# 535 Taylor St

Block 0305, lot 003. Page: https://www.permitgraph.org/a/0305/003

- City's use: Multi-Family Residential
- Built: 1923
- Stories: 6
- Units: 41
- Rooms: 49 bathrooms
- Building: 24,036 sq ft
- Lot: 4,438 sq ft
- Zoning: RC4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

23 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609027616](https://www.permitgraph.org/p/202609027616) | Sep 2, 2026 | In progress: issued Sep 2026 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Sfbm Group Llc.](https://www.permitgraph.org/contractor/sfbm-group-llc-1156948) | unit 202: replace leaking angle stops in kitchen and bathroom, repair drywall and patch unit. update electrical, paint unit. no structural / no change of use and layout / no change in unit count. | $500 |
| [202605121121](https://www.permitgraph.org/p/202605121121) | May 12, 2026 | In progress: issued May 2026 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Front Line Team Inc](https://www.permitgraph.org/contractor/front-line-team-inc-1100368) | unit #403: remodel kitchen and bathroom. upgrade electrical in unit. no layout change. tub to shower conversion. no removal of walls | $40,000 |
| [202412025925](https://www.permitgraph.org/p/202412025925) | Dec 2, 2024 | Completed: final sign-off Mar 2025 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit 106, 2nd fl - convert (e) kitchen to bedroom; relocate (e) kitchen; rehabilitate (e) bathroom; install washer and dryer | $65,000 |
| [202412025930](https://www.permitgraph.org/p/202412025930) | Dec 2, 2024 | Completed: final sign-off Mar 2025 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit# 402: rehabilitate exsiting kitchen, bathroom and install washer and dryer. | $65,000 |
| [202409100449](https://www.permitgraph.org/p/202409100449) | Sep 10, 2024 | Completed: final sign-off Nov 2024 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit 503 on 6/f: rehabilitate existing kitchen, rehabilitate existing bathroom. install washer and dryer. | $60,000 |
| [202403087405](https://www.permitgraph.org/p/202403087405) | Mar 8, 2024 | Completed: final sign-off May 2024 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit 203: convert existing living room to bedroom. relocate kitchen, rehabilitate existing bathroom, install w/d. | $60,000 |
| [202304045004](https://www.permitgraph.org/p/202304045004) | Apr 4, 2023 | Completed: final sign-off Jul 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit 504: rehabilitate one existing kitchen in kind- rehabilitate one existing bathroom in kind: no demo of walls | $50,000 |
| [202303294667](https://www.permitgraph.org/p/202303294667) | Mar 29, 2023 | Completed: final sign-off Jul 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit# 406: rehab existing kitchen, rehab existing bathroom, install washer/ dryer | $45,000 |
| [202303093344](https://www.permitgraph.org/p/202303093344) | Mar 9, 2023 | Completed: final sign-off Aug 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit# 307: convert existing kitchen to bedroom, relocate kitchen, rehabilatate existing bathroom, install wash and dryer. | $70,000 |
| [202302101787](https://www.permitgraph.org/p/202302101787) | Feb 10, 2023 | Completed: final sign-off Jun 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit# 405: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $50,000 |
| [202302101789](https://www.permitgraph.org/p/202302101789) | Feb 10, 2023 | Completed: final sign-off Jul 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) | unit # 605: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $50,000 |
| [202301200433](https://www.permitgraph.org/p/202301200433) | Jan 20, 2023 | Completed: final sign-off Feb 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Poly-On Security System Inc.](https://www.permitgraph.org/contractor/poly-on-security-system-inc-1044620) | upgrade the (e) fire alarm system by replacing it with (1) addressible fire alarm unit (1) wireless commnicator next to facu (16) addressible (1) addressible heat detector (1) addressible manual pull… | $49,000 |
| [202208251264](https://www.permitgraph.org/p/202208251264) | Aug 25, 2022 | Completed: final sign-off Mar 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) | apt 601: interior renovation: convert (e) living room into one bedroom, remodel kitchen. replace shower. total of 2 bedrooms. | $45,000 |
| [202207138393](https://www.permitgraph.org/p/202207138393) | Jul 13, 2022 | Completed: final sign-off Mar 2023 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) | unit # 507: reconfigure interior layout with 1 bedroom, 1 -bath, kitchen, and living rm | $40,000 |
| [202201075555](https://www.permitgraph.org/p/202201075555) | Jan 7, 2022 | Completed: final sign-off Sep 2022 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | 3rd fl: (unit 303) reconfigure interior layout w/ 1 bedroom, one bathroom, nook kitchen, dining living rooms. | $20,000 |
| [202107275161](https://www.permitgraph.org/p/202107275161) | Jul 27, 2021 | Completed: final sign-off Oct 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | #506. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| [202107275162](https://www.permitgraph.org/p/202107275162) | Jul 27, 2021 | Completed: final sign-off Oct 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | #604. full kitchen and bathroom remodel. replace tub for shower. full electrical upgrae. no structural work to be done. no layout change, no stud wall framing demolition. | $29,000 |
| [202104088152](https://www.permitgraph.org/p/202104088152) | Apr 8, 2021 | Completed: final sign-off Jul 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | #204 full kitchen and bathroom remodel, same layouts, replace tub for shower in the bathroom. complete electrical rewire. no wllas to be moved. | $29,500 |
| [202103035746](https://www.permitgraph.org/p/202103035746) | Mar 3, 2021 | Never finaled: issued Nov 2021, no final | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | unit 201: add one bedroom. remodel kitchen. | $20,000 |
| [202012181319](https://www.permitgraph.org/p/202012181319) | Dec 18, 2020 | Completed: final sign-off Mar 2021 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | unit 404. remodel kitchen and bathroom in studio apartment. same layout. change tub for shower. rewire unit and upgrade subpanel. no walls to be removed. | $30,000 |
| [202006108360](https://www.permitgraph.org/p/202006108360) | Jun 10, 2020 | Completed: final sign-off Sep 2020 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | #602: remodel kitchen and bathroom in-kind. complete re-wire. swapping tub for shower. all walls to remain, no movement. | $29,000 |
| [201904087393](https://www.permitgraph.org/p/201904087393) | Apr 8, 2019 | Completed: final sign-off Nov 2020 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Kasas Builders Inc](https://www.permitgraph.org/contractor/kasas-builders-inc-1043400) | # 607:revision to 2019.0205.2160. remodel #607, same layout; rewire the kitchen, bath, bedroom; new interior sheetrock, new subpanel; rough electrical for sub & main panel; rough plumbing, same layou… | $8,000 |
| [201902052160](https://www.permitgraph.org/p/201902052160) | Feb 5, 2019 | Completed: final sign-off Aug 2019 | [535 Taylor St](https://www.permitgraph.org/a/0305/003) | [Kasas Builders Inc](https://www.permitgraph.org/contractor/kasas-builders-inc-1043400) | uni#607: to comply with nov#201704641.items 3,4,5,6,11,12. all new led lighting,same layout, rewire the kitchen,bathroom &bedroom/livingroom.open sheetrock only on areas to run the electrical wires,… | $62,200 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Axel8 Construction](https://www.permitgraph.org/contractor/axel8-construction-1045139) (9), [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) (7), [Kasas Builders Inc](https://www.permitgraph.org/contractor/kasas-builders-inc-1043400) (2), [Metro General Construction Inc](https://www.permitgraph.org/contractor/metro-general-construction-inc-1039728) (2), [Front Line Team Inc](https://www.permitgraph.org/contractor/front-line-team-inc-1100368), [Poly-On Security System Inc.](https://www.permitgraph.org/contractor/poly-on-security-system-inc-1044620), [Sfbm Group Llc.](https://www.permitgraph.org/contractor/sfbm-group-llc-1156948)
- Architects: [Joe Kon](https://www.permitgraph.org/professional/joe-kon-S5425) (2)
- Engineers: [Joe Win Kon](https://www.permitgraph.org/professional/joe-win-kon-S5425) (6), [Jeff Chow](https://www.permitgraph.org/professional/jeff-chow-C81252) (3)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0305/003.
