# 27 Maiden Ln

Block 0310, lot 008. Page: https://www.permitgraph.org/a/0310/008

- City's use: Commercial Office
- Built: 1908
- Stories: 7
- Units: 4
- Rooms: 15 bathrooms
- Building: 59,550 sq ft
- Lot: 7,352 sq ft
- Zoning: C3R
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

75 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202604068957](https://www.permitgraph.org/p/202604068957) | Apr 6, 2026 | In progress: filed Apr 2026, not yet issued | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778) | waterproofing front of building including caulking and sealing. | $40,000 |
| [202401234426](https://www.permitgraph.org/p/202401234426) | Jan 23, 2024 | In progress: issued Feb 2024 | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) | install (1) non illuminated wall sign (a golden goose) | $4,000 |
| [202401234427](https://www.permitgraph.org/p/202401234427) | Jan 23, 2024 | In progress: issued Feb 2024 | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) | reface (1) existing banner sign (b) "golden goose" | $2,000 |
| [202110059813](https://www.permitgraph.org/p/202110059813) | Oct 5, 2021 | Completed: final sign-off Oct 2022 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | replace extg conventional facp with new addressable fa panel. replace extg annunciator with a new one. providing and install a new cell communicator next to the nw annunciator in the lobby of the gea… | $48,100 |
| [202101062120](https://www.permitgraph.org/p/202101062120) | Jan 6, 2021 | Completed: final sign-off Oct 2023 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | roof deck improvements: additional prefabricated pergola. | $15,000 |
| [202011138841](https://www.permitgraph.org/p/202011138841) | Nov 13, 2020 | Completed: final sign-off Feb 2021 | [28 Geary St](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | installation of new audio/visual notification devices throughout the area of work. replacing of existing smoke detectors w/new throughout the area of work on level seven. replacement of existing duct… | $31,130 |
| [202009023296](https://www.permitgraph.org/p/202009023296) | Sep 2, 2020 | Completed: final sign-off Sep 2021 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck. | $200,000 |
| [202009023293](https://www.permitgraph.org/p/202009023293) | Sep 2, 2020 | Completed: final sign-off Feb 2021 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | tenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture. | $1,750,000 |
| [201912230305](https://www.permitgraph.org/p/201912230305) | Dec 23, 2019 | Never finaled: issued Feb 2021, no final | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) | install 1 non-illuminated wall single faced sign "golden goose" | $1,500 |
| [201912230307](https://www.permitgraph.org/p/201912230307) | Dec 23, 2019 | Never finaled: issued Feb 2021, no final | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) | install 1 non-illuminated projecting wall double faced blade sign "golden goose" | $2,500 |
| [201805310630](https://www.permitgraph.org/p/201805310630) | May 31, 2018 | Completed: final sign-off Aug 2018 | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | 1/f: installation of (6) new ceiling mount strobes & (2) horn strobes & control modules. all ceiling mount devices to be pendent mounted. installation of (4) new duct smk det. new duct smk det tied i… | $15,996 |
| [M918167](https://www.permitgraph.org/p/M918167) | Apr 26, 2018 | Never finaled: issued May 2018, no final | [30 Geary St](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [201803204186](https://www.permitgraph.org/p/201803204186) | Mar 20, 2018 | Never finaled: issued May 2018, no final | [30 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | ti for new retail store @ ground flr. new fixtures, finishes, partitions, mep. adding 3 fsds. no exterior work, fire protection under sep permit. | $300,000 |
| [201609238637](https://www.permitgraph.org/p/201609238637) | Sep 23, 2016 | Completed: final sign-off Dec 2016 | [28 Geary St](https://www.permitgraph.org/a/0310/008) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | repair to fire dept connection as a result of work under app#201511021401. n/a for maher |  |
| [M669347](https://www.permitgraph.org/p/M669347) | Mar 4, 2016 | Never finaled: issued Mar 2016, no final | [30 Geary St](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [201511021401](https://www.permitgraph.org/p/201511021401) | Nov 2, 2015 | Completed: final sign-off Dec 2016 | [28 Geary St](https://www.permitgraph.org/a/0310/008) |  | replace storefront at retail space on geary st. replace bldg entrance on geary st. n/a for maher | $80,000 |
| [201503261950](https://www.permitgraph.org/p/201503261950) | Mar 26, 2015 | Completed: final sign-off Apr 2015 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | 3rd flr ste 300: demo of interior non-structural partition. maher - not req'd construction separate permit | $25,600 |
| [201503241666](https://www.permitgraph.org/p/201503241666) | Mar 24, 2015 | Completed: final sign-off Jan 2016 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | 7th floor add new fire alarm devices to an existing fire alarm system in the new t.i. space (ref #2015.0128.6852). this includes bps, 1 pull station, 1 smoke detector, 10 duct detectors, 3 strobes &… | $7,460 |
| [M569407](https://www.permitgraph.org/p/M569407) | Mar 17, 2015 | Never finaled: issued Mar 2015, no final | [36 Geary St](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [201503049917](https://www.permitgraph.org/p/201503049917) | Mar 4, 2015 | Completed: final sign-off Jan 2017 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical & electrical work for ti on the 7th floor maher - not req'd arch ref pa# | $18,000 |
| [201502238983](https://www.permitgraph.org/p/201502238983) | Feb 23, 2015 | Completed: final sign-off Apr 2017 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to 2015-0128-6852; to add structural details for new stairs. roof details no maher req'd |  |
| [201501286852](https://www.permitgraph.org/p/201501286852) | Jan 28, 2015 | Completed: final sign-off Jan 2016 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 7th floor t.i. to include demolition of partitions floor finishes, ceiling elements, new load bearing partitions, floor finishes and ceiling elements. mep under sepqarate permit. n/a for maher. | $500,000 |
| [M545507](https://www.permitgraph.org/p/M545507) | Dec 24, 2014 | Never finaled: issued Dec 2014, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [201409176540](https://www.permitgraph.org/p/201409176540) | Sep 17, 2014 | Completed: final sign-off Feb 2015 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | add new horns and strobes to an (e) fire alarm system in 3/f t.i. space, 1 new bps and smoke will be added to power the new nac's. t.i. pa# 201406279683. n/a ordinance #155-13 | $6,200 |
| [201407020327](https://www.permitgraph.org/p/201407020327) | Jul 2, 2014 | Completed: final sign-off Jul 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | install automatic door opener at main entry. n/a ordinance #155-13. | $500 |
| [201407010222](https://www.permitgraph.org/p/201407010222) | Jul 1, 2014 | Completed: final sign-off Feb 2015 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | 7th floor:project scope consists of selective demolition and safe off in vacant 7th floor. no new construction in this scope. n/a for the maher ordinance #155-13 | $5,850 |
| [201406279683](https://www.permitgraph.org/p/201406279683) | Jun 27, 2014 | Completed: final sign-off Jan 2015 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | minor tenant improvement work: non-structural partitions & electrical work. new finishes in same locations, existing heavy duty grid ceiling assembly & light fixtures to remain. this project does not… | $46,546 |
| [201404244045](https://www.permitgraph.org/p/201404244045) | Apr 24, 2014 | Never finaled: issued Apr 2014, no final | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | basement & 1st floor - add new fire alarm devices to an existing fa system in a new t.i. space (#2013.0619.9988). this includes 10 new horn strobes, 2 new strobes & 1 new bps & 2 new duct detectors.… | $7,870 |
| [201403211367](https://www.permitgraph.org/p/201403211367) | Mar 21, 2014 | Completed: final sign-off Jun 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | 1/f: add to an existing fire alarm system. 1 new strobe and 1 new horn strobe in the lobby. relocate pull station to front door. lobby pa# 2014-0107-5709. compliance with ordinance no. 155-13 not req… | $4,100 |
| [201403211362](https://www.permitgraph.org/p/201403211362) | Mar 21, 2014 | Completed: final sign-off Jul 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | 6/f: add to an existing fire alarm system. 4 horn strobes and 2 strobes and 1 bps in the new 6th floor ti (pa# 2014-0127-7166). compliance with ordinance no 155-13 not required. | $6,400 |
| [201402037615](https://www.permitgraph.org/p/201402037615) | Feb 3, 2014 | Completed: final sign-off May 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | install new banner on extg banner poles for a new shoe store. n/a for the maher ordinance #155-13 | $800 |
| [201402037610](https://www.permitgraph.org/p/201402037610) | Feb 3, 2014 | Completed: final sign-off Jul 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | install wall plaque sign for a new shoe store. n/a for the maher ordinance #155-13 | $1,000 |
| [201402037616](https://www.permitgraph.org/p/201402037616) | Feb 3, 2014 | Completed: final sign-off Nov 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | install electrical back lit lettering sign over entry door for new store. n/a for the maher ordinance #155-13 | $1,000 |
| [201401277166](https://www.permitgraph.org/p/201401277166) | Jan 27, 2014 | Completed: final sign-off Jul 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | minor tenant improvement of non structural pariton and minor electrical work. mech/elec/ls under separate permit | $8,750 |
| [201401075709](https://www.permitgraph.org/p/201401075709) | Jan 7, 2014 | Completed: final sign-off Jun 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | revision to appl #2013.08.23.5067 - lobby remodel & interior finishes, revised work scope, store front & signage work under seperate permits. |  |
| [201312315427](https://www.permitgraph.org/p/201312315427) | Dec 31, 2013 | Completed: final sign-off Jul 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | minor revision to 201308154447 to modify exit path only at storefront per storefront design revision required by planning. no change to previously approved mech, plumbing, elec designs, and green bld… |  |
| [201312123987](https://www.permitgraph.org/p/201312123987) | Dec 12, 2013 | Completed: final sign-off Aug 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | modification of the partial sprinkler system and relocation of fire hose cabinet and fire hose 1 total. adding 3 sprinkler in stairwell of adjacent and changing out drops in store front add 4 sprinkl… | $18,000 |
| [201308235067](https://www.permitgraph.org/p/201308235067) | Aug 23, 2013 | Completed: final sign-off Jun 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | basement & 1st floor lobby-remodel & update finishes in basment stairwell. facade work filed under pa# 2013-0513-6767. | $55,000 |
| [M418507](https://www.permitgraph.org/p/M418507) | Aug 19, 2013 | Never finaled: issued Aug 2013, no final | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | street space w/mta |  |
| [201308154447](https://www.permitgraph.org/p/201308154447) | Aug 15, 2013 | Completed: final sign-off Sep 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | revision to app#201306199988 to reduce the scope of the tenant interior improvement. eliminate mezzanine and lift, eliminate stairs on ground level, ground floor to be on one level. |  |
| [201308073693](https://www.permitgraph.org/p/201308073693) | Aug 7, 2013 | Completed: final sign-off Aug 2013 | [28 Geary St](https://www.permitgraph.org/a/0310/008) | [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) | #500- add notification to an existing fire alarm system in a new t.i. space. this includes 5 horn strobes, 1 strobe, 1 bps and 1 smoke detector. t.i. ref. #201306048676 | $6,200 |
| [201306199988](https://www.permitgraph.org/p/201306199988) | Jun 19, 2013 | Completed: final sign-off Sep 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | interior tenant improvement: rebuild mezzanine, new partitions, new lighting, power, hvac, new wheelchair lift and new stair to tennats basement stockroom. any adjustmesnts to extg sprinklers and fir… | $550,000 |
| [201306199962](https://www.permitgraph.org/p/201306199962) | Jun 19, 2013 | Completed: final sign-off Jul 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | non structural interior demolition. remove partitions and wall flooring on ground floor and basement. accessible details will be addressed in subsequent t. i. permit per sfbc ab-17. aka 28 geary - hi… | $5,000 |
| [201306048676](https://www.permitgraph.org/p/201306048676) | Jun 4, 2013 | Completed: final sign-off Dec 2014 | [28 Geary St](https://www.permitgraph.org/a/0310/008) | [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993) | suite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. (e) lighting to remain, no structural work. re-work (e)… | $97,000 |
| [201305298135](https://www.permitgraph.org/p/201305298135) | May 29, 2013 | Completed: final sign-off Aug 2013 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | mezzanine level - demolitoin of existing mezz level & partitoins, the bldg structure is not compromised by this work. no change in occupancy or floor area per ab-017, accessible documentation will be… | $18,000 |
| [201305136767](https://www.permitgraph.org/p/201305136767) | May 13, 2013 | Completed: final sign-off Jun 2014 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | remodel of existing facade. | $75,000 |
| [201305026019](https://www.permitgraph.org/p/201305026019) | May 2, 2013 | Completed: final sign-off Sep 2014 | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) | remodel of (e) vacant retail storefront, interior ti to be submitted under separate permit, store interior to remain vacant per ab-019, signage to be sumbitted under separate permit. f/a, sprinklers… | $125,000 |
| [201303061584](https://www.permitgraph.org/p/201303061584) | Mar 6, 2013 | Completed: final sign-off Apr 2013 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | 1st floor:demolition of non-structural t.i. for vacant space. there is no new construction and no change in occupancy or floor area. per ab-17 accessible documentation will be performed with seperate… | $10,000 |
| [M282827](https://www.permitgraph.org/p/M282827) | Oct 6, 2011 | Never finaled: issued Oct 2011, no final | [29 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | add new address: 29 maiden lane |  |
| [M281267](https://www.permitgraph.org/p/M281267) | Sep 26, 2011 | Never finaled: issued Sep 2011, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [201109154744](https://www.permitgraph.org/p/201109154744) | Sep 15, 2011 | Expired or cancelled: cancelled Jan 2020 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | to erect non-electric,double faced sign. | $400 |
| [201107210735](https://www.permitgraph.org/p/201107210735) | Jul 21, 2011 | Expired or cancelled: cancelled Feb 2013 | [30 Geary St](https://www.permitgraph.org/a/0310/008) |  | existing retail space t.i. provide new storefront, provide new stock room, fitting rooms, & ada restroom. provide new paint, wall-covering, flooring, lighting & fixtures in the sales & storage areas. | $325,000 |
| [201009130766](https://www.permitgraph.org/p/201009130766) | Sep 13, 2010 | Never finaled: issued Oct 2010, no final | [28 Geary St](https://www.permitgraph.org/a/0310/008) |  | add 2 new bathrooms with 1 toilet & 1 sink in each & adding hallway serving spaces a & b. tenant improvement of spaces a & b to be under separate permits. | $10,000 |
| [201008309835](https://www.permitgraph.org/p/201008309835) | Aug 30, 2010 | Never finaled: issued Oct 2010, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Zack De Vito Inc](https://www.permitgraph.org/contractor/zack-de-vito-inc-707355) | a retail bakery - a new non-struct raised flr level throughout the space 7 new interior separating limited food preparation & dishwashing areas from retail & seating areas, mechanical mezzanine lcoat… | $200,000 |
| [M215086](https://www.permitgraph.org/p/M215086) | Aug 10, 2010 | Never finaled: issued Aug 2010, no final | [33 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | add new address 33 maiden ln to block #310 & lot#008. |  |
| [201008068249](https://www.permitgraph.org/p/201008068249) | Aug 6, 2010 | Never finaled: issued Aug 2010, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Zack De Vito Inc](https://www.permitgraph.org/contractor/zack-de-vito-inc-707355) | interior demolition of existing retail space. removal of entry stair, non structural mezzanine, mezzanine stair, (e) interior finishes. vacant space under ab-017. | $10,000 |
| [201007206985](https://www.permitgraph.org/p/201007206985) | Jul 20, 2010 | Never finaled: issued Oct 2010, no final | [33 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Zack De Vito Inc](https://www.permitgraph.org/contractor/zack-de-vito-inc-707355) | remove/replace existing storefront | $125,000 |
| [200910028205](https://www.permitgraph.org/p/200910028205) | Oct 2, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [G C Electric](https://www.permitgraph.org/contractor/g-c-electric-636918) | replace (3) horn strobes, (2) strobes & (2) pull stations to (e) fire alarm. | $3,500 |
| [200908315831](https://www.permitgraph.org/p/200908315831) | Aug 31, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | installation of steel storage racks for clothing at mezzanine level per appl. #2009/0421/6737. | $2,450 |
| [200908215314](https://www.permitgraph.org/p/200908215314) | Aug 21, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | reinforce agent of floor & wall at mezzanine. revision to appl. #2009/0730/3766. | $24,000 |
| [200908104439](https://www.permitgraph.org/p/200908104439) | Aug 10, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Johnston Sign Company](https://www.permitgraph.org/contractor/johnston-sign-company-609593) | install projecting sign 4'x6', double faced, non electric. | $2,500 |
| [200908104440](https://www.permitgraph.org/p/200908104440) | Aug 10, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Johnston Sign Company](https://www.permitgraph.org/contractor/johnston-sign-company-609593) | install illuminated wall sign over entrance.electric, wall, single faced. | $5,000 |
| [200907303766](https://www.permitgraph.org/p/200907303766) | Jul 30, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | reinforcement of floor @ front retail/sales area. revision to appl. #2009/0421/6737. | $15,600 |
| [M174285](https://www.permitgraph.org/p/M174285) | Jul 28, 2009 | Never finaled: issued Jul 2009, no final | [36 Geary St](https://www.permitgraph.org/a/0310/008) |  | street space |  |
| [200905188566](https://www.permitgraph.org/p/200905188566) | May 18, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | mechanical and electrical work for tenant improvement for retail space | $45,000 |
| [200904216737](https://www.permitgraph.org/p/200904216737) | Apr 21, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | ground floor interior reconfiguration of retail space and mezzanine. mechanical & electrical under separate permit. | $300,000 |
| [200903244723](https://www.permitgraph.org/p/200903244723) | Mar 24, 2009 | Completed: final sign-off Jan 2010 | [36 Geary St](https://www.permitgraph.org/a/0310/008) | [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) | minor alterations of storefront & signage. no interior work | $50,000 |
| [200810234946](https://www.permitgraph.org/p/200810234946) | Oct 23, 2008 | Completed: final sign-off Feb 2009 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | tenant improvemennt to include minor demolition of walls and carpet. new dimising wall, addition of select sidelights at offices, corridor doors to bring up to code. mech, electrical, plubming under… | $18,500 |
| [200809171845](https://www.permitgraph.org/p/200809171845) | Sep 17, 2008 | Completed: final sign-off Feb 2009 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [Marina Mechanical Services](https://www.permitgraph.org/contractor/marina-mechanical-services-416198) | tenant improvements, add 5 new water source heat pumps to existing space. tie into (e) base bldg system. fire alarm on seperate permit. | $45,000 |
| [M131596](https://www.permitgraph.org/p/M131596) | Aug 20, 2008 | Never finaled: issued Aug 2008, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | street space permit |  |
| [M34331](https://www.permitgraph.org/p/M34331) | Sep 14, 2005 | Never finaled: issued Sep 2005, no final | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) |  | street space & sidewalk repair |  |
| [200404201734](https://www.permitgraph.org/p/200404201734) | Apr 20, 2004 | Expired or cancelled: expired Jan 2007 | [28 Geary St](https://www.permitgraph.org/a/0310/008) | [Emerald Plbg & Fire Protection](https://www.permitgraph.org/contractor/emerald-plbg-fire-protection-767866) | install new fire pump connect to electrical/to renew for final app #200202280324 | $5,000 |
| [200207151447](https://www.permitgraph.org/p/200207151447) | Jul 15, 2002 | Completed: final sign-off Nov 2002 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [R & D Porter Company Inc](https://www.permitgraph.org/contractor/r-d-porter-company-inc-236687) | oti-2 4th floor el | $10,000 |
| [200206249746](https://www.permitgraph.org/p/200206249746) | Jun 24, 2002 | Completed: final sign-off Nov 2002 | [27 Maiden Ln](https://www.permitgraph.org/a/0310/008) | [R & D Porter Company Inc](https://www.permitgraph.org/contractor/r-d-porter-company-inc-236687) | oti-1,4th flr, ltg only | $74,500 |
| [200202280324](https://www.permitgraph.org/p/200202280324) | Feb 28, 2002 | Never finaled: issued Jun 2002, no final | [28 Geary St](https://www.permitgraph.org/a/0310/008) |  | installation of new fire pump and associated electrical work | $35,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Hurst & Siebert Inc](https://www.permitgraph.org/contractor/hurst-siebert-inc-622681) (11), [H C I Systems Inc](https://www.permitgraph.org/contractor/h-c-i-systems-inc-905493) (9), [Sajo, Inc.](https://www.permitgraph.org/contractor/sajo-inc-746021) (7), [Discount Signs & Neon Inc](https://www.permitgraph.org/contractor/discount-signs-neon-inc-759380) (4), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (3), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (3), [Zack De Vito Inc](https://www.permitgraph.org/contractor/zack-de-vito-inc-707355) (3), [Johnston Sign Company](https://www.permitgraph.org/contractor/johnston-sign-company-609593) (2), [R & D Porter Company Inc](https://www.permitgraph.org/contractor/r-d-porter-company-inc-236687) (2), [D A Pope Inc](https://www.permitgraph.org/contractor/d-a-pope-inc-381993), [Emerald Plbg & Fire Protection](https://www.permitgraph.org/contractor/emerald-plbg-fire-protection-767866), [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778), [G C Electric](https://www.permitgraph.org/contractor/g-c-electric-636918), [Marina Mechanical Services](https://www.permitgraph.org/contractor/marina-mechanical-services-416198), [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568), [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796)
- Architects: [Janet Crane](https://www.permitgraph.org/professional/janet-crane-C8295) (8), [James Zack](https://www.permitgraph.org/professional/james-zack-C24446) (3), [Tim Murphy](https://www.permitgraph.org/professional/tim-murphy-C27780) (3), [James Stefanski](https://www.permitgraph.org/professional/james-stefanski-C28619) (2), [Kristin Murtagh](https://www.permitgraph.org/professional/kristin-murtagh-C32591) (2), [Michael Zucker](https://www.permitgraph.org/professional/michael-zucker-C8820) (2), [Angeline Askham](https://www.permitgraph.org/professional/angeline-askham-C32641), [George S Soskin](https://www.permitgraph.org/professional/george-s-soskin-C9223), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618), [Nichols Booth](https://www.permitgraph.org/professional/nichols-booth-C14737), [Perry Stepheney](https://www.permitgraph.org/professional/perry-stepheney-C17024), [Richard Korchien](https://www.permitgraph.org/professional/richard-korchien-C6836), [Ronald Mark Radziner](https://www.permitgraph.org/professional/ronald-mark-radziner-C22228), [Shawn Fritz](https://www.permitgraph.org/professional/shawn-fritz-C29770)
- Engineers: [Alan C. Burr](https://www.permitgraph.org/professional/alan-c-burr-S5062), [David Murphy](https://www.permitgraph.org/professional/david-murphy-S2379)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0310/008.