate kitchen to opposite wall, create new bedroom in old kitchen area. n/a maher ordinance. | $5,000 |
| [201608023976](https://www.permitgraph.org/p/201608023976) | Aug 2, 2016 | Completed: final sign-off Nov 2016 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit #32 - removal of exisitng kitchen & bedroom walls, relocation of kitchen, create new 2nd bedroom in existing suite. remodel existing bathroom as like new fixtures. n/a maher ordinance. | $20,000 |
| [201606139828](https://www.permitgraph.org/p/201606139828) | Jun 13, 2016 | Never finaled: issued Jun 2016, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | apt 5: kitchen & bathroom remodel; like for like. | $20,000 |
| [201606139827](https://www.permitgraph.org/p/201606139827) | Jun 13, 2016 | Never finaled: issued Jun 2016, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | apt 62: kitchen & bathroom remodel; like for like. | $20,000 |
| [201602290796](https://www.permitgraph.org/p/201602290796) | Feb 29, 2016 | Expired or cancelled: cancelled Jul 2016 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [High Quality Roofing](https://www.permitgraph.org/contractor/high-quality-roofing-734059) | reroofing | $18,000 |
| [201601056400](https://www.permitgraph.org/p/201601056400) | Jan 5, 2016 | Completed: final sign-off Apr 2016 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | apt 44 & 51: each unit: kitchen & bathroom remodel. all work in-kind. no change to walls, doors or openings. | $18,000 |
| [201508053343](https://www.permitgraph.org/p/201508053343) | Aug 5, 2015 | Expired or cancelled: cancelled Aug 2015 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit #8: kitchen & bathroom remodel. finishes & fixtures. no walls to be moved, no structural work. | $18,000 |
| [201506098545](https://www.permitgraph.org/p/201506098545) | Jun 9, 2015 | Never finaled: issued Jun 2015, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | remove existing kitchen & bath cabinets, supply plumbing & electrical to new existing locations. install cabinets, counters, fixtures, redo hardwood or supply flooring. maintain fire sepeartion betwe… | $18,000 |
| [M575777](https://www.permitgraph.org/p/M575777) | Apr 6, 2015 | Never finaled: issued Apr 2015, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | street space |  |
| [M571808](https://www.permitgraph.org/p/M571808) | Mar 24, 2015 | Never finaled: issued Mar 2015, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | street space permit |  |
| [201502178414](https://www.permitgraph.org/p/201502178414) | Feb 17, 2015 | Completed: final sign-off Apr 2015 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) | unit 32 remove existing kitchen & bath cabinets, replumb & supply new electrical from new subpanel to new kitchen cabinets. install cabinets and counterts, install tile in shower & floor bath. paint… | $18,000 |
| [201412294590](https://www.permitgraph.org/p/201412294590) | Dec 29, 2014 | Completed: final sign-off Mar 2015 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | as built drawings related to pa #201411121314; maher n/a |  |
| [201411121314](https://www.permitgraph.org/p/201411121314) | Nov 12, 2014 | Completed: final sign-off Feb 2015 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | emergency fa panel replacement. 1 facu ms 9050 ud, 1 smoke detector sd355, 1 monitor module mmf 300 | $3,500 |
| [201207316116](https://www.permitgraph.org/p/201207316116) | Jul 31, 2012 | Never finaled: issued Jul 2012, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Battalion One Fire Protection](https://www.permitgraph.org/contractor/battalion-one-fire-protection-919683) | to obtain final inspection for work approved under pa#2006-04-25-9769. all work is complete. |  |
| [201207094301](https://www.permitgraph.org/p/201207094301) | Jul 9, 2012 | Completed: final sign-off Aug 2012 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Jian Lou Construction Co.](https://www.permitgraph.org/contractor/jian-lou-construction-co-834864) | common area- replace front & rear door at basement, permit required to restore path of travel from rear to front, restore ground floor exit path to comply with nov #201848138 item #2 and nov# 2011622… | $600 |
| [201206223220](https://www.permitgraph.org/p/201206223220) | Jun 22, 2012 | Completed: final sign-off Jul 2012 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Jian Lou Construction Co.](https://www.permitgraph.org/contractor/jian-lou-construction-co-834864) | comply with nov# 201185868 #2 & #6/unit #32-remodel the kitchen, new bathroom window, no lighting change | $15,000 |
| [201206223223](https://www.permitgraph.org/p/201206223223) | Jun 22, 2012 | Completed: final sign-off Aug 2012 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Jian Lou Construction Co.](https://www.permitgraph.org/contractor/jian-lou-construction-co-834864) | unit #8-remodel the kitchen & bathroom. no lighting change | $15,000 |
| [201205301512](https://www.permitgraph.org/p/201205301512) | May 30, 2012 | Completed: final sign-off Jul 2012 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Jian Lou Construction Co.](https://www.permitgraph.org/contractor/jian-lou-construction-co-834864) | stair handrail 1/f to 6/f per nov #201148926 item #3, #53, #55, #70 | $2,000 |
| [201204128177](https://www.permitgraph.org/p/201204128177) | Apr 12, 2012 | Completed: final sign-off Jul 2012 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Luck Start Company](https://www.permitgraph.org/contractor/luck-start-company-700079) | repair deteriorated landings and stairs. (metal). remove rust, prep, prime and paint. update railing (repair work less than 50%). to comply with n.o.v. #201148926, item #3 and 4. | $15,000 |
| [M63284](https://www.permitgraph.org/p/M63284) | Apr 9, 2007 | Never finaled: issued Apr 2007, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | street space |  |
| [200607277856](https://www.permitgraph.org/p/200607277856) | Jul 27, 2006 | Never finaled: issued Jul 2006, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | renew 200506084510 for final only. |  |
| [200604259769](https://www.permitgraph.org/p/200604259769) | Apr 25, 2006 | Expired or cancelled: expired Sep 2008 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | move fire control panel from unit32 to lobby (from one side of wall to the other side). | $150 |
| [200506084510](https://www.permitgraph.org/p/200506084510) | Jun 8, 2005 | Expired or cancelled: expired Sep 2008 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | renew 200408302900 and 200405264839 to complete the work | $38,000 |
| [200503086975](https://www.permitgraph.org/p/200503086975) | Mar 8, 2005 | Completed: final sign-off Jul 2005 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | renew 200408050769,200405123629,200403128467 & 200405174022 for final inspection. |  |
| [200410136595](https://www.permitgraph.org/p/200410136595) | Oct 13, 2004 | Completed: final sign-off Nov 2004 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [High Quality Roofing Co](https://www.permitgraph.org/contractor/high-quality-roofing-co-570540) | reroofing | $32,000 |
| [200408302900](https://www.permitgraph.org/p/200408302900) | Aug 30, 2004 | Completed: final sign-off Jul 2006 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | change due to site conditions for umb seismic retrofit under original contract/bldg.appl#20020122744 | $2,500 |
| [200408050769](https://www.permitgraph.org/p/200408050769) | Aug 5, 2004 | Expired or cancelled: expired Jul 2005 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | widen hallway with header and replace with new 2x4's in bathroom | $1,000 |
| [200405264839](https://www.permitgraph.org/p/200405264839) | May 26, 2004 | Expired or cancelled: expired Sep 2008 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | renew 200201227440 for umb- seismic retrofit work. general procedure. | $60,000 |
| [200405174022](https://www.permitgraph.org/p/200405174022) | May 17, 2004 | Expired or cancelled: expired Jul 2005 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | remodel kitchen & bathroom in unit#21, new electrical & plumbing & cabinets in kitchen. bathroom new | $7,800 |
| [200405123629](https://www.permitgraph.org/p/200405123629) | May 12, 2004 | Expired or cancelled: expired Jul 2005 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | to comply with nov 200230458 work includes removing closet and kitchen in basement in exist bath, | $1,700 |
| [200403128467](https://www.permitgraph.org/p/200403128467) | Mar 12, 2004 | Never finaled: issued Mar 2004, no final | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | remodel kitchen & bathroom in unit #31. new elec & plumbing & cabinet in kitchen. bathrm new shower | $7,800 |
| [M19097](https://www.permitgraph.org/p/M19097) | Feb 26, 2002 | Expired or cancelled: expired Jun 2002 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) |  | sidewalk repair permit |  |
| [200201227440](https://www.permitgraph.org/p/200201227440) | Jan 22, 2002 | Completed: final sign-off Jul 2006 | [245 Leavenworth St](https://www.permitgraph.org/a/0337/003) | [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) | umb - seismic retrofit works-general procedure. | $105,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Nomellini Construction * Ask For Id *](https://www.permitgraph.org/contractor/nomellini-construction-ask-for-id-519273) (14), [Cepheus Builders Inc](https://www.permitgraph.org/contractor/cepheus-builders-inc-780841) (11), [Jian Lou Construction Co.](https://www.permitgraph.org/contractor/jian-lou-construction-co-834864) (4), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (2), [Battalion One Fire Protection](https://www.permitgraph.org/contractor/battalion-one-fire-protection-919683), [High Quality Roofing](https://www.permitgraph.org/contractor/high-quality-roofing-734059), [High Quality Roofing Co](https://www.permitgraph.org/contractor/high-quality-roofing-co-570540), [Luck Start Company](https://www.permitgraph.org/contractor/luck-start-company-700079)
- Architects: [Mark Hogan](https://www.permitgraph.org/professional/mark-hogan-C33268)
- Engineers: [Rod Massoudi](https://www.permitgraph.org/professional/rod-massoudi-C81412)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.