# 111 Sutter St

Block 0292, lot 001. Page: https://www.permitgraph.org/a/0292/001

- City's use: Commercial Office
- Built: 1926
- Stories: 24
- Building: 286,182 sq ft
- Lot: 16,000 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202501158406](https://www.permitgraph.org/p/202501158406) | Jan 15, 2025 | In progress: issued Jan 2025 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | 9/f: fire alarm ti - adding (1) power supply, (4) smoke detectors, (2) speakers, (32) speaker-strobes and (3) relay modules to existing notifier nfs2-3030 fire alarm system. ref permit 202409130767 a… | $14,780 |
| [202411145009](https://www.permitgraph.org/p/202411145009) | Nov 14, 2024 | Completed: final sign-off Apr 2025 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 9th fl deferred mechanical & electrical for pa # 2024-0913-0767 | $176,000 |
| [202410173135](https://www.permitgraph.org/p/202410173135) | Oct 17, 2024 | Completed: final sign-off Mar 2025 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 9/f: relocate (57) and add (3) pendents. gc ti# 202409130767 | $15,000 |
| [202409130767](https://www.permitgraph.org/p/202409130767) | Sep 13, 2024 | Completed: final sign-off Apr 2025 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under… | $950,000 |
| [202307122002](https://www.permitgraph.org/p/202307122002) | Jul 12, 2023 | Never finaled: issued Jul 2023, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | 10/f: t.i. including new elevator lobby doors to replace existing. | $4,825 |
| [202211156531](https://www.permitgraph.org/p/202211156531) | Nov 15, 2022 | Completed: final sign-off May 2023 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm ti. 5 ceiling strobes, 14 ceiling speaker/strobes, 2 duct detectors and 2 relay modules to be added to provide proper coverage ref 2022-0804-9891. | $8,000 |
| [202211096195](https://www.permitgraph.org/p/202211096195) | Nov 9, 2022 | Completed: final sign-off Jun 2023 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 4th fl: mech and electrical for ti. new heat pumps, duct work, exhaust grills. no new fine dampers and fds. new power and signal devices. red pa#202208049891. | $75,000 |
| [202210073961](https://www.permitgraph.org/p/202210073961) | Oct 7, 2022 | Completed: final sign-off Oct 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 4/f: fire sprinklers, relocate 40 pendents, 37 uprights, 4 concealed pendents. ref t.i. pa 202208049891. | $42,525 |
| [202208049891](https://www.permitgraph.org/p/202208049891) | Aug 4, 2022 | Completed: final sign-off Jun 2023 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 4/f: demo/construction of nonload bearing partitions, new office doors, ceiling lighting & new millwork/finishes & restroom upgradesc | $800,000 |
| [202206136161](https://www.permitgraph.org/p/202206136161) | Jun 13, 2022 | Never finaled: issued Jun 2022, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 10th fl: fire alarm 2-way. voluntary addition of 1 call station and 1 2-way sign to be added in elevator lobby. 2-way backbone pa# 202006128638. | $1,000 |
| [202203301239](https://www.permitgraph.org/p/202203301239) | Mar 30, 2022 | Completed: final sign-off Apr 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 10th fl: add 2 & relocate 8 fire sprinklers per t.i.. ref pa# 202201246490 | $16,900 |
| [202201246490](https://www.permitgraph.org/p/202201246490) | Jan 24, 2022 | Completed: final sign-off Aug 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork. | $591,132 |
| [202111172597](https://www.permitgraph.org/p/202111172597) | Nov 17, 2021 | Completed: final sign-off Nov 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | electrical - power, lighting & signal title 24 |  |
| [202110261189](https://www.permitgraph.org/p/202110261189) | Oct 26, 2021 | Never finaled: issued Oct 2021, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 7/f: fire alarm addition to (e) system: 2 new ceiling speaker strobes and 1 new call station to provide proper coverage for area of work. ref pa 202006128638. | $2,000 |
| [202110200841](https://www.permitgraph.org/p/202110200841) | Oct 20, 2021 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 7th floor:lighting and power. ref app#202108166479 |  |
| [202110059785](https://www.permitgraph.org/p/202110059785) | Oct 5, 2021 | Completed: final sign-off Nov 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler's relocate 2 pendant sprinklers and add 1 upright on the 7th fl. t.i. 2021-0816-6479 | $1,000 |
| [202108166479](https://www.permitgraph.org/p/202108166479) | Aug 16, 2021 | Completed: final sign-off Sep 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | new non structural partitions, 2 new offices, 3 new fail safe card reads and mothers room modifications | $120,000 |
| [202107214827](https://www.permitgraph.org/p/202107214827) | Jul 21, 2021 | Completed: final sign-off Nov 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | floors 5/8/9: t.i. resrooms: removal of finsihes, light fixtures & restrooms, fixtures & accessories. maher n/a. | $550,000 |
| [202105110176](https://www.permitgraph.org/p/202105110176) | May 11, 2021 | Completed: final sign-off Aug 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | provide new piping to refeed sprinklers in existing storage space on 1st floor. total sprinklers in this project: 04. |  |
| [202103096199](https://www.permitgraph.org/p/202103096199) | Mar 9, 2021 | Completed: final sign-off Sep 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215) | replace high + low domestic booster pumps located in a subbasement. replace low + high gravity fed systems with 2 packaged skid pressure booster system. electrical - reuse & extend conduit & feeder t… | $350,000 |
| [202010096284](https://www.permitgraph.org/p/202010096284) | Oct 9, 2020 | Never finaled: issued Dec 2020, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Rainbow Waterproofing & Restor](https://www.permitgraph.org/contractor/rainbow-waterproofing-restor-148753) | re-roofing scope associated with pa 201909252682 filed at the request of dbi. |  |
| [202009285317](https://www.permitgraph.org/p/202009285317) | Sep 28, 2020 | Completed: final sign-off May 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | suite 110: installation of new fire sprinkler system. (nfpa 13; 35 heads & new pipe added to existing system) | $20,000 |
| [202006128638](https://www.permitgraph.org/p/202006128638) | Jun 12, 2020 | Completed: final sign-off Dec 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | install (n) 2-way emergency communication system infrastructure backbone will be added. all new eleator call stations will be added under future t.i. maher n/a. | $4,000 |
| [202002144498](https://www.permitgraph.org/p/202002144498) | Feb 14, 2020 | Completed: final sign-off Aug 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | suite 100 - fire alarm 3 wall speaker strobes, 1 ceiling speaker strobe, 1 ceiling strobe to be added to existing facu. | $3,000 |
| [202002144496](https://www.permitgraph.org/p/202002144496) | Feb 14, 2020 | Completed: final sign-off Apr 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm on 20th & 21st fl: 1 ceiling strobe will be added on 20th floor to existing facu. relocate 1 speaker on 21. | $1,000 |
| [202002063781](https://www.permitgraph.org/p/202002063781) | Feb 6, 2020 | Completed: final sign-off Jul 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 1st fl - t-24 mechanical & electrical for work under pa 2019-1206-8887 |  |
| [202002063710](https://www.permitgraph.org/p/202002063710) | Feb 6, 2020 | Completed: final sign-off Mar 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 20th and 21st floors: title 24 electrical n/a maher | $38,000 |
| [202001172149](https://www.permitgraph.org/p/202001172149) | Jan 17, 2020 | Completed: final sign-off Apr 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | suite 100: ref pa# 201912069887; fire sprinkler, relocate 22 pendent sprinklers and 1 concealed pendent sprinnkler in suite #100 n/a maher | $11,500 |
| [202001172165](https://www.permitgraph.org/p/202001172165) | Jan 17, 2020 | Completed: final sign-off Mar 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ref 201910174867, title 24 electrical | $50,000 |
| [201912230371](https://www.permitgraph.org/p/201912230371) | Dec 23, 2019 | Completed: final sign-off Oct 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 20th and 21st floors: revision to app#201911268169. t.i. including new non-structural partitions. finishes to match extg. mep, fire life safety and sprinkler under separate permit. | $165,000 |
| [201912068887](https://www.permitgraph.org/p/201912068887) | Dec 6, 2019 | Completed: final sign-off Jul 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | interior ti: non-structural interior partitions, new finishes & lighting. mep, sprinkler, life safety under separate permit. maher not req | $320,000 |
| [201912068873](https://www.permitgraph.org/p/201912068873) | Dec 6, 2019 | Never finaled: issued Dec 2019, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | demo. fire sprinklers. relocate 45 upright heads | $22,500 |
| [201911268169](https://www.permitgraph.org/p/201911268169) | Nov 26, 2019 | Completed: final sign-off Mar 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 20th and 21st fl tenant improvement including new non structural partitoins. finishes to matche e mep, fire life safety and sprinkler under sep permit | $165,000 |
| [201911207731](https://www.permitgraph.org/p/201911207731) | Nov 20, 2019 | Completed: final sign-off Feb 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 18th fire alarm 1 ceiling speaker/strobe, 2 duct detectors to be added to (e) facu n/a maher | $2,000 |
| [201910295818](https://www.permitgraph.org/p/201910295818) | Oct 29, 2019 | Completed: final sign-off Nov 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 18th floor: as built to app#2019091011236. delete 2 concealed pendent sprinklers in board room (room on the right side of the contract area). | $1,000 |
| [201910174757](https://www.permitgraph.org/p/201910174757) | Oct 17, 2019 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 6/f, 12/f,13/f: title 24 compliance, mech & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a. | $1,200,000 |
| [201910174867](https://www.permitgraph.org/p/201910174867) | Oct 17, 2019 | Completed: final sign-off Mar 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 19th flr. removal of non-structural partitions per ab-017. no ceiling work/demo under this permit until sprinkler plans are submitted. | $150,000 |
| [201910164570](https://www.permitgraph.org/p/201910164570) | Oct 16, 2019 | Completed: final sign-off Dec 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | ste 1300 - fire alarm 18 ceiling speaker strobes, 1 speaker wall strobe, 4 ceiling strobes to be added to existing facu. ref pa 2019-0805-7899 | $9,500 |
| [201910104100](https://www.permitgraph.org/p/201910104100) | Oct 10, 2019 | Completed: final sign-off Dec 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 12th fl, ste 1200 - 20 ceiling speaker strobes, 2 ceiling strobes to be added to existing facu. ref pa 2019-0805-7898 | $11,000 |
| [201910013189](https://www.permitgraph.org/p/201910013189) | Oct 1, 2019 | Completed: final sign-off Dec 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18 fl. mechaninical & electrical permit to suppport architectural pemit, install new wshps, relocate (e) wshps, demo (e) distribution to remodeled rooms. ref app#201908068008 | $75,000 |
| [201909252682](https://www.permitgraph.org/p/201909252682) | Sep 25, 2019 | Never finaled: issued Dec 2020, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Rainbow Waterproofing & Restor](https://www.permitgraph.org/contractor/rainbow-waterproofing-restor-148753) | historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of bldg enclosure, w/ intention of preserving the historic fabric of the bldg facades. | $1,500,000 |
| [201909131549](https://www.permitgraph.org/p/201909131549) | Sep 13, 2019 | Never finaled: issued Sep 2019, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th floor-turo suite 600: 10 ceiling speaker strobes to be added to extg facu. n/a for maher. ref app#201908057897 | $6,000 |
| [201909101136](https://www.permitgraph.org/p/201909101136) | Sep 10, 2019 | Completed: final sign-off Feb 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 8fire sprinklers relocate 8 pendent uprights, 1 upright sprinkler 18th flr ref 201908068008 | $4,500 |
| [201909101183](https://www.permitgraph.org/p/201909101183) | Sep 10, 2019 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ste 1200 - revision to pa 2019-0805-7898 convert phone room to mother's room. adding plumbing, millwork, new hardware and finishes | $30,000 |
| [201908219409](https://www.permitgraph.org/p/201908219409) | Aug 21, 2019 | Never finaled: issued Aug 2019, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers, relocate 9 pendents, 4 uprights on the 6th fl. relocate 37 pendents and 6 uprights on the 12th fl. relocate 40 pendents and 5 uprights on the 13th fl ref 201908057897 for the 6th fl… | $51,500 |
| [201908068008](https://www.permitgraph.org/p/201908068008) | Aug 6, 2019 | Completed: final sign-off Dec 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th flr. demo of (e) partitions and doors. new partitions and doors for offices and conference rooms | $485,000 |
| [201908057898](https://www.permitgraph.org/p/201908057898) | Aug 5, 2019 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | #1200- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. me… | $600,000 |
| [201908057899](https://www.permitgraph.org/p/201908057899) | Aug 5, 2019 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | #1300- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. me… | $600,000 |
| [201908057897](https://www.permitgraph.org/p/201908057897) | Aug 5, 2019 | Completed: final sign-off Jul 2022 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | #600- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep… | $400,000 |
| [201906274626](https://www.permitgraph.org/p/201906274626) | Jun 27, 2019 | Completed: final sign-off Nov 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 7th floor: add, relocate and remove fire sprinklers per t.i.: 27 add, 95 relocate and 14 remove. n/a for maher. ref app#201904248807 | $35,550 |
| [201906274625](https://www.permitgraph.org/p/201906274625) | Jun 27, 2019 | Completed: final sign-off Jul 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 3rd floor: add, relocate and remove fire sprinklers per t.i.: 16 add, 42 relocate. n/a for maher. ref app#201904248804 | $17,850 |
| [201906244202](https://www.permitgraph.org/p/201906244202) | Jun 24, 2019 | Completed: final sign-off Apr 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | spec suite 300 on 3rd and spec suite 700 on 7th flr electrical and title 24. ref pa's 201904248804 and 201904248807 |  |
| [201906244194](https://www.permitgraph.org/p/201906244194) | Jun 24, 2019 | Completed: final sign-off Sep 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 3rd flr fire alarm t.i. 12 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248804 | $6,000 |
| [201906244196](https://www.permitgraph.org/p/201906244196) | Jun 24, 2019 | Completed: final sign-off Mar 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 7th flr fire alarm t.i. 1 smoke detector and 27 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248807 | $14,000 |
| [201906173602](https://www.permitgraph.org/p/201906173602) | Jun 17, 2019 | Never finaled: issued Jun 2019, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 12/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit. curr… | $10,000 |
| [201906173603](https://www.permitgraph.org/p/201906173603) | Jun 17, 2019 | Never finaled: issued Jun 2019, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 13/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit.curre… | $10,000 |
| [201906173568](https://www.permitgraph.org/p/201906173568) | Jun 17, 2019 | Completed: final sign-off Apr 2021 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | suite 300 and 700- furnish and install two new water source heat pumps with ductwork, water supply and return condensate drains and thermostats. outside air fans, thermostatic valves on 20 steam radi… |  |
| [201904248804](https://www.permitgraph.org/p/201904248804) | Apr 24, 2019 | Completed: final sign-off Nov 2019 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ste 300 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defe… | $350,000 |
| [201904248807](https://www.permitgraph.org/p/201904248807) | Apr 24, 2019 | Completed: final sign-off Jan 2020 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ste 700 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defe… | $600 |
| [201810011853](https://www.permitgraph.org/p/201810011853) | Oct 1, 2018 | Expired or cancelled: cancelled Oct 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Phoenix Electric Co.](https://www.permitgraph.org/contractor/phoenix-electric-co-811031) | repair two 8 inch laterals (8 inch sewer) (8 inch storm drain), replace damaged pipes and wye fitting with new pipes and fitting. replace in kind at same location. | $10,000 |
| [201809261401](https://www.permitgraph.org/p/201809261401) | Sep 26, 2018 | Never finaled: issued Sep 2018, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm add a gsm dialer to fa system. n/a for maher. |  |
| [201805169215](https://www.permitgraph.org/p/201805169215) | May 16, 2018 | Completed: final sign-off Oct 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 9th fl: demising wall. ada toilet upgrades. no change in occupancy use or area. maher na; life safety, sprinklers under seperate permit | $1,640 |
| [201801037738](https://www.permitgraph.org/p/201801037738) | Jan 3, 2018 | Completed: final sign-off Feb 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 6th fl: fa ti: pyro comm will provide (1) remote power supply, (2) multi voltage relays, (11) ceiling mount speaker/strobes and (2) high candela ceiling mount speaker/strobes. maher na | $17,000 |
| [201712206972](https://www.permitgraph.org/p/201712206972) | Dec 20, 2017 | Completed: final sign-off Apr 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 6th flr: mech - add 1 water source heat pump for interior cooling - transfer 1 fan to it room - balance (e) restroom exhaust. electrical - partial scope office tenant retrofit-lighting, power & signa… | $200,000 |
| [201712085889](https://www.permitgraph.org/p/201712085889) | Dec 8, 2017 | Completed: final sign-off Jan 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 6/f #600- fire sprinkler only, relocate 23 pendents, add 3 pendents. t.i. pa#201711083458. n/a ordinance #155-13 | $6,500 |
| [201711103700](https://www.permitgraph.org/p/201711103700) | Nov 10, 2017 | Never finaled: issued Nov 2017, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 18th floor: fa ti to an existing building. pyro comm will provide (42) new devices and repair (5) existing devices. n/a maher | $15,000 |
| [201711093584](https://www.permitgraph.org/p/201711093584) | Nov 9, 2017 | Never finaled: issued Nov 2017, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th fl - electrical only. lighting, power & signal, wiring, lighting & controls. new subpanels & feeder. ref pa #201709158490. maher na | $70,000 |
| [201711083458](https://www.permitgraph.org/p/201711083458) | Nov 8, 2017 | Completed: final sign-off Apr 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | tenant improvemen on the 6th fl of 22 story building. consist of demo of interior partitions, doors, finishes, ceiling, lighting, mech, and constructtion of new wall and glazing configuration, ceilin… | $977,340 |
| [201710201823](https://www.permitgraph.org/p/201710201823) | Oct 20, 2017 | Completed: final sign-off Nov 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only. 2017-1017-1465 relocate 13 pendent, relocate 17 uprights for veritas (18th fl) | $7,500 |
| [201710171465](https://www.permitgraph.org/p/201710171465) | Oct 17, 2017 | Completed: final sign-off Aug 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th floor: mechanical work including 4 new water source heat pumps. ref#201709158490. n/a for maher | $10,000 |
| [201709229300](https://www.permitgraph.org/p/201709229300) | Sep 22, 2017 | Completed: final sign-off Oct 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 17/f- fire alarm t.i. add (2) duct detectors, (2) modules, (27) nac appliances connect to 9e) fire alarm system. t.i. pa#201708104455. n/a ordinance #155-13 | $13,000 |
| [201709188834](https://www.permitgraph.org/p/201709188834) | Sep 18, 2017 | Never finaled: issued Oct 2017, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Famand Inc Dba Indoor Environmental Serv](https://www.permitgraph.org/contractor/famand-inc-dba-indoor-environmental-serv-646794) | 17/f- mechanical work for (e) pa#201708104455, supply (2) water source heat pumps with all duct & piping, complete with osa connection & t-24 t-stat, 1 exhaust fan for it room. n/a ordinance #155-13 | $39,728 |
| [201709158368](https://www.permitgraph.org/p/201709158368) | Sep 15, 2017 | Completed: final sign-off Sep 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 14 uprights & add 5 uprights (19 total). for redbubble on the 17th fl. ref #201708104455. maher na | $4,750 |
| [201709158490](https://www.permitgraph.org/p/201709158490) | Sep 15, 2017 | Completed: final sign-off Aug 2018 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 18th fl - ti includes demo, new partitions, finishes & lighting. mep under separate permit | $650,000 |
| [201709148181](https://www.permitgraph.org/p/201709148181) | Sep 14, 2017 | Never finaled: issued Sep 2017, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 17/f: t24 electrical drawings: partial scope office t.i. retrifit: lighting, power and signal wiring, lighting & controls. ref t.i. 201708104455. | $210,000 |
| [201708104455](https://www.permitgraph.org/p/201708104455) | Aug 10, 2017 | Completed: final sign-off Nov 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | project consist of a ti on the 17th fl of a 22 story building. build out includes construction of new non-load bearing partitions, glazing, ceiling, power and data, millwork, new finishes. mep, life… | $850,000 |
| [201704103604](https://www.permitgraph.org/p/201704103604) | Apr 10, 2017 | Completed: final sign-off Jun 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | project consists of a t.i. of suite 1900 &1925 on a multi-tenant floor. build out consists of new wall and glazing, extg ceiling and system, mounted fixture and devices to remain typical throughtout… | $161,000 |
| [201704103606](https://www.permitgraph.org/p/201704103606) | Apr 10, 2017 | Completed: final sign-off Jun 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | 6/f: project consists of demo of existing partions, doors, electrical, plumbing, mill work, and finishes. tenant improvement, mechanical, electrical, life safety, and sprinkler modification under sep… | $65,000 |
| [201703272376](https://www.permitgraph.org/p/201703272376) | Mar 27, 2017 | Never finaled: issued Mar 2017, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler ti - convert 99 pendents to 99 uprights for future demo allowing removal of suspended ceilint on 6th floor - full floor. ti plans under separate permit. | $51,750 |
| [201611162825](https://www.permitgraph.org/p/201611162825) | Nov 16, 2016 | Never finaled: issued Nov 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) | title 24 lighting only. ref pa 2016-0804-4180. maher n/a | $100 |
| [M732407](https://www.permitgraph.org/p/M732407) | Oct 21, 2016 | Never finaled: issued Oct 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | street space & mta parking meter |  |
| [201609218321](https://www.permitgraph.org/p/201609218321) | Sep 21, 2016 | Never finaled: issued Sep 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | 17th floor: fire sprinkler permit. relocate 7 add one, and delete 1 pendent sprinklers.t.i. app#201608044180 n/a for maher | $1,948 |
| [201609218322](https://www.permitgraph.org/p/201609218322) | Sep 21, 2016 | Completed: final sign-off Oct 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | 5th floor: fire sprinkler permit. add 6 pendent sprinklers.t.i.#201608044182 n/a for maher | $3,153 |
| [201609157748](https://www.permitgraph.org/p/201609157748) | Sep 15, 2016 | Never finaled: issued Sep 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | tenant improvement project to 17th floor. addition of 8 fire alarm appliances to connect to existing fire alarm system ref pa 2016-0804-4180 | $5,000 |
| [201608044182](https://www.permitgraph.org/p/201608044182) | Aug 4, 2016 | Completed: final sign-off Jan 2017 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | 5th flr, suite 550: partial floor east side ti- new millwork, flooring, paint/finishes, power/communications outlets & sliding doors. no ceiling/lighting work, (e) to remain. no new partitions maher… | $44,000 |
| [201608044177](https://www.permitgraph.org/p/201608044177) | Aug 4, 2016 | Completed: final sign-off Nov 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 19th flr, suite 1900 & 1925 partial floor demo on west side: demo of (e) flooring, floor finishes & partitions. (e) grid system, mtd fixture & devices to remain, typ suite to remain unoccupied until… | $21,771 |
| [201608044180](https://www.permitgraph.org/p/201608044180) | Aug 4, 2016 | Never finaled: issued Aug 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 17th flr: ti- spec suite: new partitions, millwork, finishes. light fixtures & elec power & comm. maher na. separate ti permit incl mep required for future tenant. | $150,000 |
| [201605026319](https://www.permitgraph.org/p/201605026319) | May 2, 2016 | Completed: final sign-off May 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | fire sprinkler permit remove (e) arm overs and drops to provide coverage at exposed deck. 17th floor: relocate 84 pendent sprinklers. 18th floor: relocate 71 pendent sprinklers. ref pa 2016-0309-1640… | $27,460 |
| [201605026281](https://www.permitgraph.org/p/201605026281) | May 2, 2016 | Never finaled: issued May 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 17th and 18th floors: remove extg fire alarm devices as part of a demo project. extg core and shell devices to remain. future t.i. under seperate permit. remove 9 smoke detectors. 30 strobes, 25 spea… | $1,000 |
| [M684488](https://www.permitgraph.org/p/M684488) | Apr 27, 2016 | Never finaled: issued Apr 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | street space |  |
| [201603091640](https://www.permitgraph.org/p/201603091640) | Mar 9, 2016 | Completed: final sign-off Nov 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 17th & 18th floors: full floor interior demo, include partitions, lighting and power, finishes, ceiling. no structural demo. per ab-017 maher na | $160,000 |
| [201602169622](https://www.permitgraph.org/p/201602169622) | Feb 16, 2016 | Never finaled: issued Feb 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Garnett Signs Llc](https://www.permitgraph.org/contractor/garnett-signs-llc-995535) | (8) evacuation maps for floors 20-21 | $2,800 |
| [201601197298](https://www.permitgraph.org/p/201601197298) | Jan 19, 2016 | Never finaled: issued Jan 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th floor structural for "movable wall" on permit 2015-1109-2076. maher na |  |
| [201601157181](https://www.permitgraph.org/p/201601157181) | Jan 15, 2016 | Never finaled: issued Jan 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 5th floor #525 - lighting & power 7 signal, ref #2015-1125-3647. n/a maher ordinance | $15,000 |
| [201601116767](https://www.permitgraph.org/p/201601116767) | Jan 11, 2016 | Never finaled: issued Jan 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th floor: structural for 201511092076. n/a for maher | $20,000 |
| [201601076547](https://www.permitgraph.org/p/201601076547) | Jan 7, 2016 | Completed: final sign-off May 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 20/21st flrs: lighting & power- connecting power to new or relocated light fixtures, power outlets & tenant equipment, reference 201510210363; maher n/a | $500,000 |
| [201601076549](https://www.permitgraph.org/p/201601076549) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 20/21st flrs: provide structural support for moveable partition wall @20th flr as part of renovation. the moveable partition wall is suspended from supplemental steel below the 21st flr, ref. 2015102… | $40,000 |
| [201601066454](https://www.permitgraph.org/p/201601066454) | Jan 6, 2016 | Completed: final sign-off Jan 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | new fire alarm devices added to ti in an (e) building to include: (3) speaker/strobes (1) strobe. ref pa 2015-1125-3647. maher na | $1,500 |
| [201512165265](https://www.permitgraph.org/p/201512165265) | Dec 16, 2015 | Completed: final sign-off Apr 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate existing line relocate 4 pendents. maher na | $4,222 |
| [201512114859](https://www.permitgraph.org/p/201512114859) | Dec 11, 2015 | Completed: final sign-off Feb 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 20th and 21st floors: new fire alarm appliances added to a ti in an (e) building to include: (8) speaker/strobes, (6) strobes,(4) speakers. ref pa 2015-1021-0363. maher na | $9,500 |
| [201512114857](https://www.permitgraph.org/p/201512114857) | Dec 11, 2015 | Completed: final sign-off Jan 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 16th floor: new fire alarm appliances added to a ti in an (e) building to include: (16) speaker/strobes, (2) strobes. ref pa 2015-1109-2076. maher na | $6,430 |
| [201512044211](https://www.permitgraph.org/p/201512044211) | Dec 4, 2015 | Completed: final sign-off Jan 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | fire sprinkler ti delete 4 pendent sprinklers, delete 5 upright sprinklers, add 4 upright sprinklers. add 11 pendents. ref ti 2015-1109-2076 | $17,620 |
| [201512044159](https://www.permitgraph.org/p/201512044159) | Dec 4, 2015 | Never finaled: issued Dec 2015, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | mechanical/electrical for pa 2015-1109-2076. maher na | $441,868 |
| [201511253647](https://www.permitgraph.org/p/201511253647) | Nov 25, 2015 | Completed: final sign-off Feb 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | suite 525: interior ti includes demolition and new construction, new demising wall, electrical and plumbing mep and life safety/sprinkler under separate permit. maher n/a | $133,000 |
| [201511092076](https://www.permitgraph.org/p/201511092076) | Nov 9, 2015 | Completed: final sign-off Jul 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16/f -ti selective demo. build non-load bearing partitions etc: mep under separate permit (telocom room in a non-ab060 room); separate structural permit for movable partiton & fin/ceiling wall. previ… | $79,125 |
| [201510230670](https://www.permitgraph.org/p/201510230670) | Oct 23, 2015 | Completed: final sign-off Nov 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 22nd floor new fire alarm devices for a t.i, in an existing bldg to include: (2) speaker/strobe. ref pa #201509237750. n/a maher ordinance | $1,000 |
| [201510210363](https://www.permitgraph.org/p/201510210363) | Oct 21, 2015 | Completed: final sign-off May 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | new non-structural partitions, moified gyp bd ceilings and soffits, and new finishes throughout. note: mep, fire srpinkler, life-safety, and evac signage on deferred permits | $2,096,000 |
| [201510169896](https://www.permitgraph.org/p/201510169896) | Oct 16, 2015 | Never finaled: issued Oct 2015, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 16th floor - selective demo of non-load bearing partitions, millwork, light fixtures (e) ceiling grid & tile, doors, frames & side lights. ab-017. maher na. architectural and life safety deferred. | $51,380 |
| [201509237750](https://www.permitgraph.org/p/201509237750) | Sep 23, 2015 | Completed: final sign-off Nov 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | ti includes the demo of non-structural partitions. | $130,000 |
| [201507141455](https://www.permitgraph.org/p/201507141455) | Jul 14, 2015 | Never finaled: issued Jul 2015, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | suite #850- revision to pa# 2015-0522-6971 architectural drawings only, relocate lights. life safety deferred, if required. |  |
| [201507141470](https://www.permitgraph.org/p/201507141470) | Jul 14, 2015 | Completed: final sign-off Jul 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 8th floor: new fire alarm devices added to t.i. in an extg bldg to include 4 speaker/strobes and relocate one strobe. ref app#2015-0522-6971. n/a for the maher. | $3,000 |
| [201507101120](https://www.permitgraph.org/p/201507101120) | Jul 10, 2015 | Completed: final sign-off Jul 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | 8th floor: fire sprinkler t.i. add 5 fire sprinklers. ref app#201505226971 n/a for maher | $4,557 |
| [201507070791](https://www.permitgraph.org/p/201507070791) | Jul 7, 2015 | Never finaled: issued Jul 2015, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | mechanical drawings for project 2015056226971, 8th fl | $20,000 |
| [201506259957](https://www.permitgraph.org/p/201506259957) | Jun 25, 2015 | Completed: final sign-off Sep 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | suite 975: mechanical and elec work. life safety and fire sprinkler sep permit ref arch 2015-0518-6545. maher not req | $35,000 |
| [201506249793](https://www.permitgraph.org/p/201506249793) | Jun 24, 2015 | Never finaled: issued Jun 2015, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 9th flr: ste 975- new fir alarm appliances for tenant improvement in an existing building to include 2 speaker/strobes, 3 speakers, 1 strobe, pa 201505186545; maher n/a | $3,430 |
| [201506108655](https://www.permitgraph.org/p/201506108655) | Jun 10, 2015 | Completed: final sign-off Jul 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | suite #975: relocate 2 fire sprinklers per t.i. ref. aapl.# 2015.0518.6545. maher n/a. | $1,028 |
| [201505226971](https://www.permitgraph.org/p/201505226971) | May 22, 2015 | Completed: final sign-off Jan 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 8th flr/suite 850: ti- selective demo & construction of non load bearing partitions, new breakroom, millwork, reuse & minor relocation of (e) light fixtures, selective new office doors & frames, salv… | $258,320 |
| [201505186545](https://www.permitgraph.org/p/201505186545) | May 18, 2015 | Completed: final sign-off Sep 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | suite #975: interior tenant improvement including new conference room, office and finishes. mep, fire/life safety under separate permit. n/a for the maher. | $60,000 |
| [201409237074](https://www.permitgraph.org/p/201409237074) | Sep 23, 2014 | Completed: final sign-off Nov 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | new fire alarm devices added to tenant improvement to include(2) speaker/strobes. 9th floor. ref ti pa#2013-1202-3138. n/a maher ordinance. | $2,000 |
| [201409035331](https://www.permitgraph.org/p/201409035331) | Sep 3, 2014 | Never finaled: issued Sep 2014, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | suite 900: relocate 4 fire sprinklers for t.i. ref. appl 2014.0514.5738. maher n/a. | $2,056 |
| [201408224484](https://www.permitgraph.org/p/201408224484) | Aug 22, 2014 | Completed: final sign-off Jul 2016 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185) | evacuation maps - 11th flr (4), 10th flr (4); maher n/a | $2,400 |
| [201407141197](https://www.permitgraph.org/p/201407141197) | Jul 14, 2014 | Completed: final sign-off Aug 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | suite #350- add & relocate fire sprinklers per t.i. (1) add, (1) relocate. t.i. pa#201406279739. n/a to ordinance #155-13 | $1,028 |
| [201406279739](https://www.permitgraph.org/p/201406279739) | Jun 27, 2014 | Completed: final sign-off Aug 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Greene Builders Inc](https://www.permitgraph.org/contractor/greene-builders-inc-827515) | suite #350: add new demising partition to divide office into 2 suites. add new door to hall from suite 2. mep work to be submitted seperately. n/a for the maher ordinance #155-13 | $16,800 |
| [201406259360](https://www.permitgraph.org/p/201406259360) | Jun 25, 2014 | Never finaled: issued Jun 2014, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | electrical for tenant improvement ref 201312023138 | $6,000 |
| [201406168406](https://www.permitgraph.org/p/201406168406) | Jun 16, 2014 | Completed: final sign-off Oct 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 11th floor: mechanical and electrical work for t.i. ref app#201405145738. compliance with ord 155-13 not required | $25,000 |
| [201406128192](https://www.permitgraph.org/p/201406128192) | Jun 12, 2014 | Completed: final sign-off Sep 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 11th flr: remodel all outlined areas, consisting of 52 relocated pendants, 3 added pendants and 1 removed pendant, ti. 201405145738 ; compliance with ord 155-13 not required | $13,199 |
| [201406118156](https://www.permitgraph.org/p/201406118156) | Jun 11, 2014 | Completed: final sign-off Oct 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | (11th floor) revision to 2014-0514-5738 / ceiling detail. compliance with ordinance no 155-13 not required. |  |
| [201406107998](https://www.permitgraph.org/p/201406107998) | Jun 10, 2014 | Completed: final sign-off Sep 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 11th floor: new fire alarm devices added to tenant build out to include 4 modules, 4 pull station, 8 smoke detectors, 3 duct detectors, 17 speaker/strobes, 2 speakers, 2 strobes. ref app# 20140514573… | $8,600 |
| [201405155848](https://www.permitgraph.org/p/201405155848) | May 15, 2014 | Completed: final sign-off Oct 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 11th floor: interior demo only. t.i. will be under app#201405145738 per ab-017 space will remain unoccupied and disabled access will be review & approved under t.i. permit. | $10,000 |
| [201405145738](https://www.permitgraph.org/p/201405145738) | May 14, 2014 | Completed: final sign-off Oct 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | t.i. includes the demo of non-structural partitions & building new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety. work will be design-build and submitted sepe… | $899,028 |
| [201404254229](https://www.permitgraph.org/p/201404254229) | Apr 25, 2014 | Completed: final sign-off May 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | as built revisions indicating removal of (3) duct detectors, previous app# 201401297315 |  |
| [201404143175](https://www.permitgraph.org/p/201404143175) | Apr 14, 2014 | Never finaled: issued Apr 2014, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 10th floor:installation of railing for movable partition. partition not in scope of work, separate permit required. ref app#201312023137 for t.i. work. n/a for the maher ordinance #155-13 | $12,330 |
| [201401297315](https://www.permitgraph.org/p/201401297315) | Jan 29, 2014 | Completed: final sign-off May 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | new fire alarm devices added to protected premises. (7) relay modules, (8) duct smoke detectors, (17) speaker/strobes, (2)strobes. t.i. pa#2013-12-02-3137. compliance with ordinance #155-13 not requi… | $8,000 |
| [201401246996](https://www.permitgraph.org/p/201401246996) | Jan 24, 2014 | Completed: final sign-off Apr 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 10th floor: add, relocate , and remove fire spirnkler heads per t.i. 74 add, 10 relocate, and 1 eremoved. ref app#201312023137. n/a for maher ordinance #155-13 | $43,176 |
| [201312023138](https://www.permitgraph.org/p/201312023138) | Dec 2, 2013 | Completed: final sign-off Apr 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | tenant improvement on 9th floor to demo non-load bearing partitions and build non-load bearing partitions, glazing and finishes. mep & fire protection on seperate permit. | $67,500 |
| [201312023137](https://www.permitgraph.org/p/201312023137) | Dec 2, 2013 | Completed: final sign-off Oct 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit. | $2,135,000 |
| [201311192301](https://www.permitgraph.org/p/201311192301) | Nov 19, 2013 | Never finaled: issued Nov 2013, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 10th floor:demolition of non-structural partitions, doors millwork carpet, finishes on 10th floor. space to remain vacant under ab017 and all ada requirment will be addressed under future t.i. permit… | $56,000 |
| [201310230012](https://www.permitgraph.org/p/201310230012) | Oct 23, 2013 | Completed: final sign-off Nov 2013 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | revision and addendum to 201307031066: modification of existing tenant improvements to include new electrical scope and ceiling work. | $20,000 |
| [M420227](https://www.permitgraph.org/p/M420227) | Aug 23, 2013 | Never finaled: issued Aug 2013, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | street space |  |
| [201308144264](https://www.permitgraph.org/p/201308144264) | Aug 14, 2013 | Never finaled: issued Aug 2013, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 14th & 15th floor fire sprinkler - relocate 7 pendent sprinkler heads on the 14th floor. relcoate 1 pendent sprinkler head on the 15th floor. ref pa #2013.07.03.1064 & #2013.07.03.1066 | $4,120 |
| [201308124053](https://www.permitgraph.org/p/201308124053) | Aug 12, 2013 | Completed: final sign-off Aug 2013 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add new devices to new tenant build out on the 14th and 15th floor. ceiling speaker/strobes 11 wall strobe one. t.i. 15th floor app#201307031066 and 14th floor app#201307031064 | $9,000 |
| [201307031064](https://www.permitgraph.org/p/201307031064) | Jul 3, 2013 | Completed: final sign-off Aug 2013 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 1400: modification of exist tenant improvements to include selective demo and construction of non load bearing paritions, light fixture relocation and new including reswitching, new office door and f… | $105,590 |
| [201307031066](https://www.permitgraph.org/p/201307031066) | Jul 3, 2013 | Completed: final sign-off Feb 2014 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | #1500 -modify of (e) t.i. to include selective demolition & construction of non-load bearing partitions, relocate & new light fixtures including re-switching, new office doors & frames, salvage & reu… | $125,240 |
| [201212176390](https://www.permitgraph.org/p/201212176390) | Dec 17, 2012 | Completed: final sign-off Apr 2013 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm panel upgrade | $25,000 |
| [201212035295](https://www.permitgraph.org/p/201212035295) | Dec 3, 2012 | Completed: final sign-off Dec 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add new speaker/strobes to conference rooms, 8 total. bldg pa# 201208318725 | $6,000 |
| [201211154275](https://www.permitgraph.org/p/201211154275) | Nov 15, 2012 | Completed: final sign-off Jan 2015 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | interior demolition of existing tenant partitions, ceilings, finishes. removal of existing mezzanine & stair approx. 2,120 sq.ft. safing off, capping/ removal of electrical & plumbing complying with… | $27,600 |
| [201210111781](https://www.permitgraph.org/p/201210111781) | Oct 11, 2012 | Expired or cancelled: cancelled Jan 2026 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 1st floor-changing the (e) head end equipment as well as annunciator. all field devices to remain | $20,000 |
| [M352251](https://www.permitgraph.org/p/M352251) | Oct 10, 2012 | Never finaled: issued Oct 2012, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  |  |  |
| [201208318725](https://www.permitgraph.org/p/201208318725) | Aug 31, 2012 | Completed: final sign-off Jan 2013 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | t.i. to extg office. new partitions, electrical and relocate extg lighting for the conversion of an extg conference room into 3 new offices. | $5,000 |
| [201208238122](https://www.permitgraph.org/p/201208238122) | Aug 23, 2012 | Completed: final sign-off Sep 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 19th floor:selective demolition. addition of new partitions and associated finishes. minor modifications in toilet rooms to meet current codes. addition of new sliding door and hardware to match extg | $3,000 |
| [201204259062](https://www.permitgraph.org/p/201204259062) | Apr 25, 2012 | Never finaled: issued Apr 2012, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade. relocate sprinkler heads on the 12th floor. | $1,545 |
| [201204198673](https://www.permitgraph.org/p/201204198673) | Apr 19, 2012 | Never finaled: issued Apr 2012, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 12th floor: add 2 speaker/strobes to conference rooms, 2 strobes and 5 additional speakers to extg conference rooms. | $6,000 |
| [201204128138](https://www.permitgraph.org/p/201204128138) | Apr 12, 2012 | Completed: final sign-off Aug 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | modification of (e) tenant space and shall include selective demolition and construction of non-load bearing partitions, new light fixtures, new office doors & frames, salvage & reuse of existing int… | $52,560 |
| [201112281379](https://www.permitgraph.org/p/201112281379) | Dec 28, 2011 | Completed: final sign-off Mar 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 4th floor-fire sprinkler system upgrade-relocate 43 upright sprinkler heads & relocate 10 pendent sprinkler heads | $28,840 |
| [201112080342](https://www.permitgraph.org/p/201112080342) | Dec 8, 2011 | Completed: final sign-off Dec 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 15th floor - add new speaker/strobe to new conference room. relocate (1) speaker/strobe to opposite wall. | $4,000 |
| [201111098606](https://www.permitgraph.org/p/201111098606) | Nov 9, 2011 | Completed: final sign-off Feb 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 4th floor:speculative tenant improvement. remove cieling in open area. patch and repair gyp bd partions adjacent to open areas. reverse accessible stall door swing at men's and women's restrooms. mep… | $75,000 |
| [201111018045](https://www.permitgraph.org/p/201111018045) | Nov 1, 2011 | Completed: final sign-off Nov 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 13th floor - add two new speaker/strobes to enw conference rooms, add one new strobe for open office area. | $4,000 |
| [201110287890](https://www.permitgraph.org/p/201110287890) | Oct 28, 2011 | Completed: final sign-off Sep 2012 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | remodel grd fl main entr to provide core compaint access entry. wk incl demo (e) storefront to install new accessible entrance door & corridor access to (e) accessible elevator lobby. assoc elec,ligh… | $45,000 |
| [201110257567](https://www.permitgraph.org/p/201110257567) | Oct 25, 2011 | Completed: final sign-off Nov 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade, relocate 4 upright heads on the 13th floor. upgrade branch line restraints. | $3,000 |
| [201110136722](https://www.permitgraph.org/p/201110136722) | Oct 13, 2011 | Completed: final sign-off Nov 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 13th floor-t.i. selective demolition & construction of non-load bearing walls, new light fixtures & electrical outlets | $52,560 |
| [201109164862](https://www.permitgraph.org/p/201109164862) | Sep 16, 2011 | Never finaled: issued Sep 2011, no final | [41 Montgomery St](https://www.permitgraph.org/a/0292/001) | [Tracy Sign Inc](https://www.permitgraph.org/contractor/tracy-sign-inc-907315) | erect new sign: electric, wall, single faced. | $700 |
| [201107130136](https://www.permitgraph.org/p/201107130136) | Jul 13, 2011 | Never finaled: issued Jul 2011, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 5th floor-relocate & remove fire sprinkler heads per t.i-add 1, relocate 3, remove 1 | $2,000 |
| [201107119851](https://www.permitgraph.org/p/201107119851) | Jul 11, 2011 | Completed: final sign-off Jul 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. 1 relocate. spec suite 5th floor. | $515 |
| [201106208484](https://www.permitgraph.org/p/201106208484) | Jun 20, 2011 | Completed: final sign-off Dec 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 15th floor - convert 1 large office to 2 small offices: new door, patcj, repair finishes, new floor core, recircuit (e) lighting. | $25,000 |
| [201106137975](https://www.permitgraph.org/p/201106137975) | Jun 13, 2011 | Completed: final sign-off Oct 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | add 2 speakers/strobes tpo new corridor on the 10th floor. add relay module for access control override | $3,500 |
| [201106067497](https://www.permitgraph.org/p/201106067497) | Jun 6, 2011 | Expired or cancelled: cancelled Jan 2020 | [41 Montgomery St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | rev.to pa# 2011.03.23.2661 and 2011.06.01.7187 (corrct address from 45 to 41). revise celining syst(combine exposed clg w suspended clg. revise elec plans n locs of equipments. install type 2 mech.ho… |  |
| [201106067449](https://www.permitgraph.org/p/201106067449) | Jun 6, 2011 | Completed: final sign-off Oct 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvements existing fire sprinkler system, 3 add sprkr, 1 removed sprkr, 11 relocated sprkr, 10th flr | $2,800 |
| [201106027329](https://www.permitgraph.org/p/201106027329) | Jun 2, 2011 | Completed: final sign-off Jul 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | suite #525-add small breakeroom, counter with sink & upper/lower cabinets, convert 2 small office to 1 larger office. relocate 1 light | $25,000 |
| [201106027332](https://www.permitgraph.org/p/201106027332) | Jun 2, 2011 | Completed: final sign-off Aug 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | suite #550-suite expansion includes new offices, power/signal, lighting relocated only, doors & partition | $30,000 |
| [201106017187](https://www.permitgraph.org/p/201106017187) | Jun 1, 2011 | Completed: final sign-off Jul 2011 | [41 Montgomery St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | to correct the address for pa#201103232661. the address should be 41 montgomery street. for administrative & documentation purpose only. |  |
| [201105246714](https://www.permitgraph.org/p/201105246714) | May 24, 2011 | Completed: final sign-off Aug 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 1st floor - replace existing strobe with new strobes & speaker/stribe coverage in prep area & open area. add smoke detedtor above existing power supply. t.i. pa #201103232661. | $6,000 |
| [201105125911](https://www.permitgraph.org/p/201105125911) | May 12, 2011 | Never finaled: issued May 2011, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | ground floor fire sprinkler system upgrade - relocate 15 pendent sprinkler heads, relocate 10 uprights. | $12,500 |
| [201105055469](https://www.permitgraph.org/p/201105055469) | May 5, 2011 | Completed: final sign-off Oct 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 10th floor-new doors at corridor, 3 new offices & associated power/data, replacement of casework where shown, new ceiling elements. sprinklers under separate permits- above and below corridor ceiling… | $92,500 |
| [201104144046](https://www.permitgraph.org/p/201104144046) | Apr 14, 2011 | Completed: final sign-off May 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixture | $5,000 |
| [201103232661](https://www.permitgraph.org/p/201103232661) | Mar 23, 2011 | Completed: final sign-off Jul 2011 | [45 Montgomery St](https://www.permitgraph.org/a/0292/001) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | tenant improvement for new restaurant(no cooking)re-condition extg electrical, mechanical,& plmg for new restaurant. construct new walls 34"high min. 48" high max | $180,000 |
| [201103182408](https://www.permitgraph.org/p/201103182408) | Mar 18, 2011 | Never finaled: issued Apr 2011, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | office ti on 15th fl. demolition of (e) gyp bd partition and glass doors. patch and repair and paint demo scars . | $5,000 |
| [201102099913](https://www.permitgraph.org/p/201102099913) | Feb 9, 2011 | Completed: final sign-off Jul 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti on 11th floor. 2 strobes, 15 candella, 1 storbe, 30 cdfl and 3 ceiling speakers | $6,800 |
| [201101188533](https://www.permitgraph.org/p/201101188533) | Jan 18, 2011 | Completed: final sign-off Feb 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 11th floor - raise 2-sprinkler line, relocate 2-head, plug 2-heads & add 2-heads. | $1,993 |
| [201012277409](https://www.permitgraph.org/p/201012277409) | Dec 27, 2010 | Completed: final sign-off Jun 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | office ti on 11th floor. interior alterations and new finishes. mep and ls under separate permit | $200,000 |
| [201012176945](https://www.permitgraph.org/p/201012176945) | Dec 17, 2010 | Never finaled: issued Dec 2010, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | demolition of ground floor space . no occupants!, no structural, per ab-017. | $22,000 |
| [201012025947](https://www.permitgraph.org/p/201012025947) | Dec 2, 2010 | Never finaled: issued Dec 2010, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802) | provide (4) new lighting fixture & relocate (5) lighting fixture for a 1,432 square feet. 14th floor office space. | $5,000 |
| [201012015842](https://www.permitgraph.org/p/201012015842) | Dec 1, 2010 | Completed: final sign-off Oct 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 3 speaker strobes and 2 strobes to existing fire alarm system | $1,900 |
| [201011305811](https://www.permitgraph.org/p/201011305811) | Nov 30, 2010 | Completed: final sign-off Oct 2011 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 14th floor-tenant improvement includes minor demolition & build back on new meeting rooms (2) & folding partitions- sprinkler and fire alarm, electrical/lighting separate permit. meeting rooms b occu… | $70,000 |
| [201007227198](https://www.permitgraph.org/p/201007227198) | Jul 22, 2010 | Completed: final sign-off Aug 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately. | $10,000 |
| [201007227200](https://www.permitgraph.org/p/201007227200) | Jul 22, 2010 | Completed: final sign-off Aug 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 15th floor - demolition of one wall in open office space. patch and finish. | $5,000 |
| [201005202849](https://www.permitgraph.org/p/201005202849) | May 20, 2010 | Completed: final sign-off Aug 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i.; total relocates-8, total relocate & changeout-2, total heads-10. | $2,000 |
| [201005182677](https://www.permitgraph.org/p/201005182677) | May 18, 2010 | Completed: final sign-off Sep 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 16th floor - add 1-speak/strobe & 3-strobes to (e) fire alarm system. relocate 7-(e) devices. | $2,100 |
| [201003309230](https://www.permitgraph.org/p/201003309230) | Mar 30, 2010 | Completed: final sign-off Aug 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Howard S. Wright Constructors Lp](https://www.permitgraph.org/contractor/howard-s-wright-constructors-lp-860938) | minor interior tenant improvement. new interior partitions, millwork & minor electrical, mechanical is (e). demolition of (e) walls. | $95,000 |
| [201003238766](https://www.permitgraph.org/p/201003238766) | Mar 23, 2010 | Completed: final sign-off May 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Horizon Retail Construction Inc](https://www.permitgraph.org/contractor/horizon-retail-construction-inc-676686) | 13th floor tenant improvement - restore to previous floor plan to build partition walls, electrical outlets, switches & lights, no plumbing work. srpinkler & fire alarm revisions under separate appl. | $50,000 |
| [201003198613](https://www.permitgraph.org/p/201003198613) | Mar 19, 2010 | Completed: final sign-off Apr 2010 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Horizon Retail Construction Inc](https://www.permitgraph.org/contractor/horizon-retail-construction-inc-676686) | 13th floor. demolition only. tenant improvements under separate permit. ab-017. | $10,000 |
| [200905188605](https://www.permitgraph.org/p/200905188605) | May 18, 2009 | Never finaled: issued May 2009, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | to obtain final inspection for work approved under app #200708078971. all work is complete. |  |
| [200810083658](https://www.permitgraph.org/p/200810083658) | Oct 8, 2008 | Completed: final sign-off Dec 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i., relocated heads-9, added heads-4, total heads-13 | $2,800 |
| [200810033302](https://www.permitgraph.org/p/200810033302) | Oct 3, 2008 | Completed: final sign-off Dec 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802) | 9th floor install (6) new 6x4 & 2 x4 light fixtures; relcoate (6) existing 2x4; install power to server room, install base feed power to t.i. | $1,200 |
| [200809252585](https://www.permitgraph.org/p/200809252585) | Sep 25, 2008 | Completed: final sign-off Dec 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 6 speakers and 7 strobes to existing fire alarm system | $3,750 |
| [200808219732](https://www.permitgraph.org/p/200808219732) | Aug 21, 2008 | Completed: final sign-off Dec 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | at 9th fl: t.i. minor wall demolition, new paint, new carpet, relocate some lighting, new low partion walls per plan. work at 9th floor level only. | $100,000 |
| [M124844](https://www.permitgraph.org/p/M124844) | Jul 3, 2008 | Never finaled: issued Jul 2008, no final | [111 Sutter St](https://www.permitgraph.org/a/0292/001) |  | street space |  |
| [200803257884](https://www.permitgraph.org/p/200803257884) | Mar 25, 2008 | Completed: final sign-off Apr 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 1 smoke detector to existing fire alarm system. | $2,100 |
| [200802134737](https://www.permitgraph.org/p/200802134737) | Feb 13, 2008 | Completed: final sign-off Apr 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 3rd floor: tenant improvements - build new equipment and wiring closet. add supplemental elec. and voice data foropen office workstations. | $22,000 |
| [200712281444](https://www.permitgraph.org/p/200712281444) | Dec 28, 2007 | Completed: final sign-off Feb 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | sprinkler work to be done on stairwell from ground floor, basement, ground , 23rd and 24th floors and only. relocate 1 sprikler on the ground floor and 1 on the 23rd floor. add 14 spriklers on the gr… | $36,000 |
| [200710094778](https://www.permitgraph.org/p/200710094778) | Oct 9, 2007 | Completed: final sign-off Feb 2008 | [111 Sutter St](https://www.permitgraph.org/a/0292/001) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 1st and ground - add two dual monitor mofules for new sprinkler risers monitoring. | $3,200 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (37), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (33), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (16), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) (12), [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) (11), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (9), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (8), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (8), [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) (8), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (6), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (5), [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) (5), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (4), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (3), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (3), [Capitol Electric Const](https://www.permitgraph.org/contractor/capitol-electric-const-391802) (2), [Horizon Retail Construction Inc](https://www.permitgraph.org/contractor/horizon-retail-construction-inc-676686) (2), [Rainbow Waterproofing & Restor](https://www.permitgraph.org/contractor/rainbow-waterproofing-restor-148753) (2), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565), [Emcor Services/Mesa Energy Systems Inc](https://www.permitgraph.org/contractor/emcor-services-mesa-energy-systems-inc-611215), [Famand Inc Dba Indoor Environmental Serv](https://www.permitgraph.org/contractor/famand-inc-dba-indoor-environmental-serv-646794), [Garnett Signs Llc](https://www.permitgraph.org/contractor/garnett-signs-llc-995535), [Greene Builders Inc](https://www.permitgraph.org/contractor/greene-builders-inc-827515), [Howard S. Wright Constructors Lp](https://www.permitgraph.org/contractor/howard-s-wright-constructors-lp-860938), [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179), [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877), [Phoenix Electric Co.](https://www.permitgraph.org/contractor/phoenix-electric-co-811031), [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216), [Specialized Graphics Inc](https://www.permitgraph.org/contractor/specialized-graphics-inc-967185), [Tracy Sign Inc](https://www.permitgraph.org/contractor/tracy-sign-inc-907315), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639)
- Architects: [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609) (8), [Riley E. Bunn](https://www.permitgraph.org/professional/riley-e-bunn-C37378) (5), [Bartley Mcclelland](https://www.permitgraph.org/professional/bartley-mcclelland-C21696) (4), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618) (4), [Robin Mcdonald](https://www.permitgraph.org/professional/robin-mcdonald-C15157) (4), [Joseph A. Remling](https://www.permitgraph.org/professional/joseph-a-remling-C34144) (3), [Ashley G. Miller](https://www.permitgraph.org/professional/ashley-g-miller-C27238) (2), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223) (2), [Aston Pereira & Assoc.](https://www.permitgraph.org/professional/aston-pereira-assoc-C12756), [Hga](https://www.permitgraph.org/professional/hga-C32725), [Hok Hok](https://www.permitgraph.org/professional/hok-hok-C10181), [Julie Momchilov Johnson](https://www.permitgraph.org/professional/julie-momchilov-johnson-21696), [Lawrence Smith](https://www.permitgraph.org/professional/lawrence-smith-C26160), [Mark Horton](https://www.permitgraph.org/professional/mark-horton-C18065), [Naveen Mathur](https://www.permitgraph.org/professional/naveen-mathur-C30108), [Quin Wichmann](https://www.permitgraph.org/professional/quin-wichmann-C28957), [Rene Garcia Calara](https://www.permitgraph.org/professional/rene-garcia-calara-C30788), [Scott Clement](https://www.permitgraph.org/professional/scott-clement-C36455)
- Engineers: [Jesus Cabello](https://www.permitgraph.org/professional/jesus-cabello-E9278) (3), [Alan Wright](https://www.permitgraph.org/professional/alan-wright-M32044) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378) (2), [Stephen Shafeer](https://www.permitgraph.org/professional/stephen-shafeer-E21097) (2), [Bill Cain](https://www.permitgraph.org/professional/bill-cain-32044), [Brian Featherston](https://www.permitgraph.org/professional/brian-featherston-M32323), [Brian Provencal](https://www.permitgraph.org/professional/brian-provencal-M30446), [C & N Engineers C & N Engineers](https://www.permitgraph.org/professional/c-n-engineers-c-n-engineers-9279), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-2835), [Elisabeth M Allen](https://www.permitgraph.org/professional/elisabeth-m-allen-E17659), [Juan A. Aranjo](https://www.permitgraph.org/professional/juan-a-aranjo-E16537), [Julian White](https://www.permitgraph.org/professional/julian-white-E18350), [Shummon Engineering](https://www.permitgraph.org/professional/shummon-engineering-M31323), [Timothy Mcpartland](https://www.permitgraph.org/professional/timothy-mcpartland-3826), [Xuong Quach](https://www.permitgraph.org/professional/xuong-quach-M31981)
- Authorized agents: [Tony Ferretti](https://www.permitgraph.org/professional/tony-ferretti-927862)
- Designers: [Stanley H Lew](https://www.permitgraph.org/professional/stanley-h-lew-C29609) (2), [Peter Mchugh](https://www.permitgraph.org/professional/peter-mchugh-392967)
- Lessees: [Jesus Cabello](https://www.permitgraph.org/professional/jesus-cabello-E9278)
- Pmt consultant/expediters: [Janey Chan](https://www.permitgraph.org/professional/janey-chan-S6081)

---