# 101 Post St

Block 0310, lot 001. Page: https://www.permitgraph.org/a/0310/001

- City's use: Commercial Retail
- Built: 1969
- Stories: 3
- Rooms: 4 bathrooms
- Building: 19,875 sq ft
- Lot: 4,401 sq ft
- Zoning: C3O
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

60 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609087809](https://www.permitgraph.org/p/202609087809) | Sep 8, 2026 | Completed: final sign-off Oct 2026 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Meyer Coatings Inc](https://www.permitgraph.org/contractor/meyer-coatings-inc-806036) | removal and replacement of the ceramic tile flooring at the exterior side of the main entrance vestibule. | $25,000 |
| [202508193375](https://www.permitgraph.org/p/202508193375) | Aug 19, 2025 | Completed: final sign-off Sep 2025 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bigham Taylor Roofing Co](https://www.permitgraph.org/contractor/bigham-taylor-roofing-co-431631) | re-roofing no torch down | $56,029 |
| [202507301976](https://www.permitgraph.org/p/202507301976) | Jul 30, 2025 | Completed: final sign-off Mar 2026 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Airco Mechanical Inc](https://www.permitgraph.org/contractor/airco-mechanical-inc-311454) | interior t.i. of new supplemental mechanical equipent-ceiling, electrical scope. existing food service not affected by the scope of work. | $175,000 |
| [202507241543](https://www.permitgraph.org/p/202507241543) | Jul 24, 2025 | Completed: final sign-off Sep 2025 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | provide and install (n) 2 duct detectors for shutdown hvac units as shown on drawings | $3,000 |
| [202504224991](https://www.permitgraph.org/p/202504224991) | Apr 22, 2025 | Completed: final sign-off Jun 2025 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | to obtain a final inspection for work approved under permit 202204252917. all work complete. | $60,000 |
| [202503283288](https://www.permitgraph.org/p/202503283288) | Mar 28, 2025 | Completed: final sign-off Jan 2026 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | acco to perform design-build mech construction services to remove/ replace e) 60 ton carrier rooftop cooling only air condition unit w/ a new like for like 60 ton rooftop cooling only unit | $325,000 |
| [202209233014](https://www.permitgraph.org/p/202209233014) | Sep 23, 2022 | Completed: final sign-off Dec 2022 | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | voluntary elevator modernization per sffd letter remove sprinkler heads all piping from mech, top of shaft and pit. no other work. | $1,000 |
| [202204252917](https://www.permitgraph.org/p/202204252917) | Apr 25, 2022 | Never finaled: issued Dec 2022, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | modify (e) fire alarm system, upgrade panel with a new 4100es facp; all (e) horn/strobe appliance shall be replaced with new speaker strobes and strobe only appliances; no changes to the wire or circ… | $10,900 |
| [M1109107](https://www.permitgraph.org/p/M1109107) | Jul 12, 2019 | Never finaled: issued Jul 2019, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [201904047072](https://www.permitgraph.org/p/201904047072) | Apr 4, 2019 | Completed: final sign-off Feb 2020 | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | ref: 2017-1113-3866: modify existing fire alarm system. add 2 wall horn strobes 5 wall strobes relocate 2 wall horn/strobes. | $22,254 |
| [201903266171](https://www.permitgraph.org/p/201903266171) | Mar 26, 2019 | Completed: final sign-off Aug 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121) | 12 adds and relocate 19. ref 201810294350 | $21,700 |
| [M1023528](https://www.permitgraph.org/p/M1023528) | Jan 3, 2019 | Never finaled: issued Jan 2019, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space with meters. |  |
| [M1023547](https://www.permitgraph.org/p/M1023547) | Jan 3, 2019 | Never finaled: issued Jan 2019, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space with meters. |  |
| [201811216581](https://www.permitgraph.org/p/201811216581) | Nov 21, 2018 | Completed: final sign-off Aug 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bulley & Andrews Inc.](https://www.permitgraph.org/contractor/bulley-andrews-inc-1033912) | interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power | $40,000 |
| [201810294350](https://www.permitgraph.org/p/201810294350) | Oct 29, 2018 | Completed: final sign-off Sep 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bulley & Andrews Inc.](https://www.permitgraph.org/contractor/bulley-andrews-inc-1033912) | revision 201711133866 to include modifications of nook spaces, mullion spaces at atm vestibule additional millwork, furniture changes. finishes and lighting |  |
| [M990607](https://www.permitgraph.org/p/M990607) | Oct 9, 2018 | Never finaled: issued Oct 2018, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [M960428](https://www.permitgraph.org/p/M960428) | Aug 6, 2018 | Never finaled: issued Aug 2018, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [201712267332](https://www.permitgraph.org/p/201712267332) | Dec 26, 2017 | Never finaled: issued Aug 2018, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect electric double faced sign, projecting. **maher n/a** | $10,000 |
| [201712267333](https://www.permitgraph.org/p/201712267333) | Dec 26, 2017 | Never finaled: issued Aug 2018, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect a electric single faced wall sign. **maher n/a** | $10,000 |
| [201712267344](https://www.permitgraph.org/p/201712267344) | Dec 26, 2017 | Completed: final sign-off Aug 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect a electric doubled faced sign, interior window. **maher n/a** | $5,000 |
| [201711133866](https://www.permitgraph.org/p/201711133866) | Nov 13, 2017 | Completed: final sign-off Sep 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bulley & Andrews Inc.](https://www.permitgraph.org/contractor/bulley-andrews-inc-1033912) | ti on basement, ground, mezz and rooftop. floors for single tenant incl. selective demo, partition, structural (roof equip curb and anchorage; bsmt shear wall modifications). mep, ceiling, lighting a… | $2,500,000 |
| [201706199723](https://www.permitgraph.org/p/201706199723) | Jun 19, 2017 | Completed: final sign-off Mar 2019 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bulley & Andrews Inc.](https://www.permitgraph.org/contractor/bulley-andrews-inc-1033912) | replace e exterior finishes in kind, new paint at e parapet, lintles, sills, stucco. replace e stonetile cladding in kind with new brick tile veneer | $15,275 |
| [201607142355](https://www.permitgraph.org/p/201607142355) | Jul 14, 2016 | Completed: final sign-off Aug 2016 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Western Allied Mechanical Inc.](https://www.permitgraph.org/contractor/western-allied-mechanical-inc-826782) | install (2) fan coil units for additional cooling for conference space on 3rd floor & roof. | $50,000 |
| [201606079256](https://www.permitgraph.org/p/201606079256) | Jun 7, 2016 | Never finaled: issued Jun 2016, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238) | remove "360 cafe" logo and center existing "capital one" sign on canopy. change lettering on existing canopy. n/a for maher. | $1,000 |
| [201406249231](https://www.permitgraph.org/p/201406249231) | Jun 24, 2014 | Completed: final sign-off Sep 2014 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Horizon Retail Construction Inc](https://www.permitgraph.org/contractor/horizon-retail-construction-inc-676686) | remodel of existing cafe, new interior walls, new plumbing fixtures, new supply & returns. n/a ordinance #155-13. | $150,000 |
| [201406249245](https://www.permitgraph.org/p/201406249245) | Jun 24, 2014 | Never finaled: issued Dec 2014, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | painted non-structural sign. install 2 sets of door vinyl for "capital one cafe" measuring 4"h x 18"w each. n/a for the maher ordinance #155-13 | $200 |
| [201406249236](https://www.permitgraph.org/p/201406249236) | Jun 24, 2014 | Never finaled: issued Dec 2014, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install 1 sets of non-illuminated aluminum letters onto face of extg canopy for "capital one cafe" n/a for the maher ordinanace #155-13 | $500 |
| [201406249237](https://www.permitgraph.org/p/201406249237) | Jun 24, 2014 | Completed: final sign-off Aug 2015 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install 4 illuminated double faced electric window sign on bldg interior. n/a for the maher ordinanace #155-13 | $6,000 |
| [201406249232](https://www.permitgraph.org/p/201406249232) | Jun 24, 2014 | Never finaled: issued Dec 2014, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install 2 sets of non-illuminated single faced non-electric aluminum letters onto ends of extg canopy for " peets coffee "tea" n/a for the maher ordinanace #155-13 | $1,000 |
| [201404234005](https://www.permitgraph.org/p/201404234005) | Apr 23, 2014 | Completed: final sign-off Feb 2015 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2/f: revision to app# 201308093986, request for technical infeasibility an office t.i.-non conforming clear space at restroom. |  |
| [201311121638](https://www.permitgraph.org/p/201311121638) | Nov 12, 2013 | Completed: final sign-off Jan 2014 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) | fire alarm t.i. to 2nd floor. seven new horn/strobes. t.i. 201308093986 | $4,000 |
| [201311041022](https://www.permitgraph.org/p/201311041022) | Nov 4, 2013 | Completed: final sign-off Jan 2014 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Cisco Fire Sprinklers, Inc.](https://www.permitgraph.org/contractor/cisco-fire-sprinklers-inc-715741) | 2nd floor-relocate & add 10 fire sprinklers & upgrade bracing on (e) system | $6,000 |
| [201310250302](https://www.permitgraph.org/p/201310250302) | Oct 25, 2013 | Completed: final sign-off Feb 2015 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | reivision to pa# 2013-0809-3986-delete rated walls from work area, replace with accoustic walls, remove fire dampers. room does not need to be rated per sfab 060 |  |
| [201308093986](https://www.permitgraph.org/p/201308093986) | Aug 9, 2013 | Completed: final sign-off Feb 2015 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | inter connecting stair between 2 & 3 floors. 2nd floor t.i. conference and break room build out. new lighting and electrical. demo restroom finishes, partial removal of slab above to 3rd floor for ne… | $500,000 |
| [201212105798](https://www.permitgraph.org/p/201212105798) | Dec 10, 2012 | Completed: final sign-off May 2013 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect non-electric, wall, single-faced, non-illuminated, new sign. | $2,000 |
| [201212105800](https://www.permitgraph.org/p/201212105800) | Dec 10, 2012 | Completed: final sign-off May 2013 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | painted non-electric, projecting, double-faced, non-illuminated, replacement canvas banner. | $2,000 |
| [201112190954](https://www.permitgraph.org/p/201112190954) | Dec 19, 2011 | Completed: final sign-off Dec 2011 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | mezz, 2nd & 3rd level - level 2 relcoate 10 sprinklers, add 4; level 3 relcoate 9 sprinklers, add 4; mezz relocate 6 sprinklers. change of use under pa #201105246683. | $12,500 |
| [201111148750](https://www.permitgraph.org/p/201111148750) | Nov 14, 2011 | Never finaled: issued Nov 2011, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | provide clean agent system in basement server room. | $8,100 |
| [201110317951](https://www.permitgraph.org/p/201110317951) | Oct 31, 2011 | Completed: final sign-off Dec 2011 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | basement & 1st floor-add 31 sprinkler & relocated 3 sprinklers on 2 floors. basement & level 1. change of use pa # 2011-0524-6683 | $17,000 |
| [M287047](https://www.permitgraph.org/p/M287047) | Oct 31, 2011 | Never finaled: issued Oct 2011, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space with mta |  |
| [201109023855](https://www.permitgraph.org/p/201109023855) | Sep 2, 2011 | Completed: final sign-off Dec 2011 | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | fire alarm system consisiting of 1 new power supply, 1 smoke control panel, 1 pull station, 20 smoke dtectors, 13 duct smoke detectors, 4 monitor modules, 1 control zam, 18 strobes, 21 horn strobes | $12,000 |
| [201107180462](https://www.permitgraph.org/p/201107180462) | Jul 18, 2011 | Expired or cancelled: cancelled Jun 2018 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | erect five non electric, single faced, door/window signs. | $200 |
| [201107180463](https://www.permitgraph.org/p/201107180463) | Jul 18, 2011 | Expired or cancelled: cancelled Jun 2018 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | erect electric, single faced projecting sign. | $5,000 |
| [201107180461](https://www.permitgraph.org/p/201107180461) | Jul 18, 2011 | Expired or cancelled: cancelled Jun 2018 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | erect non electric sign, single faced, door/window sign. | $100 |
| [201107180459](https://www.permitgraph.org/p/201107180459) | Jul 18, 2011 | Expired or cancelled: cancelled Jun 2018 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | erect five non electric, double faced, projecting roof signs. | $500 |
| [201107150288](https://www.permitgraph.org/p/201107150288) | Jul 15, 2011 | Expired or cancelled: cancelled Mar 2020 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | storefront to remain as is-alterations to canopy and new signs only. | $10,000 |
| [201105246683](https://www.permitgraph.org/p/201105246683) | May 24, 2011 | Completed: final sign-off Feb 2012 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) | change of use in basement ground and mezzanine. interior tenant improvement. new basement kitchen, new small coffee bar at g/f. new steel stairs at each floor. new storefront enclosure at interior at… | $3,500,000 |
| [M254906](https://www.permitgraph.org/p/M254906) | Apr 18, 2011 | Never finaled: issued Apr 2011, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [201104073692](https://www.permitgraph.org/p/201104073692) | Apr 7, 2011 | Completed: final sign-off Feb 2012 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | interior non-structural demolition to include demo and removal of interior stairs and railings and restrooms in basement, 1st, 2nd, 3rd floors. work per ab-017. ref app 201101067977 | $50,000 |
| [201103212506](https://www.permitgraph.org/p/201103212506) | Mar 21, 2011 | Expired or cancelled: cancelled Dec 2011 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | temporary window vinyl covering (non structural) | $4,000 |
| [M237266](https://www.permitgraph.org/p/M237266) | Jan 20, 2011 | Never finaled: issued Jan 2011, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [M236846](https://www.permitgraph.org/p/M236846) | Jan 14, 2011 | Never finaled: issued Jan 2011, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space permit |  |
| [201101067977](https://www.permitgraph.org/p/201101067977) | Jan 6, 2011 | Completed: final sign-off Feb 2012 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | removal of escalator on all floors, and filling in of concrete to restore original floor area. sprkler affected will be raised | $120,000 |
| [200909086299](https://www.permitgraph.org/p/200909086299) | Sep 8, 2009 | Never finaled: issued Sep 2009, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Fine Line Group Inc](https://www.permitgraph.org/contractor/fine-line-group-inc-396734) | interior demo. of (e) vacant retail. removal of non-structural partition walls, doors, millwork and art features. per ab 17. | $9,000 |
| [200311190600](https://www.permitgraph.org/p/200311190600) | Nov 19, 2003 | Expired or cancelled: expired May 2006 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | revise to app #200211040732 delete slab infill and cantilever supports and delete special inspection |  |
| [200304011167](https://www.permitgraph.org/p/200304011167) | Apr 1, 2003 | Completed: final sign-off Apr 2003 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Brite Lite Neon Corp](https://www.permitgraph.org/contractor/brite-lite-neon-corp-161718) | to erect electrical sign |  |
| [200302036529](https://www.permitgraph.org/p/200302036529) | Feb 3, 2003 | Expired or cancelled: expired Dec 2003 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | provide 1 strobe at 2nd flr & 1 at 3rd flr | $1,500 |
| [M22521](https://www.permitgraph.org/p/M22521) | Jan 3, 2003 | Never finaled: issued Jan 2003, no final | [101 Post St](https://www.permitgraph.org/a/0310/001) |  | street space |  |
| [200211212054](https://www.permitgraph.org/p/200211212054) | Nov 21, 2002 | Expired or cancelled: expired Dec 2003 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | t-24 only, lighting & lt. controls to remain as is |  |
| [200211040732](https://www.permitgraph.org/p/200211040732) | Nov 4, 2002 | Completed: final sign-off Nov 2003 | [101 Post St](https://www.permitgraph.org/a/0310/001) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | minor interior remodel, partition framing & drywall, 2 finishes, fire sprinklers,life safety,mechan. | $150,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (9), [Plant Construction Company Lp](https://www.permitgraph.org/contractor/plant-construction-company-lp-830764) (6), [Bulley & Andrews Inc.](https://www.permitgraph.org/contractor/bulley-andrews-inc-1033912) (4), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (3), [Johnson Controls Fire](https://www.permitgraph.org/contractor/johnson-controls-fire-986047) (3), [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) (3), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) (2), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Airco Mechanical Inc](https://www.permitgraph.org/contractor/airco-mechanical-inc-311454), [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794), [Bigham Taylor Roofing Co](https://www.permitgraph.org/contractor/bigham-taylor-roofing-co-431631), [Brite Lite Neon Corp](https://www.permitgraph.org/contractor/brite-lite-neon-corp-161718), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Cisco Fire Sprinklers, Inc.](https://www.permitgraph.org/contractor/cisco-fire-sprinklers-inc-715741), [Coast Sign Incorporated](https://www.permitgraph.org/contractor/coast-sign-incorporated-654238), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779), [Fine Line Group Inc](https://www.permitgraph.org/contractor/fine-line-group-inc-396734), [Horizon Retail Construction Inc](https://www.permitgraph.org/contractor/horizon-retail-construction-inc-676686), [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289), [Meyer Coatings Inc](https://www.permitgraph.org/contractor/meyer-coatings-inc-806036), [Superior Automatic Sprinkler](https://www.permitgraph.org/contractor/superior-automatic-sprinkler-287121), [Western Allied Mechanical Inc.](https://www.permitgraph.org/contractor/western-allied-mechanical-inc-826782)
- Architects: [James Stapleton](https://www.permitgraph.org/professional/james-stapleton-C24471), [Patrick Bartlett](https://www.permitgraph.org/professional/patrick-bartlett-C21377)
- Engineers: [Luis Perez](https://www.permitgraph.org/professional/luis-perez-M40294), [Mathew Debevec](https://www.permitgraph.org/professional/mathew-debevec-M35990), [Michael Shepherd](https://www.permitgraph.org/professional/michael-shepherd-E20195), [Robert Monaghan](https://www.permitgraph.org/professional/robert-monaghan-27910), [Seth Sherman](https://www.permitgraph.org/professional/seth-sherman-M33883), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646)
- Designers: [R L H Fire Protection Inc](https://www.permitgraph.org/professional/r-l-h-fire-protection-inc-777717)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0310/001.