# 433 Ellis St

Block 0333, lot 021. Page: https://www.permitgraph.org/a/0333/021

- City's use: Commercial Hotel
- Built: 1911
- Stories: 3
- Units: 3
- Rooms: 15 bathrooms
- Building: 21,076 sq ft
- Lot: 6,873 sq ft
- Zoning: RC4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

13 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202203280995](https://www.permitgraph.org/p/202203280995) | Mar 28, 2022 | Completed: final sign-off Apr 2022 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) | g/f restaurant: minor repair only, no structural work, no wall modification, install new 220 outlet, gas connection for appliance, repair damaged walls (approx 10 sq. ft.), replace damaged tiles (app… | $1,200 |
| [202107194649](https://www.permitgraph.org/p/202107194649) | Jul 19, 2021 | Completed: final sign-off Sep 2021 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) | apt# 109 - kitchen upgrade. change base cabinets to stainless steel. replace old sink with new one. | $15,600 |
| [202006269192](https://www.permitgraph.org/p/202006269192) | Jun 26, 2020 | Expired or cancelled: cancelled Jan 2026 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) |  | scaffolding, stucco power washing, painting. not visible to street | $12,000 |
| [201809200959](https://www.permitgraph.org/p/201809200959) | Sep 20, 2018 | Completed: final sign-off Oct 2019 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) | demo exisiting front entrance door, existing ramp & floor at entrance. construct platform & ada lift. construct a new glass wal & door at entrance. install replacement floor at entrance, remove entra… | $28,000 |
| [201602260635](https://www.permitgraph.org/p/201602260635) | Feb 26, 2016 | Never finaled: issued Feb 2016, no final | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) | add electrical outlets in all rooms, 60 total. install tiles in front of common bathroom on 1st, 2nd and 3rd floors. | $6,200 |
| [201505267181](https://www.permitgraph.org/p/201505267181) | May 26, 2015 | Completed: final sign-off Mar 2016 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) |  | replace doors and windows for 60 units remove awining in front of building replace all street facing windows above first floor with double hung wood windows with ogee lugs. | $30,000 |
| [201502239002](https://www.permitgraph.org/p/201502239002) | Feb 23, 2015 | Completed: final sign-off Apr 2015 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) |  | replace 5 doors (smoke enclosure doors) to comply with complaint 201524821, line #5, replace in kind.; maher n/a | $200 |
| [201305217546](https://www.permitgraph.org/p/201305217546) | May 21, 2013 | Completed: final sign-off Aug 2013 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location: public restrooms, min load rating 250 lbs | $480 |
| [200808068549](https://www.permitgraph.org/p/200808068549) | Aug 6, 2008 | Never finaled: issued Aug 2008, no final | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Mike P H Construction Co](https://www.permitgraph.org/contractor/mike-p-h-construction-co-616325) | reroofing. | $15,000 |
| [200503107225](https://www.permitgraph.org/p/200503107225) | Mar 10, 2005 | Completed: final sign-off Mar 2005 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) |  | to renew for final only pa# 2002/09/27/7635. fire sprinkler vp code per sro reg. |  |
| [200410055946](https://www.permitgraph.org/p/200410055946) | Oct 5, 2004 | Completed: final sign-off Dec 2004 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) |  | 3 bathroom 2'x6"x6' ventilation. discharge fax ul60 cfm 4.5 fan modle #673 insulated | $600 |
| [200402106093](https://www.permitgraph.org/p/200402106093) | Feb 10, 2004 | Completed: final sign-off Aug 2004 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Fire & Security & Alarm Co/ F.S.A.C.](https://www.permitgraph.org/contractor/fire-security-alarm-co-f-s-a-c-690774) | upgrade (e) fire alarm system to comply with ada codes | $20,000 |
| [200209277635](https://www.permitgraph.org/p/200209277635) | Sep 27, 2002 | Expired or cancelled: expired Mar 2005 | [433 Ellis St](https://www.permitgraph.org/a/0333/021) | [Global Fire Protection **See Note***](https://www.permitgraph.org/contractor/global-fire-protection-see-note-648829) | fire sprinkler upgrade per sro req. | $7,900 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Swift Construction](https://www.permitgraph.org/contractor/swift-construction-939223) (5), [Fire & Security & Alarm Co/ F.S.A.C.](https://www.permitgraph.org/contractor/fire-security-alarm-co-f-s-a-c-690774), [Global Fire Protection **See Note***](https://www.permitgraph.org/contractor/global-fire-protection-see-note-648829), [Mike P H Construction Co](https://www.permitgraph.org/contractor/mike-p-h-construction-co-616325)
- Architects: [Ronald Perner](https://www.permitgraph.org/professional/ronald-perner-C4452)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0333/021.
