# 605 Post St

Block 0305, lot 001. Page: https://www.permitgraph.org/a/0305/001

- City's use: Multi-Family Residential
- Built: 1922
- Stories: 6
- Units: 35
- Rooms: 37 bathrooms
- Building: 19,410 sq ft
- Lot: 3,206 sq ft
- Zoning: RC4
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

12 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202604300373](https://www.permitgraph.org/p/202604300373) | Apr 30, 2026 | Completed: final sign-off Aug 2026 | [605 Post St](https://www.permitgraph.org/a/0305/001) | [D & K Construction &Painting Company Inc](https://www.permitgraph.org/contractor/d-k-construction-painting-company-inc-469401) | revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage. |  |
| [202602276712](https://www.permitgraph.org/p/202602276712) | Feb 27, 2026 | Completed: final sign-off Aug 2026 | [605 Post St](https://www.permitgraph.org/a/0305/001) | [D & K Construction &Painting Company Inc](https://www.permitgraph.org/contractor/d-k-construction-painting-company-inc-469401) | convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operation | $35,000 |
| [202511250377](https://www.permitgraph.org/p/202511250377) | Dec 9, 2025 | In progress: issued Mar 2026 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) | [Rcm Fire Protection Inc.](https://www.permitgraph.org/contractor/rcm-fire-protection-inc-793205) | upgrade existing fire aalrm system one for one, add new low frequency notification devices inse all sleeping rooms & living rooms to meet the sf 75 db @ the pilow ordinace,existing elevator has only… | $60,000 |
| [202505217019](https://www.permitgraph.org/p/202505217019) | May 21, 2025 | Completed: final sign-off Oct 2025 | [551 Taylor St](https://www.permitgraph.org/a/0305/001) | [F C Company](https://www.permitgraph.org/contractor/f-c-company-1022789) | replace front glass in kind. (front visible from street). u-factor <=0.58 | $2,000 |
| [M287567](https://www.permitgraph.org/p/M287567) | Nov 4, 2011 | Never finaled: issued Nov 2011, no final | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | street space & mta parking meter |  |
| [200802285893](https://www.permitgraph.org/p/200802285893) | Feb 28, 2008 | Never finaled: issued Feb 2008, no final | [555 Taylor St](https://www.permitgraph.org/a/0305/001) | [Bay Concrete Construction](https://www.permitgraph.org/contractor/bay-concrete-construction-521722) | revision to pa# 2007.12.04.9621. repair of (e) sidewalk. modification to structural details in response to exposed on-site condition |  |
| [200712049621](https://www.permitgraph.org/p/200712049621) | Dec 4, 2007 | Completed: final sign-off Sep 2008 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | remove & replace sidewalk above basement along post st., infill existing service hatch on taylor st. | $50,000 |
| [200712049623](https://www.permitgraph.org/p/200712049623) | Dec 4, 2007 | Completed: final sign-off Aug 2008 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | change to approved application 20010115205 change to second floor framing at bar change to bathrooms | $1,000 |
| [200710115205](https://www.permitgraph.org/p/200710115205) | Oct 11, 2007 | Completed: final sign-off Aug 2008 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | reframe (e) mezzanine level and remodel bathrooms as part of the handicap improvements. no increase of mezzanine and 1st floor areas. replave entry door to be ada compliant. | $45,000 |
| [200508049425](https://www.permitgraph.org/p/200508049425) | Aug 4, 2005 | Never finaled: issued Aug 2005, no final | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | renew building permit 200412131227 |  |
| [200501314377](https://www.permitgraph.org/p/200501314377) | Jan 31, 2005 | Completed: final sign-off Apr 2005 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) |  | ada upgrade of entry door hardware as reqd by 20% rule for repair of ceiling on earlier permit ref | $9,000 |
| [200412131227](https://www.permitgraph.org/p/200412131227) | Dec 13, 2004 | Expired or cancelled: expired Apr 2005 | [555 Taylor St](https://www.permitgraph.org/a/0305/001) | [Bryan Hodes Gen Contracto](https://www.permitgraph.org/contractor/bryan-hodes-gen-contracto-462091) | 1 hr ceiling; emergency repair-storage rm, maintain occupancy, separation (plans under separate perm | $4,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [D & K Construction &Painting Company Inc](https://www.permitgraph.org/contractor/d-k-construction-painting-company-inc-469401) (2), [Bay Concrete Construction](https://www.permitgraph.org/contractor/bay-concrete-construction-521722), [Bryan Hodes Gen Contracto](https://www.permitgraph.org/contractor/bryan-hodes-gen-contracto-462091), [F C Company](https://www.permitgraph.org/contractor/f-c-company-1022789), [Rcm Fire Protection Inc.](https://www.permitgraph.org/contractor/rcm-fire-protection-inc-793205)
- Architects: [Francisco Matos](https://www.permitgraph.org/professional/francisco-matos-C34078) (2), [John Duffy Architect](https://www.permitgraph.org/professional/john-duffy-architect-C28303)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0305/001.
