# 88 Kearny St

Block 0311, lot 008. Page: https://www.permitgraph.org/a/0311/008

- City's use: Commercial Office
- Built: 1986
- Stories: 21
- Building: 260,624 sq ft
- Lot: 5,680 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609228462](https://www.permitgraph.org/p/202609228462) | Sep 22, 2026 | In progress: issued Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | addition to (e) 2way communication system provide and install new call station at 12th floor elevator lobbies per cbc section 1010.2.12.1.5. | $6,000 |
| [202606112977](https://www.permitgraph.org/p/202606112977) | Jun 11, 2026 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | install (1) illuminate single face wall sign "happen bank" appric | $14,000 |
| [202604209744](https://www.permitgraph.org/p/202604209744) | Apr 20, 2026 | In progress: issued Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064) | fire only floor (3,3,6,7,11,17,18,19, &20) (36) exit signs |  |
| [202604079014](https://www.permitgraph.org/p/202604079014) | Apr 7, 2026 | In progress: issued Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 6th floor: reference#202601093516, as built scope of work consists of adding (3) high power control relay(crh) and (3) duct smoke detector ( sign-ddos) for heat pump as needed to match field conditio… |  |
| [202603318565](https://www.permitgraph.org/p/202603318565) | Mar 31, 2026 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 19/f: addition to existing two-way communication system. provide and install new call station at 19/f elevator lobbies per cbc section 1010.2.12.1.5. pathway survivability shall be level-3 for the tw… | $9,000 |
| [202603268305](https://www.permitgraph.org/p/202603268305) | Mar 26, 2026 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | as built of bpa: 202511260480 - adjusting automatic fire sprinklers system to provide coverage per area of construction modification , all hangers and sway bracing are existing, hangers added to new… |  |
| [202603238090](https://www.permitgraph.org/p/202603238090) | Mar 23, 2026 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered. | $15,000 |
| [202603117332](https://www.permitgraph.org/p/202603117332) | Mar 11, 2026 | In progress: issued Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 20th fl - as built relocate 4 pendents ref pa 202512151772 ti pa 202511109312 | $1,000 |
| [202603117333](https://www.permitgraph.org/p/202603117333) | Mar 11, 2026 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 17th fl - as built relocate 7 pendents and convert 1 pendent to upright ref pa 202511149599 ti pa 202510217772 | $1,000 |
| [202602176029](https://www.permitgraph.org/p/202602176029) | Feb 17, 2026 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 11th fl - mep for pa 202511109302 | $350,000 |
| [202602176007](https://www.permitgraph.org/p/202602176007) | Feb 17, 2026 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 6/f: meps for t.i. 202511250447. | $120,000 |
| [202602045210](https://www.permitgraph.org/p/202602045210) | Feb 4, 2026 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 20th fl - meps for pa 202511109312 | $307,000 |
| [202601163993](https://www.permitgraph.org/p/202601163993) | Jan 16, 2026 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 6th fl ref pa # 2025-1125-0447: relocate 2 pendents, 23 pendents, 13 uprights. convert 17 uprights to pendents, 1 upright to pendent. add 1 upright. | $14,250 |
| [202601093516](https://www.permitgraph.org/p/202601093516) | Jan 9, 2026 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 6th fl - modification to (e) building emergency voice alarm system to accomodate ti ref pa 202511250447 | $9,000 |
| [202601093513](https://www.permitgraph.org/p/202601093513) | Jan 9, 2026 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 11th fl - modification to (e) building emergency voice alarm system to accomodate ti ref pa 202511109302 | $9,000 |
| [202512313044](https://www.permitgraph.org/p/202512313044) | Dec 31, 2025 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 7th fl ref pa #2025-1125-0451: modification to existing building emergency voice alarm communication system + 2-way comm at 7th floor. | $9,000 |
| [202512313046](https://www.permitgraph.org/p/202512313046) | Dec 31, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 20th flr. modification to existing building emergency voice alarm communication system on the 20th floor. ref#: 202511109312 | $9,000 |
| [202512313043](https://www.permitgraph.org/p/202512313043) | Dec 31, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 18 flr. modification to existing building emergency voice alarm communication system on the 18th floor. ref#: 202511048826 | $9,000 |
| [202512182097](https://www.permitgraph.org/p/202512182097) | Dec 18, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 17th fl - modificaiton to existing emrgency voice alarm communication system to accomodate ti ref pa 202510217772 | $9,000 |
| [202512171956](https://www.permitgraph.org/p/202512171956) | Dec 17, 2025 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate 3 pendents 9 uprights, 32 pendents convert 5 uprights to pendents, 8 upright to pendents add 12 pendents on the 7/f | $17,250 |
| [202512151772](https://www.permitgraph.org/p/202512151772) | Dec 15, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate (43) pendents, (6) uprights, convert (14) pendents to uprights, (12) pendents to uprights. | $18,750 |
| [202512111528](https://www.permitgraph.org/p/202512111528) | Dec 11, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | deferred mep for 17th floor ti under permit 202510217772. | $75,000 |
| [202512111499](https://www.permitgraph.org/p/202512111499) | Dec 11, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | modification of existing bldg fire emergency voice/alarm communication system to accomodate tenant improvement on the 3/f. ref #202510147260 | $9,000 |
| [202512111500](https://www.permitgraph.org/p/202512111500) | Dec 11, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 4th floor: modification of existing bldg fire emergency voice/alarm communication system to accomodate tenant improvement on the 4/f. ref #202510288260 | $9,000 |
| [202512111531](https://www.permitgraph.org/p/202512111531) | Dec 11, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 3rd/f mep for t.i. 202510147260: mep for project | $145,000 |
| [202511260480](https://www.permitgraph.org/p/202511260480) | Nov 26, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate (3) uprights, (7) pendents, (11) uprights. convert (54) uprights to pendents. add (1) upright. ref pa # 2025-1104-8826 | $19,000 |
| [202511250451](https://www.permitgraph.org/p/202511250451) | Nov 25, 2025 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 7th fl - t.i. includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. r… | $1,251,419 |
| [202511250447](https://www.permitgraph.org/p/202511250447) | Nov 25, 2025 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 6th fl - ti includes the building of new non-structural partitions. all new or revised meps, life safety work will be design build and submitted separately for permits. bldg is fully sprinklered. ref… | $1,243,215 |
| [202511200117](https://www.permitgraph.org/p/202511200117) | Nov 20, 2025 | Completed: final sign-off Apr 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 11th fl ref pa # 2025-110-9302: relocate 2 pendants, 12 uprights, 25 pendants. convert 24 uprights to pendants | $15,750 |
| [202511109302](https://www.permitgraph.org/p/202511109302) | Nov 10, 2025 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 11/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508… | $573,000 |
| [202511109312](https://www.permitgraph.org/p/202511109312) | Nov 10, 2025 | Completed: final sign-off Sep 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 20/f. ti includes the building of new non-structural partitions. all new or revised meps and life safety work will be design build and submitted separately. bldg is fully sprinlerd. ref demo # 202508… | $777,000 |
| [202511048826](https://www.permitgraph.org/p/202511048826) | Nov 4, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 18th floor: t.i. includes building of new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted for permit seperately. building is fully sprinklere… | $734,582 |
| [202510217772](https://www.permitgraph.org/p/202510217772) | Oct 21, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 17th fl - ti includes building of new non-structural partitions. all new mep & life safety work will be design build and submitted for permit separately. bldg is fully sprinklered | $959,611 |
| [202510147260](https://www.permitgraph.org/p/202510147260) | Oct 14, 2025 | Completed: final sign-off Aug 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 3rd fl. demo under 202508213610. t.i. includes the bldging of new non-structural partitions. all new or revised meps life safety/sprinklers will be design bldg and submitted. separately. (bldg is ful… | $832,402 |
| [202509195756](https://www.permitgraph.org/p/202509195756) | Sep 26, 2025 | Completed: final sign-off Oct 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | demolition project on floors existing notification devices denoted with (d) will be removed for 3,6,7,17,18,20 this is a market ready project for future tenant improvement projects on these floors. t… | $61,677 |
| [202509115076](https://www.permitgraph.org/p/202509115076) | Sep 11, 2025 | Completed: final sign-off Oct 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 14th fl suite 1450: 4 new speaker appliances will be connected into the (e) speaker appliance. ref pa # 2025-0722-1279 | $12,348 |
| [202508273960](https://www.permitgraph.org/p/202508273960) | Aug 27, 2025 | Completed: final sign-off Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 20/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202… | $59,000 |
| [202508273958](https://www.permitgraph.org/p/202508273958) | Aug 27, 2025 | Completed: final sign-off Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 18/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202… | $59,000 |
| [202508273962](https://www.permitgraph.org/p/202508273962) | Aug 27, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 04/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202… | $77,406 |
| [202508273963](https://www.permitgraph.org/p/202508273963) | Aug 27, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 11/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202… | $58,000 |
| [202508273961](https://www.permitgraph.org/p/202508273961) | Aug 27, 2025 | Completed: final sign-off Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 17/fl- demo of non structrual partitions, suspended ceilings, lighting, plumbing, finishes, etc. (e) sprinkler heads will be turned up once the suspended accoustical ceiling has been removed. ref 202… | $59,000 |
| [202508263899](https://www.permitgraph.org/p/202508263899) | Aug 26, 2025 | Completed: final sign-off Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 7th fl - demo of non structural partitions, suspended ceilings; lighting, 0lumbing, finishes etc; (e) sprinkler heads will be turned uponce suspended ceiling ciling has been removed; ref sprinkler dr… | $60,000 |
| [202508263905](https://www.permitgraph.org/p/202508263905) | Aug 26, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 6th fl - demo of non structural partitions, suspended ceilings; lighting, plumbing, finishes etc; (e) sprinkler heads will be turned up once suspended accoustical ceiling has been removed; ref sprink… | $60,000 |
| [202508263882](https://www.permitgraph.org/p/202508263882) | Aug 26, 2025 | Completed: final sign-off Nov 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 5th/f: ref t.i. 202505055774: this is a project addition to e) edwards fire alarm system to accomodate t.i. on 5th/f and 1 2-way comm call station at the elevator lobby | $25,000 |
| [202508213610](https://www.permitgraph.org/p/202508213610) | Aug 21, 2025 | Completed: final sign-off Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 3rd/f: demo of non-structural partition, suspended ceiling, lighting, plumbing, finishes etc. e) sprinkler heads will be turned up once suspended ceiling has been removed. ref sprinkler dwg pa# 20250… | $77,413 |
| [202508143070](https://www.permitgraph.org/p/202508143070) | Aug 14, 2025 | Expired or cancelled: cancelled Dec 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Shield Fire Protection, Inc.](https://www.permitgraph.org/contractor/shield-fire-protection-inc-1067016) | demolition phase- design. up turn fire sprinkler heads for shell & core. floors: 3,4,6,7,11,17,18 & 20 | $3,000 |
| [202508062401](https://www.permitgraph.org/p/202508062401) | Aug 6, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deferred structural plans for operable partition at training 521 a and training 521 b ref 202505055774 | $2,000 |
| [202507301939](https://www.permitgraph.org/p/202507301939) | Jul 30, 2025 | Completed: final sign-off Nov 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | deferred mep for office ti permit 202507221279. rework (1) e - hvac box to accommodate 4 new offices, rework (1) e -vac cooling box for partial enclosed pantry area , install new 4 air diffusers and… | $30,000 |
| [202507291812](https://www.permitgraph.org/p/202507291812) | Jul 29, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th fl - mechanical & electrical work for ti ref pa 202505055774 | $24,000 |
| [202507281708](https://www.permitgraph.org/p/202507281708) | Jul 28, 2025 | Completed: final sign-off Aug 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Shield Fire Protection, Inc.](https://www.permitgraph.org/contractor/shield-fire-protection-inc-1067016) | fl 14: relocate sprinklers for new partitions and ceiling finishes. ref pa #202507221279. | $1,000 |
| [202507221279](https://www.permitgraph.org/p/202507221279) | Jul 22, 2025 | Completed: final sign-off Nov 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 14th flr/suite 1450: t.i. includes demo of non strutural partiions + building new non-str partitions. all new or revisions mep and life safety work + sprinkler will be design -build and submitted for… | $101,388 |
| [202507160872](https://www.permitgraph.org/p/202507160872) | Jul 16, 2025 | Completed: final sign-off Sep 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 5th fl ref pa # 2025-0505-5774: relocate 2 pendents, 2 uprights, convert 10 uprights to pendents, add 2 uprights, 2 horizontal sidewall sprinklers, remove 2 horizontal sidewall sprinklers. | $5,000 |
| [202505055774](https://www.permitgraph.org/p/202505055774) | May 5, 2025 | Completed: final sign-off Mar 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th fl: partial tenant improvement partial demolition, new non bearting partitions, ceilings, millwork, mechancial, electrical & plumbing scope. structural scope for phone booth anchoring. (e) restro… | $800,000 |
| [202407186843](https://www.permitgraph.org/p/202407186843) | Jul 29, 2024 | Completed: final sign-off Sep 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | voluntary replacement of (e) and currently functioning fire alarm control unit (facu) at the request of owner. | $225,954 |
| [202309055923](https://www.permitgraph.org/p/202309055923) | Sep 5, 2023 | Completed: final sign-off Oct 2023 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | revision to application #202210245023: d.a. checklist update. |  |
| [202308245109](https://www.permitgraph.org/p/202308245109) | Aug 24, 2023 | Never finaled: issued Aug 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm modification on 10th and 11th fl 202304256392 | $60,760 |
| [202306230727](https://www.permitgraph.org/p/202306230727) | Jun 23, 2023 | Never finaled: issued Jul 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | fire only - 10th fl evacuation map permit. | $1,900 |
| [202305188022](https://www.permitgraph.org/p/202305188022) | May 18, 2023 | Never finaled: issued May 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | 19/f: add hw return line for reheat vav terminal units, add sound boot and transfer grilles | $45,000 |
| [202304256392](https://www.permitgraph.org/p/202304256392) | Apr 25, 2023 | Never finaled: issued Apr 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 10th & 11th fl - fire alarm modification; add 22 spkr/strobes, 11 strobes, 14 duct detectors, 14 rib relays, 7 control relays, 1 smoke detector; replace 1 strobe power supply, 2 speaker/strobes; relo… | $60,000 |
| [202302131846](https://www.permitgraph.org/p/202302131846) | Feb 13, 2023 | Never finaled: issued Mar 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 19/f: existing fire sprinkler system t.i. relocate 6 pendents. ref permit 202210245023 | $3,600 |
| [202212148278](https://www.permitgraph.org/p/202212148278) | Dec 14, 2022 | Never finaled: issued Feb 2023, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 19/f: t.i. limited to the demotion of an (e) hold open doorway at lobby. replace in-kind with a fire rated glass door. no change of square feet or building height. interior only | $10,759 |
| [202210245023](https://www.permitgraph.org/p/202210245023) | Oct 24, 2022 | Completed: final sign-off Oct 2023 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) | 19th fl: tenant improvement of an existin building. limited to the installation and anchoring of (6) new prefabricated pramery phone booths. | $15,000 |
| [202209233023](https://www.permitgraph.org/p/202209233023) | Sep 23, 2022 | Never finaled: issued Sep 2022, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Young Electric Co](https://www.permitgraph.org/contractor/young-electric-co-390749) | deferred electrical drawings for permit 202207057755 |  |
| [202209222934](https://www.permitgraph.org/p/202209222934) | Sep 22, 2022 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 7/f: demo/construction of toilet partitions, new plumbing & finishes | $10,000 |
| [202209122223](https://www.permitgraph.org/p/202209122223) | Sep 12, 2022 | Completed: final sign-off Sep 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 7/f: as built for pba#202208090122. no new added devices. remove (5) strobes inside restroom cubiclesl, cubicles are not full height walls/doors, strobe are not required. |  |
| [202208100248](https://www.permitgraph.org/p/202208100248) | Aug 10, 2022 | Completed: final sign-off Jan 2024 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite. | $246,924 |
| [202208090122](https://www.permitgraph.org/p/202208090122) | Aug 9, 2022 | Completed: final sign-off Oct 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm modification on 7th fl restrooms, remove 2 sprinklers, 2 strobes, add 2 sprinkler strobes, 5 strobes | $4,400 |
| [202208059986](https://www.permitgraph.org/p/202208059986) | Aug 5, 2022 | Completed: final sign-off Aug 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler relcoate 5 pendent sprinklers on the 7/f restrooms. t.i ref pa# 202207057755 | $2,625 |
| [202207057755](https://www.permitgraph.org/p/202207057755) | Jul 5, 2022 | Completed: final sign-off Oct 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 7th flr t.i.- demolition and construction of toilet partitions, new plumbing and new finishes. | $70,000 |
| [202206035555](https://www.permitgraph.org/p/202206035555) | Jun 3, 2022 | Completed: final sign-off Aug 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | f/a modification on 5th floor. install four speaker/strobes. ref pa# 202204262974 | $2,500 |
| [202205053617](https://www.permitgraph.org/p/202205053617) | May 5, 2022 | Never finaled: filed May 2022, never issued | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | as built foro bpa#202010166677. no new devices added, added adendum f & elev cars matrix, revised sequence of ope matrix to reflect elev sequece per bank, demo (6) monitor modules, 4 retain (1) smoke… |  |
| [202204262974](https://www.permitgraph.org/p/202204262974) | Apr 26, 2022 | Completed: final sign-off Jul 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5th fl: minor architectural tenant improvement for single tenant. work includes adding & anchoring 4 furniture phone booths to the floor. | $30,000 |
| [202203220517](https://www.permitgraph.org/p/202203220517) | Mar 22, 2022 | Completed: final sign-off May 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | infill of (e) rated openings into an abandoned communicating stair enclosure & associated demolition & partition construction. demo of an (e) fire-rated double door on 4th fl & demo of (e) fire rated… | $5,000 |
| [202107124158](https://www.permitgraph.org/p/202107124158) | Jul 12, 2021 | Completed: final sign-off Nov 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fa addition on basement floor, install (2) control relays, (2) duct detectors and (3) rib relays | $5,300 |
| [202104269343](https://www.permitgraph.org/p/202104269343) | Apr 26, 2021 | Completed: final sign-off Jun 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Johnson Controls Security Solutions Llc](https://www.permitgraph.org/contractor/johnson-controls-security-solutions-llc-977249) | voluntary modify existing fire alarm system replace existing panel with new dialer panel. 1st floor bank. | $1,500 |
| [202104017726](https://www.permitgraph.org/p/202104017726) | Apr 1, 2021 | Never finaled: issued Jul 2021, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ca United Mechanical, Inc](https://www.permitgraph.org/contractor/ca-united-mechanical-inc-828335) | furnish and install a new ac split system to serve the elevator machine room. | $15,000 |
| [202012070376](https://www.permitgraph.org/p/202012070376) | Dec 7, 2020 | Completed: final sign-off Feb 2022 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | removal and installation of new entry doors | $110,000 |
| [202011259746](https://www.permitgraph.org/p/202011259746) | Nov 25, 2020 | Never finaled: issued Dec 2020, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 8 evacuation plan maps floors 10, 11 for fire review only. | $3,200 |
| [202011128759](https://www.permitgraph.org/p/202011128759) | Nov 12, 2020 | Never finaled: issued Dec 2020, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 11th floor f/a modification: remove (11) area smoke detectors; (14) wall strobes & (11) ceiling speakers; add (22) speaker/strobes; (5) speakers; (1) duct detector; (1) rib relay; (1) control relay;… | $19,180 |
| [202010166677](https://www.permitgraph.org/p/202010166677) | Oct 16, 2020 | Never finaled: issued Nov 2020, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | elevator modification, fire alaem modification, on basement, 13th & 22nd floors. install (9) control relays; (3) smole detectors; (3) speaker/strobes. | $6,900 |
| [202008242506](https://www.permitgraph.org/p/202008242506) | Aug 24, 2020 | Completed: final sign-off Oct 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | ref pa#202003096475. f/a modification on 10/f. remove (10) smoke detectors in the open space; (13) strobes & (13) speakers. install (6) speaker/strobes and relocate (6) smoke detectors. 11th floor to… | $6,240 |
| [202007210618](https://www.permitgraph.org/p/202007210618) | Jul 21, 2020 | Completed: final sign-off Jan 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 11/f: new construction of offices and break area. total renovation of women and men's restrooms. finishes and millwork. | $1,220,000 |
| [202003126942](https://www.permitgraph.org/p/202003126942) | Mar 12, 2020 | Completed: final sign-off Oct 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 11th floor: add 9, relocate 23, plug 4, and change out 51 sprinklers in order to conform with the new wall/ceiling layout of the ti. reference pa #2020-0309-6475 | $9,900 |
| [202003126941](https://www.permitgraph.org/p/202003126941) | Mar 12, 2020 | Completed: final sign-off Oct 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 10th floor: add 9, relocate 22, plug 4, and change out 50 sprinklers in order to conform with the new wall/ceiling layout of the ti. reference pa #2020-0309-6475 | $9,875 |
| [202003096475](https://www.permitgraph.org/p/202003096475) | Mar 9, 2020 | Completed: final sign-off Oct 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 10th & 11th fl - demo only of 10th & 11th fl, partitions, ceilings, fixtures, and finishes per ab-017. | $50,000 |
| [202002215051](https://www.permitgraph.org/p/202002215051) | Feb 21, 2020 | Completed: final sign-off Aug 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 16th fl - f/a modification - demo 3 smk det, 3 strobes; 2 spkrs, 6(2) door holders, install 7 spkrs; 3 spkr/strobes; 1 strobes; 2 door holders, replace 2 speakers w/spkr/strb; 1 spkr/strobe w/spkr on… | $12,000 |
| [202002124309](https://www.permitgraph.org/p/202002124309) | Feb 12, 2020 | Completed: final sign-off Aug 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 15th floor: ref# 2019-1213-9488: relocatre fire sprinkler per t.i. (1 relocate) | $225 |
| [202002103948](https://www.permitgraph.org/p/202002103948) | Feb 10, 2020 | Completed: final sign-off Jul 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm modification on 15th floor: demo 1 speaker. installation 1 smoke detector inside t.i. elec room. 1 replace wall strobes with a speaker strobe. 2 replace wall strobes with new. | $2,400 |
| [201912240448](https://www.permitgraph.org/p/201912240448) | Dec 24, 2019 | Completed: final sign-off Nov 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 16th floor it: t24 lighting upgrade, new restroom finishes, new bar counter. mep included. work on 16th floor only | $1,800,000 |
| [201912189961](https://www.permitgraph.org/p/201912189961) | Dec 18, 2019 | Never finaled: issued Dec 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | 16th floor: t.i. to relocate of 7 fire sprinklers in area of work only. all main piping to remain. addition of 2 fire sprinklers in area of work. | $4,500 |
| [201912139488](https://www.permitgraph.org/p/201912139488) | Dec 13, 2019 | Completed: final sign-off Oct 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | tenant improvements soffit ceilings, casework, finishes, lighting, plumbing fixtures. fire alarm fire sprinkler sep permit. includes mep | $110,000 |
| [201912109106](https://www.permitgraph.org/p/201912109106) | Dec 10, 2019 | Completed: final sign-off Apr 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 14th fl - as built for pa 2019-0920-2210. no new devices added. changes include replace 1 wall strobe & 1 speaker with speaker/strobes. change new devices to existing devices |  |
| [201911258091](https://www.permitgraph.org/p/201911258091) | Nov 25, 2019 | Completed: final sign-off May 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | suite 300: demo existing duct & hvac equipment as shown on 3m2.1, install new duct & hvac equipment as shown on 3m2.1, new lighting & controls for new phone rooms & new power & data for select furnit… | $47,000 |
| [201911258082](https://www.permitgraph.org/p/201911258082) | Nov 25, 2019 | Completed: final sign-off Feb 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 21st fl - as built permit for approved fire alarm pa 2019-0828-0056 no additional parts. scope is to remove devices not in the field |  |
| [201911258083](https://www.permitgraph.org/p/201911258083) | Nov 25, 2019 | Never finaled: issued Nov 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 3rd fl - fire alarm modification - remove 1 speaker/strobe and install 4 speakers. ref pa 2019-0614-3455 | $3,250 |
| [201911086827](https://www.permitgraph.org/p/201911086827) | Nov 8, 2019 | Completed: final sign-off May 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 4th & 5th fl - as builts for f/a ref pa 2019-0920-2209. 1 new device added. scope is to update location of sprk/strobes |  |
| [201911086789](https://www.permitgraph.org/p/201911086789) | Nov 8, 2019 | Completed: final sign-off Mar 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system ti 2 added & 4 relocated sprinklers. ref pa 2019-0614-3455 | $3,000 |
| [201910184902](https://www.permitgraph.org/p/201910184902) | Oct 18, 2019 | Completed: final sign-off Dec 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | lobby/1st floor: f/a modification. demo 3 strobes, 2 smoke detectors 1 control relay. replace 1 pull station, & 1 phone jack. install 5 speakers/strobes and 3 smoke detectors. n/a for maher. | $5,500 |
| [201910154384](https://www.permitgraph.org/p/201910154384) | Oct 15, 2019 | Completed: final sign-off Dec 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 14th flr, fire sprinklers. relocate 11 pendents & 2 concealed pendents on 14th flr corridor & lobby area | $6,500 |
| [201910083841](https://www.permitgraph.org/p/201910083841) | Oct 8, 2019 | Completed: final sign-off Dec 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 13th floor: modification: demo 4 wall strobes; 1 speaker, 9 smoke detectors in the open space. install 11 speaker/strobes; 2 wall strobes, replace 1 speaker/strobes; 4 wall strokes with new. | $11,160 |
| [201910023328](https://www.permitgraph.org/p/201910023328) | Oct 2, 2019 | Completed: final sign-off Mar 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 1st fl - t24 mechanical to demo/construct duct and hvac equipment and rebalance hvac system in lobby. ref pa 2019-0503-9733 for ti work | $27,000 |
| [201909202209](https://www.permitgraph.org/p/201909202209) | Sep 20, 2019 | Completed: final sign-off May 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 4th & 5th flrs f/a modificaiton - replace 1 strobe & 2 strobe power supply; install 48 speaker/srobes; 3 smoke detectors; 4 control relays; 4 pilot . | $35,000 |
| [201909202210](https://www.permitgraph.org/p/201909202210) | Sep 20, 2019 | Never finaled: issued Sep 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 14th fl - fa modification ref pa 2019-0510-0319. demo 2 speakers & 3 strobes; remove & replace w/ new 4 smoke dete; install 6 speakers; 1 strobe; 4 duct detectors; 1 control relay; 4 rib relays 2 doo… | $35,000 |
| [201909171791](https://www.permitgraph.org/p/201909171791) | Sep 17, 2019 | Completed: final sign-off Dec 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | add and relocate dissusers and registers, add and relcoate ductwork and air balance. ne new fire smk dampers are being added, lighting, power and signal, wiring and controls for office retrofit. repl… | $65,000 |
| [201909111279](https://www.permitgraph.org/p/201909111279) | Sep 11, 2019 | Never finaled: issued Sep 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 21/f: existing fire sprinkler system -t.i. added 2 & relocated 8 sprinklers, 1 removed sprinkler | $3,000 |
| [201909101260](https://www.permitgraph.org/p/201909101260) | Sep 10, 2019 | Completed: final sign-off Jun 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 14/f:t-24 mechanical and electrical for work under pa# 201904258913 |  |
| [201909060866](https://www.permitgraph.org/p/201909060866) | Sep 6, 2019 | Never finaled: issued Sep 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fa modification - demo 1 smk det, 5 spkrs, 7 strobes. install 4 spkrs/strobes, 4 spkrs, 2 speaker replace w/spkr/strobes. ref 201906173590 | $6,400 |
| [201908300315](https://www.permitgraph.org/p/201908300315) | Aug 30, 2019 | Completed: final sign-off Oct 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 4/f & 5/f: fire sprinkler only for knotel. 4/f: relocate 14 pendents & 8 uprights. 5/f: relocate 10 pendents; add 1, relocate 3 uprights add 3 uprights. ref t.i. pa201907317417 | $19,500 |
| [201908300319](https://www.permitgraph.org/p/201908300319) | Aug 30, 2019 | Completed: final sign-off Oct 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 12/f-suite 1200: fire sprinkler only for knotel. relocate 9 pendents. ref t.i. pa201906173590. maher n/a. | $4,500 |
| [201908057821](https://www.permitgraph.org/p/201908057821) | Aug 5, 2019 | Completed: final sign-off Dec 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 21st fl. t.i. (n) non-load bearing partition, finishes, lighting, etc. meps included, (sprinklers and fire life safety under separate permits) | $1,165,425 |
| [201907317417](https://www.permitgraph.org/p/201907317417) | Jul 31, 2019 | Never finaled: issued Aug 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th and 5th flrs. construct non-structural walls, (n) millwork, restroom, elevator lobby updates, replacing light fixtures, (n) mech electrical plumb. no structural work. no increase in area, no chan… | $3,500,000 |
| [201907236589](https://www.permitgraph.org/p/201907236589) | Jul 23, 2019 | Completed: final sign-off Aug 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 14th floor- ref pa# 201904026918: fa modification 14th floor suite 1400. demo 2 speaker and 3 strobes. install 5 speaker/strobs. | $3,200 |
| [201907105494](https://www.permitgraph.org/p/201907105494) | Jul 10, 2019 | Completed: final sign-off Jul 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 14th flr, suite 1400. relocate 20 fire sprinkler pendent heads | $10,000 |
| [201906173590](https://www.permitgraph.org/p/201906173590) | Jun 17, 2019 | Completed: final sign-off Dec 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | 12th floor: modification of (e) tenant improvement to include select demolition of non load bearing walls, new light fixtures, new millwork, new finishes | $295,000 |
| [201906143455](https://www.permitgraph.org/p/201906143455) | Jun 14, 2019 | Completed: final sign-off May 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | ste 300 - modification of all existing ti - includes selective construction of non-load bearing walls, modified ceiling grid, light fixture, relocation, new office doors & frames and new finishes | $72,000 |
| [201905130396](https://www.permitgraph.org/p/201905130396) | May 13, 2019 | Never finaled: issued May 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 14th fl - fa modifications - demo 7 speakers; 6 strobes; 3 smoke detectors; 2 door holder; install 9 speaker/strobes and 3 speakers; relcoate 1 smoke detector and 2 strobes. ref pa 201904026918 | $11,520 |
| [201905130383](https://www.permitgraph.org/p/201905130383) | May 13, 2019 | Completed: final sign-off Nov 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 14th fl - t-24 mechanical for work under pa 2019-0402-6918 | $43,000 |
| [201905100319](https://www.permitgraph.org/p/201905100319) | May 10, 2019 | Completed: final sign-off Jun 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 14th fl - modification of existing multi-tenant hallway and elevator lobby. includes new ceiling gride, tile and lighting; new doors frames and hardware; and new finishes | $56,000 |
| [201905039733](https://www.permitgraph.org/p/201905039733) | May 3, 2019 | Completed: final sign-off Mar 2021 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | interior lobby renovaton to include upgraded lighting, new security desk, wall finishes & electronic/digital art wall | $1,500,000 |
| [201905029509](https://www.permitgraph.org/p/201905029509) | May 2, 2019 | Completed: final sign-off Jul 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | ref pa 2019-0227-3928 fire alarm modification on 4th & 5th floors. demo speakers, strobes, door holders & smoke detectors in the tenant space. space will remain unoccupied after demo. common area & e… | $2,500 |
| [201904299169](https://www.permitgraph.org/p/201904299169) | Apr 29, 2019 | Completed: final sign-off May 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 24 upright sprinkler heads & 17 pendent heads on the 14th fl, ste 1450 ref pa 2019-0402-6918 | $20,500 |
| [201904258913](https://www.permitgraph.org/p/201904258913) | Apr 25, 2019 | Completed: final sign-off Jun 2020 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | modification of all (e) t.i. to include selective demolition and construction of non-load bearing partitions, new ceiling tile and light fixtures, new doors and hardware, new millwork and new finishe… | $190,000 |
| [201904228557](https://www.permitgraph.org/p/201904228557) | Apr 22, 2019 | Completed: final sign-off Jul 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 5th flr f/a modification- demo 3 pre-action monitor modules that is not being used. pre-action panel is no longer installed | $500 |
| [201904026918](https://www.permitgraph.org/p/201904026918) | Apr 2, 2019 | Completed: final sign-off Nov 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | suite # 1450 t.i: including selective demolition and construction of non load bearing partitions, new doors/frames, new ceiling grid tiles, and lighting and new finishes. | $185,000 |
| [201902273930](https://www.permitgraph.org/p/201902273930) | Feb 27, 2019 | Never finaled: issued Apr 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 4th fl; full floor demolition | $400,000 |
| [201902273928](https://www.permitgraph.org/p/201902273928) | Feb 27, 2019 | Never finaled: issued Apr 2019, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 5th fl; full floor demolition | $400,000 |
| [201902112573](https://www.permitgraph.org/p/201902112573) | Feb 11, 2019 | Completed: final sign-off May 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only- demo plan for 88 keary 4th & 5th fl. remove ceiling & walls, upright protection (84) heads each | $84,000 |
| [201812077785](https://www.permitgraph.org/p/201812077785) | Dec 7, 2018 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | 21st fl - interior demo including non-structural walls & plumbing. space to remain vacant until all accesible feature have been restored, per ab-017 | $22,000 |
| [201811296938](https://www.permitgraph.org/p/201811296938) | Nov 29, 2018 | Completed: final sign-off Dec 2018 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm modification on 19th fl, demo 10 speaker, 13 strobes, 1 control relay, 1 duct detector, 1 smk det. install 19 speaker/strobes, 2 speaker to replace with speaker strobe | $13,020 |
| [201810254150](https://www.permitgraph.org/p/201810254150) | Oct 25, 2018 | Completed: final sign-off Dec 2018 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 19th fl: add 10, relocate 15 sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa #201808298641. job #18-736. | $8,625 |
| [201810233877](https://www.permitgraph.org/p/201810233877) | Oct 23, 2018 | Completed: final sign-off Mar 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 19th flr - mech & ele to support approved arch. no fsds ref 201809170436 maher na | $65,000 |
| [201809211080](https://www.permitgraph.org/p/201809211080) | Sep 21, 2018 | Completed: final sign-off Oct 2018 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | 16th floor: t.i. to relocate of 4 fire sprinklers, remove 1 and add 1 sprinkler. ref app#201808227989. n/a for maher. | $1,000 |
| [201809170436](https://www.permitgraph.org/p/201809170436) | Sep 17, 2018 | Completed: final sign-off Mar 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 19th flr - ti build back. includes new partions maher na | $1,300,000 |
| [201808318869](https://www.permitgraph.org/p/201808318869) | Aug 31, 2018 | Completed: final sign-off Mar 2019 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 19th flr - fl0or demolition of partitions, fixtures and finishes under ab-017 sprinkler ref pa 201808298641. n/a for maher. | $70,000 |
| [201808298641](https://www.permitgraph.org/p/201808298641) | Aug 29, 2018 | Completed: final sign-off May 2025 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | change out fire sprinklers per tenent improvements. (77 change outs) - 19th floor. | $17,325 |
| [201808227989](https://www.permitgraph.org/p/201808227989) | Aug 22, 2018 | Never finaled: issued Aug 2018, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | 16th fl. t.i. open work place, re-configuring tenant waiting area & tenant break areas, the only work affecting the path of egress travel is removal of existing doors & non rated partitions within th… | $531,641 |
| [201708286113](https://www.permitgraph.org/p/201708286113) | Aug 28, 2017 | Completed: final sign-off Dec 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 18/f- modification to (e) tenant suite including selective demolition & construction of non-load bearing walls, reuse (e) selected materials as required. n/a ordinance #155-13 | $50,944 |
| [201708215394](https://www.permitgraph.org/p/201708215394) | Aug 21, 2017 | Completed: final sign-off Sep 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 2nd fl: relocate 28 pendents, 3 relocated uprights and remove 4 uprights. ref #2017-0621-9993. maher na | $19,227 |
| [201708185203](https://www.permitgraph.org/p/201708185203) | Aug 18, 2017 | Completed: final sign-off Sep 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 7/f: fire alarm modification. install 4 spearkers, 2 strobes, relocate 2 strobes, remove 2 smoke detectors. ref t.i. pa#201707192315. | $3,100 |
| [201708175077](https://www.permitgraph.org/p/201708175077) | Aug 17, 2017 | Completed: final sign-off Mar 2018 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 2/f: rev to pa#201706219993. removal of partition from scope. |  |
| [201708154844](https://www.permitgraph.org/p/201708154844) | Aug 15, 2017 | Completed: final sign-off Dec 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t24 elec for work done under 201707192315. maher not req | $8,000 |
| [201707273047](https://www.permitgraph.org/p/201707273047) | Jul 27, 2017 | Completed: final sign-off Sep 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | ref: ti 201706219993, f.a. modification on 2nd flr, install (20) speaker/strobes (2) strobes (2) control relays, (2) smoke detectors, (3) rib relays, (3) emergency door release, relocate (5) speakers… | $17,000 |
| [201706219993](https://www.permitgraph.org/p/201706219993) | Jun 21, 2017 | Completed: final sign-off Mar 2018 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 2nd fl interior tenant improvement of warm shell space, to include new partitoins, finishes, lighting, equipment. fls system to remain intact and operate during construction. modificatin to plumbing/… | $1,247,040 |
| [201609238663](https://www.permitgraph.org/p/201609238663) | Sep 23, 2016 | Completed: final sign-off Dec 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 mechanical and electrical for work under ref 201606109698. n/a for maher. | $15,000 |
| [201609076910](https://www.permitgraph.org/p/201609076910) | Sep 7, 2016 | Never finaled: issued Sep 2016, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 18th flr: fire sprinlers - relocate 10 sprinklers pendents: add 1 pendent 11 total. plug off 5 head - for hma suite #1800 | $5,775 |
| [201609066862](https://www.permitgraph.org/p/201609066862) | Sep 6, 2016 | Never finaled: issued Sep 2016, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 18th flr, ste 1800: remove (5) smoke detectors, (3) wall strobes, (1) speaker strobe, (2) speakers, add (5)new ceiling speaker/strobes, (2)new speakers, ref. ti 201606109698; maher n/a | $3,598 |
| [201606109698](https://www.permitgraph.org/p/201606109698) | Jun 10, 2016 | Completed: final sign-off Dec 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | modification of (e) tenant space to include selective demolition & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures including re-switching, new office doors &… | $318,540 |
| [201603293314](https://www.permitgraph.org/p/201603293314) | Mar 29, 2016 | Completed: final sign-off Apr 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | 2nd floor - (4) evacuation signs, n/a maher ordinance | $1,600 |
| [201603182455](https://www.permitgraph.org/p/201603182455) | Mar 18, 2016 | Expired or cancelled: withdrawn Apr 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | revision to ref pa 2015 1020 0187 & 2016 02225 0571: removal od 2 emergency push buttons & removal of 2 card readers in elevator lobby. maher na |  |
| [201603081421](https://www.permitgraph.org/p/201603081421) | Mar 8, 2016 | Completed: final sign-off May 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | revision to pa#201510200187, reduction of number of lighting fixtures inopen work area. n/a ordinance #155-13 |  |
| [201602250571](https://www.permitgraph.org/p/201602250571) | Feb 25, 2016 | Expired or cancelled: withdrawn Apr 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | revision to pa 2015-1020-0187, addition of (2) emergency push buttons in elevator lobby. maher na |  |
| [201602250462](https://www.permitgraph.org/p/201602250462) | Feb 25, 2016 | Expired or cancelled: withdrawn Apr 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | suite 200: title 24, reference 201510200187; maher n/a |  |
| [201601278087](https://www.permitgraph.org/p/201601278087) | Jan 27, 2016 | Completed: final sign-off May 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | revision to 201510200187: remove existing drinking fountain. install approved elkay ezh20 system model lxs8ws low drinking fountain with high water filler bottle maher not req |  |
| [201601207435](https://www.permitgraph.org/p/201601207435) | Jan 20, 2016 | Completed: final sign-off Apr 2017 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | demo 111 pendant fire sprinklers; install 102 upright fire sprinklers. ref pa 2015-1020-0187. maher na | $45,000 |
| [201511041730](https://www.permitgraph.org/p/201511041730) | Nov 4, 2015 | Completed: final sign-off Mar 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | #2000- modification of existing tenant space to include demolition of non load bearing partitions, modification of existing electrical, data outlets & relamping of existing fixtures. n/a ordinance #1… | $35,800 |
| [201510260717](https://www.permitgraph.org/p/201510260717) | Oct 26, 2015 | Never finaled: issued Oct 2015, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th floor: (e) ti include selective demo of non load bearing partitions, etc. creating an opening between 2 suites. minor elect relocation of 2 thermostats. relocation of 1 exit sign and new paint | $14,038 |
| [201510200187](https://www.permitgraph.org/p/201510200187) | Oct 20, 2015 | Completed: final sign-off May 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 2nd floor suite 200 - modification of (e) tenant space to include selective demolition & construction of non-load bearing partitions, demolition of ceiling grid & tile, new light fixtures, new millwo… | $660,030 |
| [201508113969](https://www.permitgraph.org/p/201508113969) | Aug 11, 2015 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | remove non load bearing parition. salvage reusable materials. patch/repair areas affected by demolition to a useable, finished condition. maher not finished | $8,500 |
| [201508103785](https://www.permitgraph.org/p/201508103785) | Aug 10, 2015 | Completed: final sign-off Oct 2015 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 8th fl: mod of (e) ti space to include construction and selective demo of non load bearing partitions, (e) modifications to ceiling grid and tile, new light fixtures and re-switching, new office door… | $80,000 |
| [201508043257](https://www.permitgraph.org/p/201508043257) | Aug 4, 2015 | Expired or cancelled: withdrawn Dec 2016 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | 20th floor: ada compliant upgrades to (e) restroom facilities. maher na | $120,000 |
| [201504294867](https://www.permitgraph.org/p/201504294867) | Apr 29, 2015 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | 8th flr ste 850 revision to pa #2015.0423.4390: revised office area - lowered occupancy count & added non-infringement statement. n/a maher ordinance |  |
| [201504234390](https://www.permitgraph.org/p/201504234390) | Apr 23, 2015 | Completed: final sign-off May 2015 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | 8th flr ste 850: t.i. improvements to include soft demo, construction of non-load bearing partitions, new office door & frame and new finishes; maher n/a | $22,000 |
| [201411191936](https://www.permitgraph.org/p/201411191936) | Nov 19, 2014 | Never finaled: issued Nov 2014, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th flr, ste 1600, electrical for pa. 201411060872; maher n/a | $15,000 |
| [201411060872](https://www.permitgraph.org/p/201411060872) | Nov 6, 2014 | Completed: final sign-off Jan 2015 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th floor suite 1600 - 2 (e) tenant spaces are being combined into single tenant. mep's, sprinkler & life safety, if need, will be under separate permits. | $75,000 |
| [201408204226](https://www.permitgraph.org/p/201408204226) | Aug 20, 2014 | Completed: final sign-off Dec 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 22/f: fire alarm t.i. add (1) control relay for supply fan. mech. pa#201408083426. n/a ordinance #155-13 | $600 |
| [201408083426](https://www.permitgraph.org/p/201408083426) | Aug 8, 2014 | Never finaled: issued Aug 2014, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215) | replace makeup air unit - electrical for vfd & motors. n/a ordinance #155-13. | $180,000 |
| [201407161368](https://www.permitgraph.org/p/201407161368) | Jul 16, 2014 | Completed: final sign-off Aug 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 17th floor fire alarm system for tenant improvement project: add (5) speaker/strobes. ref #2014.0506.5052. n/a maher ordinance | $2,700 |
| [201407010244](https://www.permitgraph.org/p/201407010244) | Jul 1, 2014 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | ste 1700: install (33) new lights. add receptacles to new rooms. add occupancy sensors for lighting control. original t.i. work under pa 2014/0506/5052. | $30,000 |
| [201406249320](https://www.permitgraph.org/p/201406249320) | Jun 24, 2014 | Completed: final sign-off Aug 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 17th floor #1700 - relocate (6) & plug (1) fire sprinklers. ref pa #2014.0506.5052. n/a maher ordinance | $3,000 |
| [201405065052](https://www.permitgraph.org/p/201405065052) | May 6, 2014 | Completed: final sign-off Oct 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | suite 1700: modification of extg tenant space to include selective demolition and construction of non-load bearing partitions.extg modifications to ceiling grid, new ceiling tile, and lighting fixtur… | $54,000 |
| [201404223846](https://www.permitgraph.org/p/201404223846) | Apr 22, 2014 | Completed: final sign-off May 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm on the 1st fl. add (18) speaker/strobs. na for maher. | $7,000 |
| [201404223847](https://www.permitgraph.org/p/201404223847) | Apr 22, 2014 | Expired or cancelled: cancelled Sep 2023 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm 1st fl add 18 speaker strobes | $7,000 |
| [201404022226](https://www.permitgraph.org/p/201404022226) | Apr 2, 2014 | Never finaled: issued Apr 2014, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i., relocate & change out 16. add 1, total 17 heads. n/a ordinance #155-13 | $8,749 |
| [201312305233](https://www.permitgraph.org/p/201312305233) | Dec 30, 2013 | Completed: final sign-off Jan 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065) | reconfigure ducting after the new walls are built for proper air distribution and air flows as shown on the new drawings. install server room exhaust as shown on the new drawings. | $10,000 |
| [201311252764](https://www.permitgraph.org/p/201311252764) | Nov 25, 2013 | Completed: final sign-off Dec 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | fire sprinknlers: relocate 17 and delete 2 pendent sprinklers | $8,738 |
| [201311121589](https://www.permitgraph.org/p/201311121589) | Nov 12, 2013 | Completed: final sign-off Feb 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | suite 1750: modification of extg t.i. to include construction of non load bearing partitions, modification to ceiling grid and tile , light fixture relocation including re-switching new office doors… | $105,000 |
| [201310159223](https://www.permitgraph.org/p/201310159223) | Oct 15, 2013 | Completed: final sign-off Oct 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 8th & 18th floor-relocate 2 pendent sprinkler heads | $2,000 |
| [201309096312](https://www.permitgraph.org/p/201309096312) | Sep 9, 2013 | Completed: final sign-off Jan 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | common area elevator lobby new finishes, ceiling & lighting, ada upgrade for men's & women's restrooms. electrical, mep defered under seperate permit. | $125,000 |
| [201309096310](https://www.permitgraph.org/p/201309096310) | Sep 9, 2013 | Completed: final sign-off Jan 2014 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | common area elevator lobby new finishes, ceiling & lighting, ada upgrade for men's & women's rooms. electrical, mep defered under seperate permit. | $125,000 |
| [201308194666](https://www.permitgraph.org/p/201308194666) | Aug 19, 2013 | Completed: final sign-off Sep 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | add 1 strobe, 1 speaker. relocate 5 strobes | $3,700 |
| [201308053488](https://www.permitgraph.org/p/201308053488) | Aug 5, 2013 | Completed: final sign-off Sep 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Accurate Contracting Inc.Dba Unispace Co](https://www.permitgraph.org/contractor/accurate-contracting-inc-dba-unispace-co-940969) | demolition of non load bearing partitions. construction of non rated ceiling height partitions. elec, mep, fire , ls, under separate permit | $45,000 |
| [201212105829](https://www.permitgraph.org/p/201212105829) | Dec 10, 2012 | Never finaled: issued Dec 2012, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [S D G/ Sales Distr. Grp](https://www.permitgraph.org/contractor/s-d-g-sales-distr-grp-663025) | randstad professionals - tenant improvement, evacuation maps for fire safety. ste 300. bldg ti pa# 201211073712 | $1,500 |
| [201212055521](https://www.permitgraph.org/p/201212055521) | Dec 5, 2012 | Completed: final sign-off Dec 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor:mechanical and electrical work associated with approved app#201211073712 including new lighting and duct work. | $117,030 |
| [201212035345](https://www.permitgraph.org/p/201212035345) | Dec 3, 2012 | Never finaled: issued Dec 2012, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor-revision to pa# 2012-1107-3712 to install low drinking fountain |  |
| [201211073712](https://www.permitgraph.org/p/201211073712) | Nov 7, 2012 | Completed: final sign-off Dec 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | suite #300-tenant improvement including selective demolition, new non load bearing partitions, new doors & frames, millwork & finishes. mechanical & electrical, life safety & sprinklers under seperat… | $325,000 |
| [201210192424](https://www.permitgraph.org/p/201210192424) | Oct 19, 2012 | Completed: final sign-off Jan 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | remove 2 non structural partitions in suite 1600 (room 111). | $1,000 |
| [201209270796](https://www.permitgraph.org/p/201209270796) | Sep 27, 2012 | Completed: final sign-off Oct 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade. relocate 3 pendent sprinkler heads on the 8th floor. | $1,545 |
| [201209069103](https://www.permitgraph.org/p/201209069103) | Sep 6, 2012 | Completed: final sign-off Oct 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) | this project involves modifications of existing tenant improvement space to include construction of non-load bearing partitions, new office door and frame, and new finishes. mep, f/a, and sprinkler o… | $4,000 |
| [201208096918](https://www.permitgraph.org/p/201208096918) | Aug 9, 2012 | Completed: final sign-off Jan 2013 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | basement:replace diesel pump(fire) 750 gpm @ 220 psi | $80,000 |
| [201203206410](https://www.permitgraph.org/p/201203206410) | Mar 20, 2012 | Completed: final sign-off Jun 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th floor suite 1800 tenant improvement space to include selective demolition & construction of non-load bearing partitions, new office doors & frames, new power & data, millwork & new finishes. fir… | $25,000 |
| [201201172325](https://www.permitgraph.org/p/201201172325) | Jan 17, 2012 | Completed: final sign-off Mar 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 13th floor suite 1350 fire alarm: replace 8 strobes, add 2 new speaker/strobes. must check electrical permit, and check for voltage drop. | $7,000 |
| [201201132220](https://www.permitgraph.org/p/201201132220) | Jan 13, 2012 | Completed: final sign-off Feb 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 13th floor-lighting & title 24 for tenant improvement | $2,000 |
| [201110247419](https://www.permitgraph.org/p/201110247419) | Oct 24, 2011 | Completed: final sign-off Jan 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | elevator lobby finish upgraded and new ceiling. restroom ada upgrades,new ceiling tile and lights in multitenant corridor. | $125,000 |
| [201110247420](https://www.permitgraph.org/p/201110247420) | Oct 24, 2011 | Completed: final sign-off Jan 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 13th fl: tenant improvment. minor demolition of non load bearing partitions, new ceiling tile and light fixtures. elevator lobby finish upgrades, restroom ada improvements | $185,000 |
| [201108263365](https://www.permitgraph.org/p/201108263365) | Aug 26, 2011 | Completed: final sign-off Dec 2011 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ward Alan Emery Construction Inc.](https://www.permitgraph.org/contractor/ward-alan-emery-construction-inc-820710) | 6th floor ste 600 - tenant improvement-renovation of (e) suite including construction of new non bearing partitions, electrical, mechanical & plumbing. life safety, sprinklers under seperate permits | $500,000 |
| [201107261087](https://www.permitgraph.org/p/201107261087) | Jul 26, 2011 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  |  | $500,000 |
| [201107200599](https://www.permitgraph.org/p/201107200599) | Jul 20, 2011 | Completed: final sign-off Dec 2011 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Ward Alan Emery Construction Inc.](https://www.permitgraph.org/contractor/ward-alan-emery-construction-inc-820710) | demo of existing non rated non load bearing partitions, demo of e acoustical ceiling grid and tile | $25,000 |
| [201103313188](https://www.permitgraph.org/p/201103313188) | Mar 31, 2011 | Never finaled: issued Mar 2011, no final | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | suite 1300 - relcoate 1 fire sprinkler and add 1. | $1,000 |
| [201103212446](https://www.permitgraph.org/p/201103212446) | Mar 21, 2011 | Completed: final sign-off Mar 2012 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | office ti on the 13th fl. demo and construction of non load bearing partitions, ada restroom compliance. | $93,253 |
| [201103142053](https://www.permitgraph.org/p/201103142053) | Mar 14, 2011 | Expired or cancelled: cancelled Jan 2026 | [88 Kearny St](https://www.permitgraph.org/a/0311/008) |  | demolition of non-bearing partitions, associated electrical & removal of seven light fixtures per ab-017. |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) (34), [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) (27), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (15), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (11), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (10), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (10), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (10), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (8), [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) (7), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (5), [Commercial Interior Builders Inc](https://www.permitgraph.org/contractor/commercial-interior-builders-inc-647442) (5), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (5), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (3), [Hitt Contracting Inc.](https://www.permitgraph.org/contractor/hitt-contracting-inc-811478) (3), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (3), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (3), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (2), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) (2), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (2), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (2), [Shield Fire Protection, Inc.](https://www.permitgraph.org/contractor/shield-fire-protection-inc-1067016) (2), [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) (2), [Ward Alan Emery Construction Inc.](https://www.permitgraph.org/contractor/ward-alan-emery-construction-inc-820710) (2), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Accurate Contracting Inc.Dba Unispace Co](https://www.permitgraph.org/contractor/accurate-contracting-inc-dba-unispace-co-940969), [Ca United Mechanical, Inc](https://www.permitgraph.org/contractor/ca-united-mechanical-inc-828335), [City Mechanical Inc](https://www.permitgraph.org/contractor/city-mechanical-inc-622065), [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147), [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215), [Johnson Controls Security Solutions Llc](https://www.permitgraph.org/contractor/johnson-controls-security-solutions-llc-977249), [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817), [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064), [S D G/ Sales Distr. Grp](https://www.permitgraph.org/contractor/s-d-g-sales-distr-grp-663025), [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069), [Young Electric Co](https://www.permitgraph.org/contractor/young-electric-co-390749)
- Architects: [Ariane Lebrilla](https://www.permitgraph.org/professional/ariane-lebrilla-C38312) (16), [Megan Koehler](https://www.permitgraph.org/professional/megan-koehler-C33585) (3), [Michael Castro](https://www.permitgraph.org/professional/michael-castro-C24073) (2), [Analogue Studio](https://www.permitgraph.org/professional/analogue-studio-C31702), [Brereton](https://www.permitgraph.org/professional/brereton-C27238), [Donnie Lam](https://www.permitgraph.org/professional/donnie-lam-C32542), [George Josephs](https://www.permitgraph.org/professional/george-josephs-31807), [Joelle Kristina Rosander](https://www.permitgraph.org/professional/joelle-kristina-rosander-C34103), [Koichi Tamaoki](https://www.permitgraph.org/professional/koichi-tamaoki-C17879), [Sashikala Murthy](https://www.permitgraph.org/professional/sashikala-murthy-C39484), [Seth Hanley](https://www.permitgraph.org/professional/seth-hanley-C31110), [Victoria Salgado](https://www.permitgraph.org/professional/victoria-salgado-C37053), [Woods Bagot](https://www.permitgraph.org/professional/woods-bagot-C29703)
- Engineers: [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646) (5), [Dean Macy](https://www.permitgraph.org/professional/dean-macy-E24383) (4), [Rey T. Solidum](https://www.permitgraph.org/professional/rey-t-solidum-M30309) (3), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (3), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894) (2), [Aaron Strauch](https://www.permitgraph.org/professional/aaron-strauch-E15200), [Chan Siong Loh](https://www.permitgraph.org/professional/chan-siong-loh-5192), [David L Mccormick](https://www.permitgraph.org/professional/david-l-mccormick-2975), [Dennis Cheung](https://www.permitgraph.org/professional/dennis-cheung-9279), [Eric Long](https://www.permitgraph.org/professional/eric-long-S5275), [Habtom Tewelde](https://www.permitgraph.org/professional/habtom-tewelde-M39065), [Jesus Cabellon](https://www.permitgraph.org/professional/jesus-cabellon-E9278), [Lars P. Mortensen](https://www.permitgraph.org/professional/lars-p-mortensen-M38284), [Levi G. Abarte](https://www.permitgraph.org/professional/levi-g-abarte-E17622), [Mark Sarkisian](https://www.permitgraph.org/professional/mark-sarkisian-S4639), [Mozart Faizi](https://www.permitgraph.org/professional/mozart-faizi-E15962), [Srdjan Rebraca](https://www.permitgraph.org/professional/srdjan-rebraca-M28498), [Stephen Shaffer](https://www.permitgraph.org/professional/stephen-shaffer-E21097), [Timothy W. Mcpartland](https://www.permitgraph.org/professional/timothy-w-mcpartland-3826), [William Hadinger](https://www.permitgraph.org/professional/william-hadinger-M29805)
- Authorized agents: [Claudette Bleijenberg](https://www.permitgraph.org/professional/claudette-bleijenberg-C31720), [James Gallagher](https://www.permitgraph.org/professional/james-gallagher-928827)
- Designers: [Andrew Erickson](https://www.permitgraph.org/professional/andrew-erickson-927862) (6), [C. Sabah, S. Kain, David Hansen](https://www.permitgraph.org/professional/c-sabah-s-kain-david-hansen-381218) (4), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/professional/anderson-rowe-buckley-inc-91594)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0311/008.