# 100 Stockton St

Block 0313, lot 017. Page: https://www.permitgraph.org/a/0313/017

- City's use: Commercial Office
- Built: 1974
- Stories: 7
- Units: 1
- Building: 263,640 sq ft
- Lot: 31,440 sq ft
- Zoning: C3R
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

148 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202611170892](https://www.permitgraph.org/p/202611170892) | Nov 17, 2026 | In progress: filed Nov 2026, not yet issued | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 7/f: mech, electrical and l,umbing work for t.i. under pa 202610159470. | $350,000 |
| [202611160829](https://www.permitgraph.org/p/202611160829) | Nov 16, 2026 | In progress: filed Nov 2026, not yet issued | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | revision to 202607275619. scope includes updates to commercial interior renovation of existing retail space. work includes non load bearing wall, finishes, new fixtures mep. no change of use occupanc… | $50,000 |
| [202611160831](https://www.permitgraph.org/p/202611160831) | Nov 16, 2026 | In progress: filed Nov 2026, not yet issued | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | revision to pa# 202607235449: scope includes; framing for dumbwaiter, hoist and beam and finish updates for interior tenant improvement which involved non-load bearing walls finishes, light fixtures,… | $175,000 |
| [202611020229](https://www.permitgraph.org/p/202611020229) | Nov 9, 2026 | In progress: filed Nov 2026, not yet issued | [100 Stockton St](https://www.permitgraph.org/a/0313/017) |  | deferred electrical(1st and 3rd floor)bpa#202607295760 |  |
| [202610290070](https://www.permitgraph.org/p/202610290070) | Oct 29, 2026 | In progress: filed Oct 2026, not yet issued | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | new non load bearing partitions, ceilings millwork and finishes to create 2 single user restrooms and 1 multi stall agr, new corridor. plumbing , elec and mech included | $250,000 |
| [202610159470](https://www.permitgraph.org/p/202610159470) | Oct 15, 2026 | In progress: filed Oct 2026, not yet issued | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | tenant improvement on the 7th fl to include conference rooms, concentrated assembly forum, prefunction and ancillary support spaces. industry non load bearing paritoins,ceilings, finishes, millwork. | $2,200,000 |
| [202608287374](https://www.permitgraph.org/p/202608287374) | Aug 28, 2026 | In progress: issued Sep 2026 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Bobcomm Llc Dba Pacific Das Llc.](https://www.permitgraph.org/contractor/bobcomm-llc-dba-pacific-das-llc-1108656) | replacing existing amplifier to meet current sfdt standards. | $20,000 |
| [202607295760](https://www.permitgraph.org/p/202607295760) | Jul 29, 2026 | In progress: issued Oct 2026 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing. | $14,150,000 |
| [202607275619](https://www.permitgraph.org/p/202607275619) | Jul 27, 2026 | In progress: issued Nov 2026 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new fu… | $750,000 |
| [202607235449](https://www.permitgraph.org/p/202607235449) | Jul 23, 2026 | In progress: issued Oct 2026 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 1/f: interior t.i to expand an (e) m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sqft. the adjacent space is under… | $1,250,000 |
| [202605211708](https://www.permitgraph.org/p/202605211708) | May 21, 2026 | In progress: issued Jul 2026 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | shoring and demo. levels 1-3 interior. | $173,545 |
| [202603036864](https://www.permitgraph.org/p/202603036864) | Apr 30, 2026 | In progress: issued Jul 2026 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) |  | core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant. | $1,200,000 |
| [202511200067](https://www.permitgraph.org/p/202511200067) | Dec 31, 2025 | In progress: issued Jan 2026 | [40 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | sign type r-2 tenant identify blade sign "convene". fabricate and install (1) internally illuminated secondary blade sing (double face). coneecting to power source (by others) with dedicated 20 amp c… | $2,775 |
| [202408168901](https://www.permitgraph.org/p/202408168901) | Aug 16, 2024 | In progress: issued Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | to obtain final inspection for work approved under pa#: 2021.0408.8200, 2021.0528.1299 and 2021.0917.8644 all work is complete. |  |
| [202408168907](https://www.permitgraph.org/p/202408168907) | Aug 16, 2024 | Completed: final sign-off Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | to obtain final inspection for work approved under 202112275035 and 202112285097. |  |
| [202408168902](https://www.permitgraph.org/p/202408168902) | Aug 16, 2024 | Completed: final sign-off Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | to obtain final inspection for work approved under pa#: 2018.0820.7773, 2018.1128.6842 and 2019.0226.3805. all work is complete. |  |
| [202405232755](https://www.permitgraph.org/p/202405232755) | May 23, 2024 | In progress: issued May 2024 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | 4 evacuation plan maps floor 1, 6, 8, 7 | $1,800 |
| [202310269537](https://www.permitgraph.org/p/202310269537) | Oct 26, 2023 | Completed: final sign-off Nov 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | mofidy sprinkler head locations to accommodate new ceiling/partition layout for (e) restaurant @ basement, 1/f & 8/f, as built rev: total upright sprinklers: 59. ref bpa#202301270867 & 202309227175 |  |
| [202310168746](https://www.permitgraph.org/p/202310168746) | Oct 16, 2023 | Never finaled: issued Oct 2023, no final | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | 4-5/f: as-builts to pa# 202309126405, revised maps |  |
| [202309227175](https://www.permitgraph.org/p/202309227175) | Sep 22, 2023 | Completed: final sign-off Oct 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | revision to pa# 202301270867, modify sprinkler head location to accommodate new ceiling and partition layout for existing restaurant space on 8th flr. total added uprights 57. total plugged pendents… | $29,298 |
| [202309126405](https://www.permitgraph.org/p/202309126405) | Sep 12, 2023 | Completed: final sign-off Nov 2023 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | level 4 & 5: new evacuation maps. | $2,000 |
| [202309116260](https://www.permitgraph.org/p/202309116260) | Sep 11, 2023 | Completed: final sign-off Feb 2024 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install electric wall single faced sign chotto matte (sign a) | $5,000 |
| [202309116256](https://www.permitgraph.org/p/202309116256) | Sep 11, 2023 | Completed: final sign-off Feb 2024 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install electric wall projecting double faced sign chotto matte (sign b) | $5,000 |
| [202308154426](https://www.permitgraph.org/p/202308154426) | Aug 15, 2023 | Completed: final sign-off Oct 2023 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | tenant improvement scope: a fire alarm system tenant improvement is taking place @ the 1st,4th & 5th floor levels.1st floor is small and doe snot effect the (e)desing. | $67,200 |
| [202308154404](https://www.permitgraph.org/p/202308154404) | Aug 15, 2023 | Completed: final sign-off Sep 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | furnish and install one (1) ansual r-102 fire suppression system in the main kitchen area on the 5 fl. ref 202212218887. | $12,000 |
| [202307202638](https://www.permitgraph.org/p/202307202638) | Jul 20, 2023 | Completed: final sign-off Oct 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service. | $5,000 |
| [202305127726](https://www.permitgraph.org/p/202305127726) | May 12, 2023 | Completed: final sign-off Feb 2025 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5/f kitchen: deferred mep pa# 2022-1221-8887, flrs 4 & 5 | $326,880 |
| [202305127705](https://www.permitgraph.org/p/202305127705) | May 12, 2023 | Completed: final sign-off Oct 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deferred mep 1st, 4th, 5th fl. ref 202211096227 | $326,880 |
| [202305127722](https://www.permitgraph.org/p/202305127722) | May 12, 2023 | Completed: final sign-off Oct 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mep deferred pa# 202211237089. 4th & 5th fl exhaust fans. | $326,880 |
| [202305087285](https://www.permitgraph.org/p/202305087285) | May 8, 2023 | Completed: final sign-off Apr 2024 | [100 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1/f, 6/f, 7/f & 8/f: t.i., no changes to smoke control sequence or smoke control, provide/install new remote annunciator per plans, adjust (e) devices due to new ceiling height. ref bpa#202212168520… | $23,215 |
| [202305087289](https://www.permitgraph.org/p/202305087289) | May 8, 2023 | Never finaled: issued May 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers relocate 106 penden sprinklers and relocate 55 uprights on 4th fl. relocate 131 pend sprink and 49 uprighs and 3 dry pendents 5th fl. relocate 4 pendent sprinklers relocate 2 uprights… | $189,200 |
| [202304125600](https://www.permitgraph.org/p/202304125600) | Apr 12, 2023 | Never finaled: issued Jun 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637), [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | electric transom portal sign "convene", projecting, single face | $10,000 |
| [202304125603](https://www.permitgraph.org/p/202304125603) | Apr 12, 2023 | Never finaled: issued Jun 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637), [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) | electric dbl faced projecting wall sign "convene" | $7,500 |
| [202304075312](https://www.permitgraph.org/p/202304075312) | Apr 7, 2023 | Completed: final sign-off Oct 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to pa# 202211096227, reconfigure lobby layout including relocate furring partitions and reception desk no alterations to permitted accessible path of egress path. |  |
| [M1230367](https://www.permitgraph.org/p/M1230367) | Mar 13, 2023 | Never finaled: issued Mar 2023, no final | [30 Ofarrell St](https://www.permitgraph.org/a/0313/017) |  | per pa #201805048215 #201805048215s, add addresses 30, 40, 60, 70 ofarrell st to apn 0313/017 |  |
| [M1230368](https://www.permitgraph.org/p/M1230368) | Mar 13, 2023 | Never finaled: issued Mar 2023, no final | [100 Stockton St](https://www.permitgraph.org/a/0313/017) |  | per pa #201805048215 #201805048215s, add addresses 100, 110, 130 stockton st to apn 0313/017 |  |
| [202303083273](https://www.permitgraph.org/p/202303083273) | Mar 8, 2023 | Completed: final sign-off Jan 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | tenant improvement, fire alarm system taking place at the level 1 which consist of creating (5) tenant space | $35,000 |
| [202302152008](https://www.permitgraph.org/p/202302152008) | Feb 15, 2023 | Completed: final sign-off Mar 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | convert (28) uprights to pendents add 3 pendents. ref pa 2022-1222-9002 & 202212168520 | $6,200 |
| [202302131882](https://www.permitgraph.org/p/202302131882) | Feb 13, 2023 | Completed: final sign-off Sep 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Calasia Construction Inc](https://www.permitgraph.org/contractor/calasia-construction-inc-938255) | suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this pe… |  |
| [202302101754](https://www.permitgraph.org/p/202302101754) | Feb 10, 2023 | Completed: final sign-off Oct 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Edison Fire Extinguisher Company Inc](https://www.permitgraph.org/contractor/edison-fire-extinguisher-company-inc-569185) | installation of new ul300 tank hood and fire suppression system | $6,600 |
| [202302021248](https://www.permitgraph.org/p/202302021248) | Feb 2, 2023 | Completed: final sign-off Oct 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | a fire alarm system tenant improvement is taking place in the basement first and 8th floor levels, basement and 1st floor areas are small | $62,260 |
| [202301270867](https://www.permitgraph.org/p/202301270867) | Jan 27, 2023 | Completed: final sign-off Oct 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler head locations to accomodate new ceiling and partition layout for existing restaurant space on basement, 1/f, 8/f. total sprinker 105 | $53,970 |
| [202301260753](https://www.permitgraph.org/p/202301260753) | Jan 26, 2023 | Expired or cancelled: withdrawn Oct 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate system shut off valve, alarm valve & drain system closer to newly installed access panel on 1st floor. coring through 1st floor to basement level to connect level one drain pupe to main drai… | $16,046 |
| [202212229002](https://www.permitgraph.org/p/202212229002) | Dec 22, 2022 | Never finaled: issued Feb 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ground flr: ti mechanical, electrical and plumbing, ref # 202208241210 | $195,000 |
| [202212218887](https://www.permitgraph.org/p/202212218887) | Dec 21, 2022 | Completed: final sign-off Sep 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4/f & 5/f: buildout of support pantry & service kitchen, partitions, ceilings, fixtures, finishes, kitchen equipment. ref bpa#202211237089 for convene t.i. mep deferred. | $250,000 |
| [202212168520](https://www.permitgraph.org/p/202212168520) | Dec 16, 2022 | Never finaled: issued Jan 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office ame… | $450,000 |
| [202211237089](https://www.permitgraph.org/p/202211237089) | Nov 23, 2022 | Completed: final sign-off Feb 2025 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to asse… | $2,000,000 |
| [202211226996](https://www.permitgraph.org/p/202211226996) | Nov 22, 2022 | Completed: final sign-off Feb 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 1st flr - add (4) pendent sprinkler heads and (14) uprights total (18) heads. gcti #202208241210. | $2,700 |
| [202211096227](https://www.permitgraph.org/p/202211096227) | Nov 9, 2022 | Completed: final sign-off Feb 2025 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceilin… | $150,000 |
| [202209011699](https://www.permitgraph.org/p/202209011699) | Sep 1, 2022 | Never finaled: issued Sep 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | all floores: 57 evacuation plan maps. | $24,225 |
| [202208261405](https://www.permitgraph.org/p/202208261405) | Aug 26, 2022 | Expired or cancelled: cancelled Jan 2026 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | type 1 kitchenhood associated with ti pa#202202168080 | $25,000 |
| [202208241210](https://www.permitgraph.org/p/202208241210) | Aug 24, 2022 | Never finaled: issued Sep 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | g/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only) | $1,272,550 |
| [202208110324](https://www.permitgraph.org/p/202208110324) | Aug 11, 2022 | Never finaled: issued Jan 2023, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to pa202204212700; to add additional ductwork on basement level; ref 202112285092. maher n/a. | $5,000 |
| [202207219000](https://www.permitgraph.org/p/202207219000) | Jul 21, 2022 | Never finaled: issued Aug 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above (e) concrete installed under bpa#202008101490 in preperation of future t.i. no demo of (e) co… | $1,200,000 |
| [202206247082](https://www.permitgraph.org/p/202206247082) | Jun 24, 2022 | Completed: final sign-off Jul 2022 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | basement, l1,l2: t.i.: no changes to smoke control, no elevator work. new audible & visual - 3 strobes, 3 speakers, 5 smoke detectors. ref pa202112285092 | $32,190 |
| [202204252872](https://www.permitgraph.org/p/202204252872) | Apr 25, 2022 | Completed: final sign-off Jun 2022 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | (basement, 1st & 2nd fl) relocate & add sprinklers due to new space. 14 pendents, 2 uprights. ref pa# 202112285092. | $8,000 |
| [202204212700](https://www.permitgraph.org/p/202204212700) | Apr 21, 2022 | Never finaled: issued Jun 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | mep: basement, 1st, and 2nd floor: tennant improvement ref pa#202112285092 to include new ductwork, new power and data for work stations and offices, new power for breakroom. new lighting and control… | $120,000 |
| [202202168080](https://www.permitgraph.org/p/202202168080) | Feb 16, 2022 | Completed: final sign-off Sep 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sunshine Comm'l Constr. Inc.](https://www.permitgraph.org/contractor/sunshine-comm-l-constr-inc-591407), [Calasia Construction Inc](https://www.permitgraph.org/contractor/calasia-construction-inc-938255) | interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech… | $6,250,000 |
| [202112285092](https://www.permitgraph.org/p/202112285092) | Dec 28, 2021 | Never finaled: issued Mar 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215 | $1,460,000 |
| [202112285097](https://www.permitgraph.org/p/202112285097) | Dec 28, 2021 | Expired or cancelled: expired Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to addendum 3 of 201805045215 and 202008101490. limited to a revised fan damper matrix on sheet m801 |  |
| [202112275035](https://www.permitgraph.org/p/202112275035) | Dec 27, 2021 | Expired or cancelled: expired Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only. |  |
| [202112224878](https://www.permitgraph.org/p/202112224878) | Dec 22, 2021 | Completed: final sign-off Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to pa# 2018-0504-8215 addendum #8 update elevator matrix |  |
| [202112154449](https://www.permitgraph.org/p/202112154449) | Dec 15, 2021 | Completed: final sign-off Mar 2023 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | revision to permit 201805048215-s8 two way communication only. change from rath 2400-808nspm call stations to rath 2400-808nsp call stations. |  |
| [202112023527](https://www.permitgraph.org/p/202112023527) | Dec 2, 2021 | Expired or cancelled: cancelled Jan 2026 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | suite 856: upgrades include structural reinforcement for future roof opening, future skylight, future landscap aeras and future boulder fixtures. | $175,000 |
| [202109178644](https://www.permitgraph.org/p/202109178644) | Sep 17, 2021 | Never finaled: issued Sep 2021, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment… |  |
| [202105281299](https://www.permitgraph.org/p/202105281299) | May 28, 2021 | Never finaled: issued Sep 2021, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215 | $60,000 |
| [202104088200](https://www.permitgraph.org/p/202104088200) | Apr 8, 2021 | Never finaled: issued Jan 2022, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str). | $50,000 |
| [202008131716](https://www.permitgraph.org/p/202008131716) | Aug 13, 2020 | Never finaled: issued Feb 2021, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) r… | $250,000 |
| [202008101490](https://www.permitgraph.org/p/202008101490) | Aug 10, 2020 | Never finaled: issued Dec 2021, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade. | $1,100,000 |
| [M1151827](https://www.permitgraph.org/p/M1151827) | Oct 11, 2019 | Never finaled: issued Oct 2019, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | street space |  |
| [M1058227](https://www.permitgraph.org/p/M1058227) | Mar 29, 2019 | Never finaled: issued Apr 2019, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | street space and metered parking. |  |
| [201902263805](https://www.permitgraph.org/p/201902263805) | Feb 26, 2019 | Expired or cancelled: expired Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13** | $300,000 |
| [M1042587](https://www.permitgraph.org/p/M1042587) | Feb 22, 2019 | Never finaled: issued Feb 2019, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | street space |  |
| [M1025708](https://www.permitgraph.org/p/M1025708) | Jan 9, 2019 | Never finaled: issued Feb 2019, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | street space |  |
| [201811286842](https://www.permitgraph.org/p/201811286842) | Nov 28, 2018 | Expired or cancelled: expired Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | rooftop and basement slab demo. | $1,000 |
| [201808207773](https://www.permitgraph.org/p/201808207773) | Aug 20, 2018 | Expired or cancelled: expired Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215 | $100,000 |
| [201805048215](https://www.permitgraph.org/p/201805048215) | May 4, 2018 | Completed: final sign-off Aug 2024 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher** | $80,000,000 |
| [201603303444](https://www.permitgraph.org/p/201603303444) | Mar 30, 2016 | Completed: final sign-off May 2016 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm adding 2 strobes and 1 horn/strobe to the (e) fire alarm system due to a ti on the 3rd floor. ref pa 2015-1218-5524. maher na | $1,700 |
| [201601207497](https://www.permitgraph.org/p/201601207497) | Jan 20, 2016 | Never finaled: issued Feb 2016, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Build By Design](https://www.permitgraph.org/contractor/build-by-design-879791) | install 2 new circuits to new cash wrap. 1 new circuit to back of house. new floor fixtures in e space. no modifications to sprinkler | $15,000 |
| [201512185524](https://www.permitgraph.org/p/201512185524) | Dec 18, 2015 | Completed: final sign-off May 2016 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Sachse Construction And Dev.](https://www.permitgraph.org/contractor/sachse-construction-and-dev-721717) | 34d fkiirl t.i. for hugo boss boutique in macy's men's store on 3rd floor. no exterior work. no mechanical work. lighting only. signage under separate permit. n/a maher ord. 155-13 | $142,000 |
| [201509046249](https://www.permitgraph.org/p/201509046249) | Sep 4, 2015 | Completed: final sign-off Oct 2015 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | ground flr: minor ti for m. kors work includes (n) fixtures, finishes, elec recpetacles. no change to mep/fire/life safety. maher na | $80,000 |
| [201501236572](https://www.permitgraph.org/p/201501236572) | Jan 23, 2015 | Completed: final sign-off Feb 2015 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 13 fire sprinklers and install seismic end- of - line graces. ref #201501216281. n/a meher ordinance | $7,000 |
| [201501216281](https://www.permitgraph.org/p/201501216281) | Jan 21, 2015 | Completed: final sign-off Jun 2015 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Freeman Construction Company](https://www.permitgraph.org/contractor/freeman-construction-company-895713) | 3/f: tenant improvement inc sportswear expansion. includes interior partitions, minor ceiling remodel, floor and wall finishes, fixutre. elec mech sep permit. compliance with maher ordinance no 155-1… | $59,585 |
| [201411050806](https://www.permitgraph.org/p/201411050806) | Nov 5, 2014 | Never finaled: issued Nov 2014, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) | replace in kind the canopy taken down for mta. central sub way project. originally canopy was taken down under 201406168543. bldg required that we provide another permit to reattach (attchment detail… |  |
| [201408042904](https://www.permitgraph.org/p/201408042904) | Aug 4, 2014 | Completed: final sign-off Aug 2014 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 3 fire sprinklers. ref app#201406269584. n/a for the maher ordiance #155-13 | $1,280 |
| [201406269584](https://www.permitgraph.org/p/201406269584) | Jun 26, 2014 | Completed: final sign-off Dec 2014 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [West Coast Commercial Interiors](https://www.permitgraph.org/contractor/west-coast-commercial-interiors-863703) | t.i. demo extg millwork and finishes. install new millwork flooring and finishes with associcated electrical. no ceiling lighting changes. no mechanical changes. all electrical, sprklr,fire alarm wor… | $15,000 |
| [201406168543](https://www.permitgraph.org/p/201406168543) | Jun 16, 2014 | Never finaled: issued Jun 2014, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) | central subway project 2 of 3 canopies must be removed to accomodate equipment which will dig a constrn. emergency egress route from tunnel. awnings no.1 and no. 2 on o'farrell to be removed, stored.… | $50,000 |
| [201405075162](https://www.permitgraph.org/p/201405075162) | May 7, 2014 | Never finaled: issued May 2014, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Marini Construction Inc](https://www.permitgraph.org/contractor/marini-construction-inc-699352) | revision to pa # 2014-0304-9793 - change address from 170 ofarrell to 120 stockton space 428: t.i project for a michael kors vender shop inside macy's store. work to include elect., flooring, drywall… | $199,534 |
| [201310240141](https://www.permitgraph.org/p/201310240141) | Oct 24, 2013 | Never finaled: issued Oct 2013, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 9 fire sprinklers on the 3rd fl. ref permit #201310159187 | $4,000 |
| [201310159187](https://www.permitgraph.org/p/201310159187) | Oct 15, 2013 | Completed: final sign-off Nov 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Compass Construction](https://www.permitgraph.org/contractor/compass-construction-469366) | 3rd floor-tenant improvement of an (e) calvin klein area-new display shelving, display racks, new flooring, new partial ceiling soffit & associated electrical | $75,000 |
| [201309136830](https://www.permitgraph.org/p/201309136830) | Sep 13, 2013 | Completed: final sign-off Oct 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Granger Contracting Company Incorporated](https://www.permitgraph.org/contractor/granger-contracting-company-incorporated-779431) | remodel sales floor. add new cash wrap | $38,000 |
| [201207316146](https://www.permitgraph.org/p/201207316146) | Jul 31, 2012 | Completed: final sign-off Mar 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | revision to 201206061979 due to field changes. add 7 devices and removing 2 sd. | $3,000 |
| [201206061979](https://www.permitgraph.org/p/201206061979) | Jun 6, 2012 | Completed: final sign-off Mar 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 24 horn strobes, 6 strobes, 2 smoke detectors, 1 horn and 1 relay on the 7th fl | $19,000 |
| [201205170649](https://www.permitgraph.org/p/201205170649) | May 17, 2012 | Completed: final sign-off May 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | 6th floor-partial 10th storage rock instllation. t.i approved under pa# 2011-1104-8325. sprinkler revisions under separate application. | $40,000 |
| [201203196350](https://www.permitgraph.org/p/201203196350) | Mar 19, 2012 | Completed: final sign-off Jan 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) | install storage racks in basement level storage room. nfpa 13 owner's certificate included- sprinklera and fire alarm separate permit. | $10,000 |
| [201203125902](https://www.permitgraph.org/p/201203125902) | Mar 12, 2012 | Completed: final sign-off Jun 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | interior non structural improvements to the 1st floor of extg macy's to install a new vender in a 550 sq ft. floor lease area. | $32,750 |
| [201203065452](https://www.permitgraph.org/p/201203065452) | Mar 6, 2012 | Completed: final sign-off Mar 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 21 plugs, 2 plugs, 5 sprinlkers | $12,000 |
| [201202103994](https://www.permitgraph.org/p/201202103994) | Feb 10, 2012 | Completed: final sign-off Mar 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) | install storage racks in storage room on the 6th floor. ti under 201111048325 | $20,000 |
| [201201262980](https://www.permitgraph.org/p/201201262980) | Jan 26, 2012 | Completed: final sign-off Feb 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | interior non structural tenant improvement to the 2nd and 3rd floors extg macy's men's retail work to include cabinet and shelving remodel and lighting. fire alarm and sprinkler under seperate permit. | $32,794 |
| [201201112046](https://www.permitgraph.org/p/201201112046) | Jan 11, 2012 | Completed: final sign-off May 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 1st floor:relocate 56, add 3, change 81 and plug 7 fire sprinklers. | $36,000 |
| [201111158981](https://www.permitgraph.org/p/201111158981) | Nov 15, 2011 | Expired or cancelled: withdrawn Apr 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | replace (e) exterior entrance doors at the two customer entrances. ti approved under pa #201111048325 | $10,000 |
| [201111048325](https://www.permitgraph.org/p/201111048325) | Nov 4, 2011 | Completed: final sign-off Feb 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | interior tenant improvement on the 1st and 6th floors. no exterior work this permit. | $257,560 |
| [201110116496](https://www.permitgraph.org/p/201110116496) | Oct 11, 2011 | Completed: final sign-off Feb 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) | macy's. install storage rack in storage rooms on the 4th floor. ti approved under pa# 2011.08.16.2547 | $20,000 |
| [201109305889](https://www.permitgraph.org/p/201109305889) | Sep 30, 2011 | Completed: final sign-off Mar 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 4th floor-relocate 34 & plug 19 fire sprinklers only | $15,000 |
| [201108162548](https://www.permitgraph.org/p/201108162548) | Aug 16, 2011 | Completed: final sign-off Dec 2011 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) | revision to pa #201108011404 to show aisle width dimensions 5th floor at stock rooms/storage areas. | $500 |
| [201108162547](https://www.permitgraph.org/p/201108162547) | Aug 16, 2011 | Completed: final sign-off Feb 2012 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | 4th floor t.i. interior non-structural work of existing bldg, new partitions & lighting. | $178,449 |
| [201108122329](https://www.permitgraph.org/p/201108122329) | Aug 12, 2011 | Completed: final sign-off Feb 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | voluntary upgrade of an existing fire alarm system. replace facp and all initiating devices and some notification appliances. | $196,000 |
| [201108041802](https://www.permitgraph.org/p/201108041802) | Aug 4, 2011 | Completed: final sign-off Sep 2011 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocated 255 fire sprinklers, plug 24 fire sprinklers on the 5th floor only- pipe schedule- new siesmic bracing- | $94,500 |
| [201108011404](https://www.permitgraph.org/p/201108011404) | Aug 1, 2011 | Completed: final sign-off Dec 2011 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) | 5th floor-tenant improvement-storage racks only (6495 sf) | $81,700 |
| [201106228717](https://www.permitgraph.org/p/201106228717) | Jun 22, 2011 | Completed: final sign-off Feb 2013 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | interior non structural t i to lower level 14,000 sq ft half of floor. install partitions, new electrical floor outlets and light fixtures. extg restroom accessories will be upgraded for accessibilty. | $47,994 |
| [201105206495](https://www.permitgraph.org/p/201105206495) | May 20, 2011 | Completed: final sign-off Dec 2011 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | 5th floor tenant improvement for retail sales area. life safety permits separate. | $243,944 |
| [201104264830](https://www.permitgraph.org/p/201104264830) | Apr 26, 2011 | Completed: final sign-off Dec 2011 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | interior non-structural demo to (e) building 5th. flr. (per ab-017) structural slab under separate permits | $80,000 |
| [201011104733](https://www.permitgraph.org/p/201011104733) | Nov 10, 2010 | Never finaled: issued Nov 2010, no final | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | macy's men store. remove an existing exterior canopy on south side of building, also required one lane of traffic is closed for equipment use | $16,000 |
| [200910058306](https://www.permitgraph.org/p/200910058306) | Oct 5, 2009 | Completed: final sign-off Dec 2009 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | 7th fl - remove communicating opening on 7th floor and infill with 3hr rated construction | $8,500 |
| [200906241145](https://www.permitgraph.org/p/200906241145) | Jun 24, 2009 | Completed: final sign-off Jul 2009 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | to obtain final inspection for work approved under pa 200607035609; all work is complete |  |
| [200906241149](https://www.permitgraph.org/p/200906241149) | Jun 24, 2009 | Completed: final sign-off Jul 2009 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | to obtain final inspection for work approved under pa 200608290879; all work is complete |  |
| [200711077498](https://www.permitgraph.org/p/200711077498) | Nov 7, 2007 | Never finaled: issued Nov 2007, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [West Coast Commercial Interiors](https://www.permitgraph.org/contractor/west-coast-commercial-interiors-863703) | renew pa# 200607035609 for final inspection |  |
| [M79305](https://www.permitgraph.org/p/M79305) | Jul 26, 2007 | Never finaled: issued Jul 2007, no final | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) |  | street space |  |
| [200608290879](https://www.permitgraph.org/p/200608290879) | Aug 29, 2006 | Expired or cancelled: expired Mar 2009 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 9 and plug 26 fire sprinklers on the 3rd floor only | $2,850 |
| [200607035609](https://www.permitgraph.org/p/200607035609) | Jul 3, 2006 | Completed: final sign-off Mar 2007 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | demolition & construction of non structural interior partitions, ceilings & finishes. any mech. elec or plumbing work required as a result of this work is to be design/build under a separate permit. | $80,000 |
| [200606154123](https://www.permitgraph.org/p/200606154123) | Jun 15, 2006 | Completed: final sign-off Dec 2006 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | water fountain is non compliant. revision to app #200602074014 |  |
| [200602074014](https://www.permitgraph.org/p/200602074014) | Feb 7, 2006 | Completed: final sign-off Dec 2006 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | demo & cnstruction of non structural partitions, door, millwork & finishes in an existing macy's dept store. all mechanical, elec or plumbing work to be performed under a separate permit, any alterat… | $70,000 |
| [200507117298](https://www.permitgraph.org/p/200507117298) | Jul 11, 2005 | Never finaled: issued Jul 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate (3) and plug (1) fire sprinkler on the basement level only | $850 |
| [200506023994](https://www.permitgraph.org/p/200506023994) | Jun 2, 2005 | Never finaled: issued Jun 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate (26) and add (11) fire sprinklers on the 4th floor | $7,500 |
| [200505051628](https://www.permitgraph.org/p/200505051628) | May 5, 2005 | Never finaled: issued May 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | demo,partitions,mill work,door,column wrap,new partition,mill work,column wrap,new carpet if needed. | $30,000 |
| [200504281084](https://www.permitgraph.org/p/200504281084) | Apr 28, 2005 | Never finaled: issued May 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add notification appliances to the fire alarm system in basement,2/f,4/f due to remodel of fitting | $31,500 |
| [200503318845](https://www.permitgraph.org/p/200503318845) | Mar 31, 2005 | Never finaled: issued Mar 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 12 fire sprinklers in basement,18 fire sprinklers on 2/f & 8 fire sprinklers on 4/f to | $7,500 |
| [200502185780](https://www.permitgraph.org/p/200502185780) | Feb 18, 2005 | Never finaled: issued Feb 2005, no final | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | tenant improvement of fitting rooms on lower level, 2nd floor & 3rd floor & 4th flr | $75,000 |
| [200403108262](https://www.permitgraph.org/p/200403108262) | Mar 10, 2004 | Completed: final sign-off Aug 2004 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | add 14 fire sprinklers at the basement slab opening to rpovide a water curtain. | $1,680 |
| [200307169616](https://www.permitgraph.org/p/200307169616) | Jul 16, 2003 | Expired or cancelled: expired Aug 2011 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | adding to (e) fire alarm system due to remodel of basement and 1st floor | $27,000 |
| [200306046301](https://www.permitgraph.org/p/200306046301) | Jun 4, 2003 | Completed: final sign-off Aug 2004 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | structural only- openings in slab. prv app 200304232956. ti is being done unders wep permit. title | $100,000 |
| [200306036099](https://www.permitgraph.org/p/200306036099) | Jun 3, 2003 | Completed: final sign-off Aug 2004 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | fire sprinkler alterationpbasemnt 197 fire sprinkle,1st fl: 18 fire sprinkler,3rd fl 11 f/s relocate | $24,000 |
| [200304232912](https://www.permitgraph.org/p/200304232912) | Apr 23, 2003 | Completed: final sign-off Jun 2003 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | demolition of non structural partitions. ceiling. flooring and finishes. t.i permit to follow | $30,000 |
| [200304232956](https://www.permitgraph.org/p/200304232956) | Apr 23, 2003 | Completed: final sign-off Aug 2004 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | remodel basement,gr flr,alterations to sales floors, fitting rm partitions, fixtures, sales stations | $300,000 |
| [200204234688](https://www.permitgraph.org/p/200204234688) | Apr 23, 2002 | Expired or cancelled: expired Jan 2004 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195) | replace 1 a/c unit on roof. like for like 15 tons | $23,489 |
| [200110221322](https://www.permitgraph.org/p/200110221322) | Oct 22, 2001 | Completed: final sign-off Dec 2001 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 3/fl. -correct address on appl#200108307245 work is in "kenneth cole"area | $4,800 |
| [200110120596](https://www.permitgraph.org/p/200110120596) | Oct 12, 2001 | Completed: final sign-off Jul 2002 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | minor remodel interior/ cabinets | $15,000 |
| [200109208858](https://www.permitgraph.org/p/200109208858) | Sep 20, 2001 | Completed: final sign-off Oct 2001 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | app 2001/09/06/7712 comm t.i. for new flooring, ceiling, wall finishes & returbishing , fitting room | $72,000 |
| [200106151677](https://www.permitgraph.org/p/200106151677) | Jun 15, 2001 | Expired or cancelled: expired Jun 2003 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | retrail tenant improvement | $120,000 |
| [200106121279](https://www.permitgraph.org/p/200106121279) | Jun 12, 2001 | Expired or cancelled: withdrawn Jul 2001 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) |  | remove partition walls doors millwork finishes or fixtures provide fitting rooms and partitions per | $250,000 |
| [200009069790](https://www.permitgraph.org/p/200009069790) | Sep 6, 2000 | Completed: final sign-off Dec 2000 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate 47 sprinklers | $4,800 |
| [200008248723](https://www.permitgraph.org/p/200008248723) | Aug 24, 2000 | Expired or cancelled: expired Feb 2001 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) | [Lakewood Const Specialtie](https://www.permitgraph.org/contractor/lakewood-const-specialtie-595312) | installation of hugo boss casework, new fitting rooms & lighting on 3rd fl only | $25,000 |
| [200008228596](https://www.permitgraph.org/p/200008228596) | Aug 22, 2000 | Expired or cancelled: expired Mar 2002 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | new partitions in "perry ellis" area of 3rd fl @ macys mens. hc complies. no ceiling/lighting/hvac w | $15,000 |
| [200007276352](https://www.permitgraph.org/p/200007276352) | Jul 27, 2000 | Completed: final sign-off Jan 2001 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | add wall and door in sales area @ 3rd fl. | $15,000 |
| [200007195552](https://www.permitgraph.org/p/200007195552) | Jul 19, 2000 | Completed: final sign-off Dec 2000 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | remodel space at macy's | $65,000 |
| [200007145154](https://www.permitgraph.org/p/200007145154) | Jul 14, 2000 | Completed: final sign-off Dec 2000 | [120 Stockton St](https://www.permitgraph.org/a/0313/017) |  | interior non-structual demo |  |
| [200005261185](https://www.permitgraph.org/p/200005261185) | May 26, 2000 | Expired or cancelled: expired Nov 2000 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm addition to existing system | $8,174 |
| [200004106843](https://www.permitgraph.org/p/200004106843) | Apr 10, 2000 | Expired or cancelled: expired Aug 2000 | [50 Ofarrell St](https://www.permitgraph.org/a/0313/017) |  | fire alarm modification. | $1,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (15), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) (15), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (11), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (10), [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) (10), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (7), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (6), [Big Joe California North Inc](https://www.permitgraph.org/contractor/big-joe-california-north-inc-931417) (5), [Corporate Sign Systems](https://www.permitgraph.org/contractor/corporate-sign-systems-765078) (5), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (4), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (4), [Calasia Construction Inc](https://www.permitgraph.org/contractor/calasia-construction-inc-938255) (2), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (2), [Maguire Inc Dba Lahue And Associates](https://www.permitgraph.org/contractor/maguire-inc-dba-lahue-and-associates-928827) (2), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) (2), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (2), [West Coast Commercial Interiors](https://www.permitgraph.org/contractor/west-coast-commercial-interiors-863703) (2), [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944), [Bobcomm Llc Dba Pacific Das Llc.](https://www.permitgraph.org/contractor/bobcomm-llc-dba-pacific-das-llc-1108656), [Build By Design](https://www.permitgraph.org/contractor/build-by-design-879791), [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195), [Compass Construction](https://www.permitgraph.org/contractor/compass-construction-469366), [Edison Fire Extinguisher Company Inc](https://www.permitgraph.org/contractor/edison-fire-extinguisher-company-inc-569185), [Freeman Construction Company](https://www.permitgraph.org/contractor/freeman-construction-company-895713), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Granger Contracting Company Incorporated](https://www.permitgraph.org/contractor/granger-contracting-company-incorporated-779431), [Lakewood Const Specialtie](https://www.permitgraph.org/contractor/lakewood-const-specialtie-595312), [Marini Construction Inc](https://www.permitgraph.org/contractor/marini-construction-inc-699352), [Sachse Construction And Dev.](https://www.permitgraph.org/contractor/sachse-construction-and-dev-721717), [Sunshine Comm'l Constr. Inc.](https://www.permitgraph.org/contractor/sunshine-comm-l-constr-inc-591407)
- Architects: [Barry Bourbon](https://www.permitgraph.org/professional/barry-bourbon-C25873) (11), [Ahmad Mohazab](https://www.permitgraph.org/professional/ahmad-mohazab-C17636) (5), [Chris Stefan Engelmann](https://www.permitgraph.org/professional/chris-stefan-engelmann-C38348) (4), [Jeffery A. Rabbitt](https://www.permitgraph.org/professional/jeffery-a-rabbitt-C28914) (3), [Ahmad Mohazab](https://www.permitgraph.org/professional/ahmad-mohazab-17636) (2), [Daniel Baroni](https://www.permitgraph.org/professional/daniel-baroni-C28141) (2), [Jeffrey Schmierer](https://www.permitgraph.org/professional/jeffrey-schmierer-C29750) (2), [Christopher Preovolos](https://www.permitgraph.org/professional/christopher-preovolos-C26740), [David Romero](https://www.permitgraph.org/professional/david-romero-C28456), [Luda Hoe](https://www.permitgraph.org/professional/luda-hoe-C38081), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462), [Thoms R. Hughes](https://www.permitgraph.org/professional/thoms-r-hughes-C36476)
- Engineers: [David Rossi](https://www.permitgraph.org/professional/david-rossi-4127) (5), [Jose Cortez](https://www.permitgraph.org/professional/jose-cortez-E16488) (4), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097) (4), [Abby Banerjee](https://www.permitgraph.org/professional/abby-banerjee-M29253) (3), [Rey T. Solidum](https://www.permitgraph.org/professional/rey-t-solidum-M30309) (3), [Blake Dilsworth](https://www.permitgraph.org/professional/blake-dilsworth-S3929) (2), [James Tavernelli](https://www.permitgraph.org/professional/james-tavernelli-E21678) (2), [Lori Lee](https://www.permitgraph.org/professional/lori-lee-M26114) (2), [Ronald & Wharton](https://www.permitgraph.org/professional/ronald-wharton-C32320) (2), [Barry Bourbon](https://www.permitgraph.org/professional/barry-bourbon-C25873), [Barry Bourbov](https://www.permitgraph.org/professional/barry-bourbov-25873), [Blake Dilsworth](https://www.permitgraph.org/professional/blake-dilsworth-3829), [Carl Milsum](https://www.permitgraph.org/professional/carl-milsum-S6190), [Christian Bowers](https://www.permitgraph.org/professional/christian-bowers-M33008), [David Rossi](https://www.permitgraph.org/professional/david-rossi-S4127), [Edsel Glen Palma](https://www.permitgraph.org/professional/edsel-glen-palma-C76373), [Guil Orihuela](https://www.permitgraph.org/professional/guil-orihuela-M31230), [Matthew Debevec](https://www.permitgraph.org/professional/matthew-debevec-M35990), [Robert Nixdorf](https://www.permitgraph.org/professional/robert-nixdorf-E16495), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462)
- Authorized agents: [Chris Thomas](https://www.permitgraph.org/professional/chris-thomas-C12728), [David Plant](https://www.permitgraph.org/professional/david-plant-995375)
- Designers: [Daniel James Newell](https://www.permitgraph.org/professional/daniel-james-newell-1108656), [Gensler Barryl Barbon](https://www.permitgraph.org/professional/gensler-barryl-barbon-25843), [Pioneer Fire Inc.](https://www.permitgraph.org/professional/pioneer-fire-inc-927862)

---