| [201310189648](https://www.permitgraph.org/p/201310189648) | Oct 18, 2013 | Completed: final sign-off Dec 2013 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778) | remove rust from roof beam, approx 5' below parapet on west side lightwell & on beam 2' below parapet on south wall. treat beams with corrison inhabitor. rebuild in kind. attach plate to underside of… | $64,000 |
| [201112080308](https://www.permitgraph.org/p/201112080308) | Dec 8, 2011 | Expired or cancelled: cancelled Jan 2026 | [141 Kearny St](https://www.permitgraph.org/a/0293/002) |  | new interior decor package in sales area. new refrigerated cases in sales area. new millwork,shelves and fixtures. new beverage bar in sales area with new handsink and 3 comp. sink in all area. paint… | $432,000 |
| [201110217365](https://www.permitgraph.org/p/201110217365) | Oct 21, 2011 | Completed: final sign-off Jan 2012 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) | [Commercial Building Maintenance Dba Cbm](https://www.permitgraph.org/contractor/commercial-building-maintenance-dba-cbm-956375) | 1/f - install new floor covering, upgrading 1 circuit & install 1 new circuit for hand dryer. replace hand sink, install new wall covering | $17,000 |
| [201105186293](https://www.permitgraph.org/p/201105186293) | May 18, 2011 | Completed: final sign-off May 2012 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Marina Mechanical Services](https://www.permitgraph.org/contractor/marina-mechanical-services-416198) | 2nd fl. ti improvement hvac add vav hw rh zones and distribution duct to existing base system. | $77,000 |
| [201105176198](https://www.permitgraph.org/p/201105176198) | May 17, 2011 | Never finaled: issued May 2011, no final | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | mezz & basement core - add to an existing fire alarm system new fa devices in the core area of the basement & mezz levels. this includes 5 horn storbes & 1 strobe. | $5,400 |
| [201105176200](https://www.permitgraph.org/p/201105176200) | May 17, 2011 | Completed: final sign-off Jun 2011 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | 2nd floor & mezz level - add to an existing fire alarm system new fa devices in the t.i. space (t.i. pa #201103313180). this includes 2 smokes, 1 duct detector, 17 horn strobes, 4 strobes. | $5,800 |
| [201104053479](https://www.permitgraph.org/p/201104053479) | Apr 5, 2011 | Completed: final sign-off Jan 2014 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add new fire alarm devices to existing fa system in new rth fl ti space (ti 201102180412) includes 11 horn/strobes, 1 smk, 1 duct det) | $5,200 |
| [201103313180](https://www.permitgraph.org/p/201103313180) | Mar 31, 2011 | Completed: final sign-off May 2012 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | 2nd floor & mezzanine-t.i. to (e) office space including new office, conference rooms, reception, video studio & kitchenette; mep under separate permit | $450,000 |
| [201103303062](https://www.permitgraph.org/p/201103303062) | Mar 30, 2011 | Completed: final sign-off May 2012 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Marina Mechanical Services](https://www.permitgraph.org/contractor/marina-mechanical-services-416198) | ti improvement for hvac. add vav hot water reheat zones and distribution duct to extg base system. reference permit #201102180512 | $54,000 |
| [M245486](https://www.permitgraph.org/p/M245486) | Mar 7, 2011 | Never finaled: issued Mar 2011, no final | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | street space |  |
| [201103011141](https://www.permitgraph.org/p/201103011141) | Mar 1, 2011 | Completed: final sign-off Jun 2011 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add new fire alrm devices to an extg fa system in empty tenant spaces on 2nd and 4th floor.this includes 4 smoke detectors,3 duct detectors, 5 horn strobes, and 4 strobes. t i #201009241603. | $6,400 |
| [201102180512](https://www.permitgraph.org/p/201102180512) | Feb 18, 2011 | Completed: final sign-off May 2012 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | 4th floor-t.i. to (e) suite #1, tenant space divided into 2 suites, new non structural interior partitions. m.e.p under seperate permit | $200,000 |
| [201102089837](https://www.permitgraph.org/p/201102089837) | Feb 8, 2011 | Completed: final sign-off May 2012 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | 2nd. & 4th. flr.: revision to app#201009241603.remove walls @ corridor, enlarge bathroom. |  |
| [201101078075](https://www.permitgraph.org/p/201101078075) | Jan 7, 2011 | Never finaled: issued Mar 2011, no final | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | install 2 smoke detectors and 2 heat detectors for elevator recall and elev shunt on 1st floor | $1,500 |
| [201010223590](https://www.permitgraph.org/p/201010223590) | Oct 22, 2010 | Completed: final sign-off Jan 2014 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add 2 new smoke detectors to existing fire alarm system on the 5th flr elevator lobby for existing door holders release | $3,700 |
| [201010052306](https://www.permitgraph.org/p/201010052306) | Oct 5, 2010 | Expired or cancelled: withdrawn Feb 2014 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 5th floor-life safety modifications-adding 2 smoke detectors | $50,000 |
| [201009241603](https://www.permitgraph.org/p/201009241603) | Sep 24, 2010 | Completed: final sign-off May 2011 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | office ti on the 2nd and 4th floor. new floor finish, rated enclosures at stairs, renovated and new restrooms. new hvac system.life safty/sprnkr/fire alarm associated work shall be under seperate per… | $250,000 |
| [201007025892](https://www.permitgraph.org/p/201007025892) | Jul 2, 2010 | Completed: final sign-off Oct 2010 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | 5th floor t.i. unclude demolition of non-structural partitions & bldg new non-structural paritions. all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted s… | $60,000 |
| [200705070590](https://www.permitgraph.org/p/200705070590) | May 7, 2007 | Expired or cancelled: withdrawn Aug 2007 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | selective structural demo per plan to enable structural engineer to prepare plan for full seismic upgrade | $150,000 |
| [200705020274](https://www.permitgraph.org/p/200705020274) | May 2, 2007 | Never finaled: issued May 2007, no final | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | 1) non-structural interior demolition,2) per administrative bulletin no. ab-017, a full accessibility will be provided under seperate permit | $105,000 |
| [200603287648](https://www.permitgraph.org/p/200603287648) | Mar 28, 2006 | Expired or cancelled: withdrawn Aug 2007 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | convert existing office to residential condominiums. existing retail will remain on ground floor. associated bldg services will remain at basement and 2nd floor. | $750,000 |
| [200410136610](https://www.permitgraph.org/p/200410136610) | Oct 13, 2004 | Expired or cancelled: cancelled Apr 2009 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) | [Sign Designs Inc.](https://www.permitgraph.org/contractor/sign-designs-inc-268001) | remove (e) illeg awning + frame work. install new fabric awning + new frames with 7-11 copy on fabric + install lighting. | $6,000 |
| [200405103481](https://www.permitgraph.org/p/200405103481) | May 10, 2004 | Expired or cancelled: expired Jun 2007 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 1/f- furnish & install duct detector @ 7-11 | $800 |
| [200403168795](https://www.permitgraph.org/p/200403168795) | Mar 16, 2004 | Completed: final sign-off Apr 2004 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | rev#200311251156. minor revision including coffee irland orientation condensers unit relocation chan |  |
| [200403088071](https://www.permitgraph.org/p/200403088071) | Mar 8, 2004 | Never finaled: issued Mar 2004, no final | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [James Construction**See Note***](https://www.permitgraph.org/contractor/james-construction-see-note-493452) | build approx 6' of wall patch (e) walls & fire tape.demo approx 50' of wall | $5,000 |
| [200401144009](https://www.permitgraph.org/p/200401144009) | Jan 14, 2004 | Completed: final sign-off Apr 2004 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | erect non structural sign | $1,000 |
| [M25808](https://www.permitgraph.org/p/M25808) | Dec 11, 2003 | Never finaled: issued Dec 2003, no final | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | street space permit |  |
| [200312021453](https://www.permitgraph.org/p/200312021453) | Dec 2, 2003 | Completed: final sign-off Apr 2004 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | move (e) retail entrance door 3' into building from its orig. location to comply | $6,000 |
| [200311251156](https://www.permitgraph.org/p/200311251156) | Nov 25, 2003 | Completed: final sign-off Apr 2004 | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | t.i for a retail store. remove (e) non bearing wall, & contruct new non bearing wall for a back room | $75,000 |
| [M25665](https://www.permitgraph.org/p/M25665) | Nov 21, 2003 | Never finaled: issued Nov 2003, no final | [217 Sutter St](https://www.permitgraph.org/a/0293/002) |  | address assignment |  |
| [200205227159](https://www.permitgraph.org/p/200205227159) | May 22, 2002 | Completed: final sign-off May 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | to renew app#2001/01/18/259,2000/02/29/3035 & 2000/04/03/6175 for finalinspection. |  |
| [200205227154](https://www.permitgraph.org/p/200205227154) | May 22, 2002 | Completed: final sign-off May 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | renew pa#2000/01/18/255,2000/02/29/3034,2000/04/03/6148 for final insp. |  |
| [200205227157](https://www.permitgraph.org/p/200205227157) | May 22, 2002 | Completed: final sign-off May 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | to renew app#2000/11/14/5617,2001/02/22/2651 & 2001/12/05/4565 for final inspection. |  |
| [200203292688](https://www.permitgraph.org/p/200203292688) | Mar 29, 2002 | Expired or cancelled: expired Dec 2003 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [James Construction**See Note***](https://www.permitgraph.org/contractor/james-construction-see-note-493452) | install 2 handicap rstrooms one @ 2/f 1 @ 4/f mechanical wrk under sep permit | $30,000 |
| [200112054565](https://www.permitgraph.org/p/200112054565) | Dec 5, 2001 | Completed: final sign-off May 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195) | flor a/c unit in place on 3/f replace existing | $11,000 |
| [200105189535](https://www.permitgraph.org/p/200105189535) | May 18, 2001 | Expired or cancelled: expired Oct 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety modification-ground fl. mezzannie | $4,500 |
| [200105088596](https://www.permitgraph.org/p/200105088596) | May 8, 2001 | Completed: final sign-off Apr 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-3 3rd floor ls only | $10,000 |
| [200103295573](https://www.permitgraph.org/p/200103295573) | Mar 29, 2001 | Completed: final sign-off Apr 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 3rd floor, el & me | $150,000 |
| [200103083817](https://www.permitgraph.org/p/200103083817) | Mar 8, 2001 | Completed: final sign-off Apr 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 3rd floor, el, me | $300,000 |
| [200102222652](https://www.permitgraph.org/p/200102222652) | Feb 22, 2001 | Expired or cancelled: expired Sep 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | oti-1 basement el,me,sp | $20,000 |
| [200102222651](https://www.permitgraph.org/p/200102222651) | Feb 22, 2001 | Completed: final sign-off Jun 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) | oti-1 3rd fl el,me | $20,000 |
| [200011306836](https://www.permitgraph.org/p/200011306836) | Nov 30, 2000 | Expired or cancelled: expired Dec 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 basement el, me, l/s, sp | $200,000 |
| [200011145617](https://www.permitgraph.org/p/200011145617) | Nov 14, 2000 | Expired or cancelled: expired Dec 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 3rd floor el me | $100,000 |
| [200007064406](https://www.permitgraph.org/p/200007064406) | Jul 6, 2000 | Completed: final sign-off Jan 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1, me, el, mezzanine level | $50,000 |
| [200005301284](https://www.permitgraph.org/p/200005301284) | May 30, 2000 | Expired or cancelled: expired Jan 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety modifications 5th floor | $7,500 |
| [200005301287](https://www.permitgraph.org/p/200005301287) | May 30, 2000 | Expired or cancelled: expired Jan 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | life safety modifications on 6th fl | $7,500 |
| [200004036175](https://www.permitgraph.org/p/200004036175) | Apr 3, 2000 | Expired or cancelled: expired Oct 2000 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-2, el, me, 5th floor | $25,000 |
| [200004036178](https://www.permitgraph.org/p/200004036178) | Apr 3, 2000 | Expired or cancelled: expired Oct 2000 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-2, el, me, 6th floor | $25,000 |
| [200002293034](https://www.permitgraph.org/p/200002293034) | Feb 29, 2000 | Expired or cancelled: expired Mar 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | 071- 1 6th fl el me | $400,000 |
| [200002293035](https://www.permitgraph.org/p/200002293035) | Feb 29, 2000 | Expired or cancelled: expired Mar 2002 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 5th floor el me | $400,000 |
| [9912088](https://www.permitgraph.org/p/9912088) | Feb 28, 2000 | Expired or cancelled: expired Mar 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | addition of fire escape remove of (e)glazing | $50,000 |
| [M11687](https://www.permitgraph.org/p/M11687) | Feb 23, 2000 | Expired or cancelled: expired Jun 2000 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | street space use |  |
| [20000118255](https://www.permitgraph.org/p/20000118255) | Jan 18, 2000 | Expired or cancelled: expired Feb 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 6/f el me l/s | $200,000 |
| [20000118259](https://www.permitgraph.org/p/20000118259) | Jan 18, 2000 | Expired or cancelled: expired Feb 2001 | [153 Kearny St](https://www.permitgraph.org/a/0293/002) |  | oti-1 el me ls | $200,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Cci Com'l Constr & Improv**See 985808***](https://www.permitgraph.org/contractor/cci-com-l-constr-improv-see-985808-687025) (9), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (5), [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) (5), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (2), [James Construction**See Note***](https://www.permitgraph.org/contractor/james-construction-see-note-493452) (2), [Marina Mechanical Services](https://www.permitgraph.org/contractor/marina-mechanical-services-416198) (2), [Cal-Air Inc](https://www.permitgraph.org/contractor/cal-air-inc-137195), [Commercial Building Maintenance Dba Cbm](https://www.permitgraph.org/contractor/commercial-building-maintenance-dba-cbm-956375), [Everest Waterproofing & Restoration Inc.](https://www.permitgraph.org/contractor/everest-waterproofing-restoration-inc-695778), [Sign Designs Inc.](https://www.permitgraph.org/contractor/sign-designs-inc-268001)
- Architects: [Daniel Huntsmen](https://www.permitgraph.org/professional/daniel-huntsmen-C9255), [Julia Nelson](https://www.permitgraph.org/professional/julia-nelson-C31838), [Sign Designs, Inc.](https://www.permitgraph.org/professional/sign-designs-inc-268001)
- Engineers: [Vincent Aiello](https://www.permitgraph.org/professional/vincent-aiello-M27719)
- Authorized agents: [O+A, Inc O+A, Inc](https://www.permitgraph.org/professional/o-a-inc-o-a-inc-C17024)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0293/002.