# 225 Bush St

Block 0289, lot 007. Page: https://www.permitgraph.org/a/0289/007

- City's use: Commercial Office
- Built: 1948
- Stories: 22
- Lot: 9,944 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202608046005](https://www.permitgraph.org/p/202608046005) | Aug 4, 2026 | In progress: issued Aug 2026 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices… | $400,000 |
| [202502251005](https://www.permitgraph.org/p/202502251005) | Feb 25, 2025 | Completed: final sign-off Mar 2025 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 15th fl - add 9 fire sprinklers in phone booths per ti; 16th fl - add 7 fire sprinklers in phone booths per ref pa 202501097987 | $9,938 |
| [202105180550](https://www.permitgraph.org/p/202105180550) | May 18, 2021 | Never finaled: issued Jun 2021, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install (8) smoke detectors, (9) control relays | $11,220 |
| [202101142744](https://www.permitgraph.org/p/202101142744) | Jan 14, 2021 | Completed: final sign-off Mar 2021 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install (23) wall mounted speaker strobes, (1) wall mounted strobe, (4) ceiling mounted speaker strobes. ti reference #: 2020-1202-0073. | $18,480 |
| [202010196857](https://www.permitgraph.org/p/202010196857) | Oct 19, 2020 | Completed: final sign-off Dec 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6/f: rev to pa 202002053583 to remove previously approved scope including millwork, food equipment & finishes. |  |
| [202007170424](https://www.permitgraph.org/p/202007170424) | Jul 17, 2020 | Completed: final sign-off Dec 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire life safety: install (1)monitor module. reference t.i. #202002053583. | $660 |
| [202006299329](https://www.permitgraph.org/p/202006299329) | Jun 29, 2020 | Never finaled: issued Jul 2020, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Edison Fire Extinguisher Company Inc](https://www.permitgraph.org/contractor/edison-fire-extinguisher-company-inc-569185) | new fire suppression system. hood and duct | $2,800 |
| [202003046205](https://www.permitgraph.org/p/202003046205) | Mar 4, 2020 | Completed: final sign-off Jun 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | consturction of wall/new service counter to service copy/open office area. additoin of water lines and power distribution on sep trade permits. no mep. all work is in e tenant space | $10,000 |
| [202002265436](https://www.permitgraph.org/p/202002265436) | Feb 26, 2020 | Completed: final sign-off May 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th fl - revision to pa 2020-0122-2497 to change new door to glazing at room 628. |  |
| [202002053583](https://www.permitgraph.org/p/202002053583) | Feb 5, 2020 | Completed: final sign-off Dec 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | new kitchen equipment placement and finishes. m.e. p under separate permit | $150,000 |
| [202001222497](https://www.permitgraph.org/p/202001222497) | Jan 22, 2020 | Completed: final sign-off May 2020 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | modification of ti on the 6th fl to include selective demolition of non-load bearing partitions & millwork construction of glazing, millwork & finishes. | $25,000 |
| [201908067957](https://www.permitgraph.org/p/201908067957) | Aug 6, 2019 | Completed: final sign-off Aug 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm for 15th floor ti | $1,320 |
| [201907165942](https://www.permitgraph.org/p/201907165942) | Jul 16, 2019 | Completed: final sign-off Jul 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 13th flr - fire alarm install 13 ceiling speaker strobes. ref 201905241646 & 201905019377 | $8,600 |
| [201907055168](https://www.permitgraph.org/p/201907055168) | Jul 5, 2019 | Completed: final sign-off Jul 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm ti on 13th & 14th fl: install 87 ceiling speaker strobes, install 4 wall strobes, install 36 duct detectors, install 2 control relays, install 1 call stations. | $85,800 |
| [201906113041](https://www.permitgraph.org/p/201906113041) | Jun 11, 2019 | Completed: final sign-off Nov 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm ti - convert building's existing floor of alarm evacuation method to a relocation method; upgrade building's survivability to have 2 hour pathway protection where required | $10,000 |
| [201905301950](https://www.permitgraph.org/p/201905301950) | May 30, 2019 | Completed: final sign-off Aug 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 18th fl - fire alarm ti install 2 ceiling mount speaker strobes; relocate 1 wall mount strobe, remove 2 wall mount strobe. ref pa 2019-0326-6263 | $1,200 |
| [201905231470](https://www.permitgraph.org/p/201905231470) | May 23, 2019 | Expired or cancelled: cancelled Jun 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | as built ref 201902213487 - show revised location of "s" door holder & smk det |  |
| [201904238646](https://www.permitgraph.org/p/201904238646) | Apr 23, 2019 | Completed: final sign-off May 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | fire sprinkler ti suite 1840 relocate one head ref 201803266263 | $2,195 |
| [201904016762](https://www.permitgraph.org/p/201904016762) | Apr 1, 2019 | Completed: final sign-off Apr 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | fire sprinkler tenant improvement relocate 4 and add 2 pendent sprinklers - 6 heads total ref pa 2019-0208-2443 | $2,900 |
| [201903135085](https://www.permitgraph.org/p/201903135085) | Mar 13, 2019 | Completed: final sign-off Mar 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 3rd flr, fire alarm tenant improvement. install 2 ceiling speaker-strobes. ref t.i 201812188582 | $1,320 |
| [201902213487](https://www.permitgraph.org/p/201902213487) | Feb 21, 2019 | Completed: final sign-off Jun 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 15th fl = fire alarm improvement install 45 ceiling speaker strobes, install 7 ceiling strobes, 2 duct detectors, 2 smoke detectors, 4 control relays, 1 call stations, 1 booster panel. ref pa 2018-12… | $40,300 |
| [201902142914](https://www.permitgraph.org/p/201902142914) | Feb 14, 2019 | Completed: final sign-off Apr 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 15th flr. fire sprinkler permit relcate 56, add 29 and delete 14 sprinklers on the 15th fl ref 201812117965 | $28,000 |
| [201812208824](https://www.permitgraph.org/p/201812208824) | Dec 20, 2018 | Completed: final sign-off Feb 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 2nd fl - as built ref pa 2018-1207-7691, revise layout to reflect accurate field layout. remove installation of (1) duct detector for hvac unit fc-24 |  |
| [201812148330](https://www.permitgraph.org/p/201812148330) | Dec 14, 2018 | Completed: final sign-off Jan 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler - replacing a back flow in 225 bush basement | $1,000 |
| [201812117965](https://www.permitgraph.org/p/201812117965) | Dec 11, 2018 | Completed: final sign-off Aug 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | ti on 15th fl: demo & construction of new non-load bearing partitions, doors, millwork, glazing, finishes, & mep systems. life safety & fire alarms. | $2,612,874 |
| [201812077691](https://www.permitgraph.org/p/201812077691) | Dec 7, 2018 | Completed: final sign-off Feb 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 2nd flr - fire alarm t.i. install 11 ceiling mount speakers/strobes, 1 ceiling mount strobe, 6 weatherproof ceiling mount strobes, 6 duct detectors w/ sampling tubes, 2 control relays. ref t.i 201802… | $15,600 |
| [201810122993](https://www.permitgraph.org/p/201810122993) | Oct 12, 2018 | Completed: final sign-off Nov 2018 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 16th flr - revision to 201612124728 - install 19 ceiling mount speaker/strobes. 35 control realys, 35 duct det w/sampling tubes, 2 smk det w/base | $2,500 |
| [201810092609](https://www.permitgraph.org/p/201810092609) | Oct 9, 2018 | Completed: final sign-off Oct 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | replacement of (e) fire pump at pump room | $60,000 |
| [201809190812](https://www.permitgraph.org/p/201809190812) | Sep 19, 2018 | Completed: final sign-off Nov 2018 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 16th floor: revision to app#201612124728 to redesign 5000 sq ft for architectural, mech, and electrical. life safety deferred. | $100,000 |
| [201806050971](https://www.permitgraph.org/p/201806050971) | Jun 5, 2018 | Never finaled: issued Jun 2018, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 2/f: fa ti install 10 celiling mount strobes; 3 2all mount speaker strobes, 33 ceiling mount speaker strobes; 7 smoke detectos w/bases; 8 duct detectors w/sampling tube; 8 control relay modules; 1 bo… | $35,000 |
| [201804237052](https://www.permitgraph.org/p/201804237052) | Apr 23, 2018 | Never finaled: issued Apr 2018, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd floor: fire sprinkler only: relocate 67 pendents and 23 uprights for 2nd floor remodel . ref app#201802161481 | $22,500 |
| [201804025241](https://www.permitgraph.org/p/201804025241) | Apr 2, 2018 | Completed: final sign-off Jul 2018 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd floor remodel: fire sprinkler only. relocate 66 pendents, relocate 20 uprights. n/a for maher pa#201802161481 | $21,500 |
| [201803052799](https://www.permitgraph.org/p/201803052799) | Mar 5, 2018 | Never finaled: issued Dec 2018, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | to erect an electric single faced sign. | $5,000 |
| [201803052797](https://www.permitgraph.org/p/201803052797) | Mar 5, 2018 | Never finaled: issued Dec 2018, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | to erect two non-electric single faced sign. | $5,000 |
| [201802161481](https://www.permitgraph.org/p/201802161481) | Feb 16, 2018 | Completed: final sign-off Feb 2019 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | arch/mech ti on 2nd floor non-structural demo, (n) non-structral partitions, doors, electrical, finishes, millwork. no change in occupancy, use or area. electrical, plumbing , life safety under sep.… | $1,523,262 |
| [201801037752](https://www.permitgraph.org/p/201801037752) | Jan 3, 2018 | Completed: final sign-off Mar 2018 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd flr - fire sprinkler only; relocate 231 uprights heads - spec suite | $57,750 |
| [201710262376](https://www.permitgraph.org/p/201710262376) | Oct 26, 2017 | Completed: final sign-off Nov 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | suite 400: fire alarm t.i. to install 1 ceiling mount speaker strobe and install 1 ceiling mount speaker. ref app#201709198993 | $1,000 |
| [201710252151](https://www.permitgraph.org/p/201710252151) | Oct 25, 2017 | Completed: final sign-off Nov 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | add sprinklers to sr floor (btwn 18/19 floors). as built submittal for f/s pa#201705045661. |  |
| [201710252145](https://www.permitgraph.org/p/201710252145) | Oct 25, 2017 | Completed: final sign-off Nov 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | voluntary upgrade of sprinkler system to remedy unsprinklered areas on 1st, 5th, 15th fl 18 sprinlkers total. maher n/a. | $18,000 |
| [201710050548](https://www.permitgraph.org/p/201710050548) | Oct 5, 2017 | Completed: final sign-off Dec 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | voluntary retrofit of sprinkler system in 3rd floor mechanical rooms/penthouse. extend (e) sprinkler system to cover these areas. | $43,000 |
| [201709077257](https://www.permitgraph.org/p/201709077257) | Sep 7, 2017 | Completed: final sign-off Dec 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | b & 1/f: fire alarm t.i. install 5 dual monitor modules. ref. t.i. #201706058377. | $2,500 |
| [201707101305](https://www.permitgraph.org/p/201707101305) | Jul 10, 2017 | Completed: final sign-off Sep 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | electrical work restroom upgrade and elevator lobby ref 201704032986 | $5,000 |
| [201706159508](https://www.permitgraph.org/p/201706159508) | Jun 15, 2017 | Never finaled: issued Jun 2017, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 14/f- fire alarm tenant improvement to pa#2017-0510-6170, remove (1) ceiling mount speaker strobe, relocate (1) ceiling mount speaker strobe. | $1,000 |
| [201706068519](https://www.permitgraph.org/p/201706068519) | Jun 6, 2017 | Never finaled: issued Jun 2017, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | fire alarm ti install 2 ceiling mount strobes, install 4 ceiling mount speaker-strobes. ref pa 2017-0403-2986 | $3,000 |
| [201706058377](https://www.permitgraph.org/p/201706058377) | Jun 5, 2017 | Never finaled: issued Jul 2017, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | installation of fire sprinkler system in the following areas. uppder garage, lower garage, mechanical room, chiller and pump room. total heads 537 | $300,000 |
| [201706028242](https://www.permitgraph.org/p/201706028242) | Jun 2, 2017 | Never finaled: issued Jun 2017, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 14th floor fire sprinkler only. relocate 13 pendents; relocate 2 uprights for uthium. ref #201705106170. | $3,750 |
| [201705106170](https://www.permitgraph.org/p/201705106170) | May 10, 2017 | Completed: final sign-off Sep 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 14th fl:interior tenant improvement to include non-load bearing partitions. mep & life safety under separate permit | $144,144 |
| [201705045661](https://www.permitgraph.org/p/201705045661) | May 4, 2017 | Never finaled: issued Jul 2017, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | installation of new sprinkler in sr floor (storage floor) new sprinkler heads = 272 full floor between floors 18-19. | $64,000 |
| [201703080936](https://www.permitgraph.org/p/201703080936) | Mar 8, 2017 | Completed: final sign-off Nov 2018 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 16th floor - evac maps | $2,700 |
| [201701278095](https://www.permitgraph.org/p/201701278095) | Jan 27, 2017 | Completed: final sign-off Mar 2017 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 16th flr: fire sprinlkers ref 201612124728: re;locate 21 pendent, add 2, relocate 2 upright add 1. remove for acxiom 26 heads | $6,500 |
| [201604195150](https://www.permitgraph.org/p/201604195150) | Apr 19, 2016 | Completed: final sign-off Jun 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Balch Petroleum Contractors & Builders](https://www.permitgraph.org/contractor/balch-petroleum-contractors-builders-396575) | replacement of fill port for fire pump diesel tank. no work to bldg exterior. | $8,000 |
| [201604043796](https://www.permitgraph.org/p/201604043796) | Apr 4, 2016 | Never finaled: issued Apr 2016, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 17th floor: fire sprinklers ref ti 2016 0311 1809: relocate 4 pendents, relocate 6 uprights and add 2 maher na | $6,300 |
| [201603313650](https://www.permitgraph.org/p/201603313650) | Mar 31, 2016 | Never finaled: issued Mar 2016, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 17th floor: as built delete installation of 1 speaker strobe, delete relocation of 1 speaker strobe. ref app#201603212633 | $800 |
| [201603212633](https://www.permitgraph.org/p/201603212633) | Mar 21, 2016 | Completed: final sign-off Apr 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 17th floor, fire alarm ti, relocate 2 ceiling mount speaker-strobes, install 3 ceiling mount speaker/strobes, ref pa 2015-0423-4464 | $2,000 |
| [201603111809](https://www.permitgraph.org/p/201603111809) | Mar 11, 2016 | Completed: final sign-off May 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 17th flr: revision to pa 201504234464 to reconfigure layout and mech/elec equipment locations. | $50,000 |
| [201602119339](https://www.permitgraph.org/p/201602119339) | Feb 11, 2016 | Never finaled: issued Feb 2016, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical work for ti, ref pa 2016-0107-6528 & 2015-0924-7934 | $1,000 |
| [201601227692](https://www.permitgraph.org/p/201601227692) | Jan 22, 2016 | Completed: final sign-off Mar 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 14 pendents & relocate 9 uprights for twitch 6th floor. reference ti 2015.0924.7934 | $11,500 |
| [201601076528](https://www.permitgraph.org/p/201601076528) | Jan 7, 2016 | Completed: final sign-off Apr 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revision to 201509247934 to keep existing partitions, new sound rated wall. demo existing glazing and provide alternate f glazing & provide alternate f glazing. |  |
| [201512285988](https://www.permitgraph.org/p/201512285988) | Dec 28, 2015 | Completed: final sign-off Jan 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 6th floor: fire alarm t.i. install 10 ceiling mount speaker-strobes. as builts include turnstyle shall release upon alarm at exit doors from lobby. t.i. #201509046154 | $5,000 |
| [201512114830](https://www.permitgraph.org/p/201512114830) | Dec 11, 2015 | Never finaled: issued Dec 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 12th floor: fire alarm t.i. install one wall mount strobes. install 24 ceiling mount speaker strobes, install 2 smoke detectors, and 1 relay module. t.i. #201509046154. | $11,000 |
| [201512044193](https://www.permitgraph.org/p/201512044193) | Dec 4, 2015 | Completed: final sign-off Jan 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | evacuation plan on 12/f. 6 signs | $2,700 |
| [201512034063](https://www.permitgraph.org/p/201512034063) | Dec 3, 2015 | Never finaled: issued Dec 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical work for ti on the 12th floor. ref pa 2015-0904-6154 | $240,000 |
| [201511203182](https://www.permitgraph.org/p/201511203182) | Nov 20, 2015 | Expired or cancelled: cancelled Jan 2026 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | new non rated partitions, new double door. no change in occupancy, use, or area. mep, l/s, sprinkler deferred | $4,081 |
| [201511122388](https://www.permitgraph.org/p/201511122388) | Nov 12, 2015 | Completed: final sign-off Jan 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm t.i., install 10 ceiling mount speaker/strobes. t.i. pa#201509247934. | $4,000 |
| [201511021371](https://www.permitgraph.org/p/201511021371) | Nov 2, 2015 | Completed: final sign-off Dec 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 13 pendents, delete 3 pendents for switch 6th floor. ref pa 2015-0924-7934 | $6,500 |
| [201511021369](https://www.permitgraph.org/p/201511021369) | Nov 2, 2015 | Completed: final sign-off Dec 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only - relocate 3 pendents; add 1 pendent, relocate 3 uprights; add 3 uprights, total 10 heads for radius 12th floor. reference ti 2015.0904.6154 | $5,000 |
| [201510190139](https://www.permitgraph.org/p/201510190139) | Oct 19, 2015 | Never finaled: issued Oct 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th floor: mech & elec work only ti - ref pa 2015 0924 7934. fire protection under sep permit | $40,000 |
| [201509247934](https://www.permitgraph.org/p/201509247934) | Sep 24, 2015 | Completed: final sign-off Apr 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th floor: ti- of (e) office, selective demo and new partitions, doors, ceiling - no structural work. mep/fire/life safety under sep permit. | $600,000 |
| [201509046154](https://www.permitgraph.org/p/201509046154) | Sep 4, 2015 | Completed: final sign-off Mar 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 12th floor: t.i. to include new partitions, glazing, doors, and finishes. mep, sprinklers and fire alarm under separate permit. | $750,000 |
| [201508265381](https://www.permitgraph.org/p/201508265381) | Aug 26, 2015 | Completed: final sign-off Sep 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 8th floor:fire alarm t.i. install 18 ceiling mount speaker-strobes, install 27 wall mount speaker-strobes, install 1 booster panel, install 13 duct detectors, install 12 smoke detectors, install 17 r… | $38,400 |
| [201508204875](https://www.permitgraph.org/p/201508204875) | Aug 20, 2015 | Completed: final sign-off Jul 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 4 fire alarm control unit on 1st and 15th floor. (2 on first floor and 2 on 15th floor) | $20,000 |
| [201508204805](https://www.permitgraph.org/p/201508204805) | Aug 20, 2015 | Never finaled: issued Aug 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | install 17th floor evacuation plan. | $2,400 |
| [201508174382](https://www.permitgraph.org/p/201508174382) | Aug 17, 2015 | Never finaled: issued Aug 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th flr: mechanical and electrical work for tenant improvement on the 8th flr, ref. arch. 2015-0128-6935. & ref sprinkler/pre-app system 2015-0327-2041. | $420,000 |
| [201507313031](https://www.permitgraph.org/p/201507313031) | Jul 31, 2015 | Never finaled: issued Jul 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | install 6 evacuation plan signs on 8th floor. | $3,050 |
| [201507201969](https://www.permitgraph.org/p/201507201969) | Jul 20, 2015 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 17th fl - ref arch tenant improvement #2015-0423-4464. install fire alarm devices for tenant improvement. (58) ceiling speaker-strodes, (2) wall speaker-strobes, (8) smoke detectors, (16) duct detect… | $43,300 |
| [201507161694](https://www.permitgraph.org/p/201507161694) | Jul 16, 2015 | Never finaled: issued Jul 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Eco Bay Services Inc.](https://www.permitgraph.org/contractor/eco-bay-services-inc-912328) | 2nd floor - non-structural demo only, no (n) work per ab-017. | $99,000 |
| [201506229510](https://www.permitgraph.org/p/201506229510) | Jun 22, 2015 | Completed: final sign-off Jul 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 17th floor: fire sprinkler only. relocate 184 heads, add24 head, remove 23 heads. total 208 sprinkler heads for "acxiom" ref app#201504234464 | $104,000 |
| [201506017622](https://www.permitgraph.org/p/201506017622) | Jun 1, 2015 | Never finaled: issued Jul 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | clarification to pa# 2015-0109-5337 and 2015-0128-6935 to remove requirement for full floor smoke detection associated with delayed egress. additional manufacture info & response ot code ref. 2013 cb… |  |
| [201505196714](https://www.permitgraph.org/p/201505196714) | May 19, 2015 | Completed: final sign-off Jun 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 3rd flr: install 1 booster panel. 12 ceiling mount speaker-storbes, 10 control realy modules, 10 duct detectors, remove and replace 1 pull station. t.i. 201504022598 | $13,600 |
| [201505065535](https://www.permitgraph.org/p/201505065535) | May 6, 2015 | Completed: final sign-off Sep 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 9th floor: fire alarm t.i. install 31 ceiling mount speaker-strobes, install 20 wall mount speaker-strobes, install 1 booster panel, install 15 duct detecters, install 15 smoke detectors with bases,… | $35,600 |
| [201504234464](https://www.permitgraph.org/p/201504234464) | Apr 23, 2015 | Completed: final sign-off May 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 17th floor: t.i. to demo and construct non-structural partition, doors/frames, hardwar, millwork, ceiling,finishes, mechanical, electrical and plumbing. f/a,sprinkler under separate permit | $2,213,499 |
| [201504214223](https://www.permitgraph.org/p/201504214223) | Apr 21, 2015 | Completed: final sign-off May 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. : add 2, relocate 45. total 47 . ref app#201504022598 | $24,187 |
| [201503272041](https://www.permitgraph.org/p/201503272041) | Mar 27, 2015 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 8th flr: fire sprinkler only- revision to 201503110478, 3 sheets with pre action detail. | $1,000 |
| [201503251849](https://www.permitgraph.org/p/201503251849) | Mar 25, 2015 | Completed: final sign-off Sep 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289) | 8th floor: install a pre-action detection system in server room. sprinkler permit #2015.0327.2041. | $12,915 |
| [201503201396](https://www.permitgraph.org/p/201503201396) | Mar 20, 2015 | Never finaled: issued Apr 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical and electrical for t.i. to include new fcu's exaust. new lighting. ref app#201501095377 | $15,000 |
| [201503110478](https://www.permitgraph.org/p/201503110478) | Mar 11, 2015 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | add 47 heads (sprinklers) for twitch (8th floor). | $23,500 |
| [201503110480](https://www.permitgraph.org/p/201503110480) | Mar 11, 2015 | Completed: final sign-off Apr 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only. ref bpa# 2015-0109-5337. add 71 pendant and 12 upright sprinkler for twitch 9th floor. | $42,000 |
| [201502239086](https://www.permitgraph.org/p/201502239086) | Feb 23, 2015 | Never finaled: issued Feb 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | as built - fire alarm t.i. relocate smoke detector to ceiling beam. |  |
| [201502027227](https://www.permitgraph.org/p/201502027227) | Feb 2, 2015 | Never finaled: issued Feb 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st floor & mezzanine fire alarm t.i. - install 2 booster panel, 23 speaker/strobes, 1 ceiling mount strobe, 11 duct detectors, 11 remote annunicator alarm led, 2 control relay, 3 mini monitor module… | $22,000 |
| [201501297039](https://www.permitgraph.org/p/201501297039) | Jan 29, 2015 | Never finaled: issued Mar 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 1st/2nd flrs: t.i. revision to pa 201409156316 for starbucks cafe and minor interior redesign of retail space for target store on 1st and 2nd flr. | $5,000 |
| [201501286935](https://www.permitgraph.org/p/201501286935) | Jan 28, 2015 | Never finaled: issued Mar 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor t.i. for office work includes (n) partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits. | $1,000,000 |
| [201501095337](https://www.permitgraph.org/p/201501095337) | Jan 9, 2015 | Never finaled: issued Jan 2015, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9th flr tenant interior improvement consisting of new partitions, glazing doors ceilings lighting and electrical fixures. no structural. no exterior work. mep deferred submittal. | $1,000,000 |
| [201501054900](https://www.permitgraph.org/p/201501054900) | Jan 5, 2015 | Completed: final sign-off Jul 2016 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | sprinklers ti for target on 1 and mezz.- 1st fl add 68 sprinkler and relocate 44 sprinkler , mezzanine add 77 sprinklers ref 201409156316 | $97,146 |
| [201412224227](https://www.permitgraph.org/p/201412224227) | Dec 22, 2014 | Completed: final sign-off Jan 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 7th floor: fire sprinkler t.i. under bpa#2014-0602-7289. relocate/change 8 heads, add 1 head. | $4,632 |
| [201411262571](https://www.permitgraph.org/p/201411262571) | Nov 26, 2014 | Expired or cancelled: cancelled Jan 2026 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | barrier removal only, upgrade toilet rooms on 17th floor for accessibility only. | $75,000 |
| [201411252458](https://www.permitgraph.org/p/201411252458) | Nov 25, 2014 | Completed: final sign-off Feb 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to app#201406138324 and 201406249315. revised floor plan. it storage area, finishes, glazing and light fixtures and associated mep revisions. | $32,000 |
| [201411060932](https://www.permitgraph.org/p/201411060932) | Nov 6, 2014 | Completed: final sign-off Jan 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | revise pa#201406279800 to reconfigure 1 hr. occupancy seperation and location of fire smoke dampers due to existing duct configuration. |  |
| [201411050801](https://www.permitgraph.org/p/201411050801) | Nov 5, 2014 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [The Whiting-Turner Contracting Company](https://www.permitgraph.org/contractor/the-whiting-turner-contracting-company-311107) | 1st and 2nd level: scope includes storage stock shelving. | $100,000 |
| [201410280132](https://www.permitgraph.org/p/201410280132) | Oct 28, 2014 | Never finaled: issued Oct 2014, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 5th floor.evacuation plan | $2,695 |
| [201410280120](https://www.permitgraph.org/p/201410280120) | Oct 28, 2014 | Never finaled: issued Oct 2014, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 5th floor: fire alarm t.i. remove and replace 1 booster panel, install 4 wall mount speaker-strobes, install 34 ceiling mount speaker-strobes, install 16 duct detectors, install 15 control relay modu… | $28,400 |
| [201409156316](https://www.permitgraph.org/p/201409156316) | Sep 15, 2014 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [The Whiting-Turner Contracting Company](https://www.permitgraph.org/contractor/the-whiting-turner-contracting-company-311107) | archtiectural work is limited to minor demo and repair/replacement of non-original finishes, new mep & accessible restrooms on 1/f & 2/f. sprinklers & fire alarm under separate permits. | $1,600,000 |
| [201409085673](https://www.permitgraph.org/p/201409085673) | Sep 8, 2014 | Never finaled: issued Sep 2014, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 15th floor:revision to app#201406259362 to enclose private office 1521 with new door, addition of glazing in extg wall. |  |
| [201408123604](https://www.permitgraph.org/p/201408123604) | Aug 12, 2014 | Completed: final sign-off Sep 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | provide 7th floor evacuation plan. | $2,800 |
| [201408053049](https://www.permitgraph.org/p/201408053049) | Aug 5, 2014 | Never finaled: issued Aug 2014, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 16th floor install 1 booster panel, install 37 ceiling mount speaker-strobes, install 3 duct detectors, install 3 remote annunciator alarm led, install 1 monitor module, install 4 control relay modul… | $19,600 |
| [201407221777](https://www.permitgraph.org/p/201407221777) | Jul 22, 2014 | Expired or cancelled: cancelled Jan 2026 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 3rd floor - non structural demolistion of walls, doors, finishes. no accessibility per ab-017. no change is occupancy, use, area. | $45,000 |
| [201407151272](https://www.permitgraph.org/p/201407151272) | Jul 15, 2014 | Completed: final sign-off Aug 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 7th floor fire sprinkler for t.i. - relocated 23 pendent heads, added 2 pendent heads, relocate 36 upright heads. total 61 heads. ref #201406138324 | $31,392 |
| [201407100932](https://www.permitgraph.org/p/201407100932) | Jul 10, 2014 | Completed: final sign-off Aug 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 7th floor - remove 1 wall mount speaker-strobe. remove 3 wall mount strobe. install 14 ceiling mount speakers-strobes. | $7,200 |
| [201406279800](https://www.permitgraph.org/p/201406279800) | Jun 27, 2014 | Completed: final sign-off Nov 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | interior non structural ti on 5th floor. new partitions, power, lighting hvac. demo pa done under 201403170923. sprinkler and fire alarm under separate permit | $1,300,000 |
| [201406259362](https://www.permitgraph.org/p/201406259362) | Jun 25, 2014 | Completed: final sign-off Oct 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 15th floor:tenant improvement of southwest corner of 15th fl to add new meeting rooms and low acoustic wall and new lighting. fire and mech under sep permit | $20,000 |
| [201406249315](https://www.permitgraph.org/p/201406249315) | Jun 24, 2014 | Completed: final sign-off Feb 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 7th floor -work associated w/approved pa #2014/0613/8324 - existing hvac distribution to be modified to serve new space plan. (1) new vav box is being added. no new fsds are being added. | $84,578 |
| [201406138324](https://www.permitgraph.org/p/201406138324) | Jun 13, 2014 | Completed: final sign-off Feb 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 7th flr -minor alterations to an existing 26,000 (gross) s.f. tenant improvement for nitro pdf. alterations include new offices, meeting rooms, finish & upgrades. mechanical, electrical, life safety… | $329,000 |
| [201406118146](https://www.permitgraph.org/p/201406118146) | Jun 11, 2014 | Completed: final sign-off Aug 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | ste 700. electrical work associated with 201406027289. existing distribution modified to serve new space plan. 2 new vav boxes being added, 1 new fan coil unit, 1 new transfer fan added. no new fsds… | $380,000 |
| [201406037387](https://www.permitgraph.org/p/201406037387) | Jun 3, 2014 | Never finaled: issued Jun 2014, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 14th floor - electrical /lighting for tenant improvement. ref #2014.0522.6487 | $4,000 |
| [201406027289](https://www.permitgraph.org/p/201406027289) | Jun 2, 2014 | Completed: final sign-off Jan 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 7th floor approx 8325 teant improvement project. construction of meeting rooms, offices, employee break room. mech, electrical work to be submitted under separate permit. life safety sep. permits | $510,000 |
| [201405226487](https://www.permitgraph.org/p/201405226487) | May 22, 2014 | Completed: final sign-off Jun 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | remodel southeast corner of the 14th fl to add new storage room and low acoustic wall. remove glazing and door from conference room. | $65,000 |
| [201404042475](https://www.permitgraph.org/p/201404042475) | Apr 4, 2014 | Completed: final sign-off Dec 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Eco Bay Services Inc.](https://www.permitgraph.org/contractor/eco-bay-services-inc-912328) | non-structural demolition only, no dated construction to be demolished, no build back, work per ab-017 | $25,000 |
| [201403312012](https://www.permitgraph.org/p/201403312012) | Mar 31, 2014 | Completed: final sign-off Dec 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 5/f: barrier removal. upgrade toilet rooms to full compliance only. new and relocated accessories and partitons. add ambulatory stall at mens. no change occupancy, use, area, or water demand. | $35,000 |
| [201311131764](https://www.permitgraph.org/p/201311131764) | Nov 13, 2013 | Completed: final sign-off Dec 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355. | $25,000 |
| [201311010901](https://www.permitgraph.org/p/201311010901) | Nov 1, 2013 | Completed: final sign-off Nov 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 13th floor: relocate 22 pendent sprinkler heads on the 13th floor. relocate 16 upright sprinkler, upgrade end of line bracing. ti pa# 201310038355 | $19,570 |
| [201310038355](https://www.permitgraph.org/p/201310038355) | Oct 3, 2013 | Completed: final sign-off Dec 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | interior t.i improvement on the 13th fl to include new breakroom & office etc. new ada compliant restroom core is addded in addition to (e) ada compliant restrooms to remain. | $1,336,000 |
| [201308285505](https://www.permitgraph.org/p/201308285505) | Aug 28, 2013 | Never finaled: issued Aug 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 6th floor-install 54 ceiling mount speakers/strobes, 11 smoke detector with base, 3 control relay modules, 1 booster power supply, 1 pull station & 1 monitor module | $28,000 |
| [201308204745](https://www.permitgraph.org/p/201308204745) | Aug 20, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | evacution maps for 225 bush street 6th floor | $1,800 |
| [201307313190](https://www.permitgraph.org/p/201307313190) | Jul 31, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th floor-revision to pa# 2013-0528-7976-remove idf room #656 & 654 |  |
| [201307222422](https://www.permitgraph.org/p/201307222422) | Jul 22, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th floor-mechanical & electrical permit for t.i pa# 2013-0528-7976 | $335,000 |
| [201306119123](https://www.permitgraph.org/p/201306119123) | Jun 11, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 6th floor fire sprinkler system existing tenant improvements - 114 new sprinklers, ref pa #2013.03.13.2160 | $57,000 |
| [201305157002](https://www.permitgraph.org/p/201305157002) | May 15, 2013 | Never finaled: issued May 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | evacuation map plan 10th, 14, and 15th floor. | $5,400 |
| [201305146846](https://www.permitgraph.org/p/201305146846) | May 14, 2013 | Completed: final sign-off Jun 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st floor-install 1 speaker/strobe & relocate 1 pull station | $1,500 |
| [201305106632](https://www.permitgraph.org/p/201305106632) | May 10, 2013 | Completed: final sign-off Jun 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 15th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0124-8696 | $420,000 |
| [201305106628](https://www.permitgraph.org/p/201305106628) | May 10, 2013 | Completed: final sign-off Jun 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 14th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0115-8001 | $420,000 |
| [201305106659](https://www.permitgraph.org/p/201305106659) | May 10, 2013 | Completed: final sign-off May 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 89 speaker-strobes, 16 smoke detectors,1 duct detector,6 monitor modules,5 control modules. ti on 14th floor ref app#201301158001 and ti on 15 floor: app#201301248696 | $40,000 |
| [201304295694](https://www.permitgraph.org/p/201304295694) | Apr 29, 2013 | Completed: final sign-off Jul 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 10th floor fire alarm system - install 41 speaker-strobes, 1 booster panel, 6 smoke detectors, 1 control relay. ref t.i. pa #2013.02.27.1062 | $20,000 |
| [201304225090](https://www.permitgraph.org/p/201304225090) | Apr 22, 2013 | Never finaled: issued May 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10th floor:revision to permit app#201302271062 to change decorative finish at hallway #129 |  |
| [201304184855](https://www.permitgraph.org/p/201304184855) | Apr 18, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 10th floor-relocate 90 pendent sprinkler heads, relocate 144 upright heads. end of line restraints & earthquake bracing | $120,510 |
| [201304164624](https://www.permitgraph.org/p/201304164624) | Apr 16, 2013 | Completed: final sign-off Jun 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 49 pendent sprinkler heads on the 14/f, relocate 24 uprights sprinklers on 14/f. relocate 70 pendent sprinklers heads on 15/f, add 2 uprights. t.i. #201301158001 (14/f) & 201301248696 (15/f) | $75,190 |
| [201304124393](https://www.permitgraph.org/p/201304124393) | Apr 12, 2013 | Completed: final sign-off Jan 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062 | $75,000 |
| [201304084024](https://www.permitgraph.org/p/201304084024) | Apr 8, 2013 | Completed: final sign-off Jan 2015 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263) | suite 120 - update to (e) coffee shop with new ownership. | $25,000 |
| [201303202579](https://www.permitgraph.org/p/201303202579) | Mar 20, 2013 | Never finaled: issued Mar 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | install novec 1230 fire suppression system, test & check 100% of system devices and system operation, perform pipe pressure test and pipe puff test per nfpa 2001, perform room integrity test per nfpa… | $23,150 |
| [201303132160](https://www.permitgraph.org/p/201303132160) | Mar 13, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | new fire sprinkler system, 110 new sprinklers | $55,000 |
| [201302271062](https://www.permitgraph.org/p/201302271062) | Feb 27, 2013 | Completed: final sign-off Dec 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | approx 26000 sf ti improvement on 10th fl. improvements include addition of offices, meeting rooms, break area, pantries & unisex restroom. finish upgrades include floor, wall & ceilings. mep & fls i… | $1,500,000 |
| [201302089792](https://www.permitgraph.org/p/201302089792) | Feb 8, 2013 | Never finaled: issued Feb 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 19th fl evacuation maps | $2,000 |
| [201302069574](https://www.permitgraph.org/p/201302069574) | Feb 6, 2013 | Never finaled: issued Feb 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | install hood & duct fire system in kitchen hood (fire suppression only). ab-17 for future t.i. | $70,000 |
| [201301309063](https://www.permitgraph.org/p/201301309063) | Jan 30, 2013 | Completed: final sign-off Feb 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler system upgrade; relocate 197 upright sprinklers on the 15th floor. add 136 pendent sprinklers on the 14th fl & add 48 pendent sprinklers. install end of line & earthquake bracing on th… | $196,215 |
| [201301248696](https://www.permitgraph.org/p/201301248696) | Jan 24, 2013 | Completed: final sign-off Jul 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 15th floor-ti office space-new lighting, finishes, non load bearing walls. no change of use. upgrade restrooms. m.e.p under seperate permit. t-24 calcu under seperate permit. mech. under seperate per… | $1,612,960 |
| [201301238554](https://www.permitgraph.org/p/201301238554) | Jan 23, 2013 | Completed: final sign-off Jan 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 11th floor-fire sprinkler system upgrade-relocate 5 pendent sprinklers, relocate 4 uprights | $4,635 |
| [201301188281](https://www.permitgraph.org/p/201301188281) | Jan 18, 2013 | Completed: final sign-off Feb 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725 | $60,000 |
| [201301188267](https://www.permitgraph.org/p/201301188267) | Jan 18, 2013 | Never finaled: issued Jan 2013, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | ti pa#2012-12-21-6725 install 4 speaker strobe. remove & replace 2 speakers w/ speaker strobes. relocate 1 strobe. | $2,500 |
| [201301157980](https://www.permitgraph.org/p/201301157980) | Jan 15, 2013 | Completed: final sign-off Oct 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 6th floor-removal of non structural, non load bearing partitions, doors, ceilings, lighting, mechanical & electrical. ab-017 | $50,000 |
| [201301158001](https://www.permitgraph.org/p/201301158001) | Jan 15, 2013 | Completed: final sign-off Jul 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 14th floor-interior tenant improvement-new non load bearing walls, finishes. new lighting, mechanical, electrical, plumbing. m.e.p under seperate permits. no structural work. restroom work | $1,612,960 |
| [201212216725](https://www.permitgraph.org/p/201212216725) | Dec 21, 2012 | Completed: final sign-off Feb 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 11th floor:approx 15,000 sf ti primarily finish upgrades. minor alteration include new offices. mep/fls under separate permit.upgrade suite entry wall/doors | $250,000 |
| [201212126050](https://www.permitgraph.org/p/201212126050) | Dec 12, 2012 | Completed: final sign-off Feb 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 11th floor-interior non structural demolition-ab-017 | $4,500 |
| [201211214707](https://www.permitgraph.org/p/201211214707) | Nov 21, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | ti pa#2012-10-29-2957. 19th fl, install 6 strobes. install 5 speakers. | $4,000 |
| [201211194534](https://www.permitgraph.org/p/201211194534) | Nov 19, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 7th fl, evacuation maps. total of 7. | $2,380 |
| [201211154322](https://www.permitgraph.org/p/201211154322) | Nov 15, 2012 | Completed: final sign-off Jan 2014 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 14th and 15th floor:demolition of non structural partitions, ceilings, glazing doors and finishes. ab017 | $69,000 |
| [201211144199](https://www.permitgraph.org/p/201211144199) | Nov 14, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 19th floor-revision to pa#2012-1029-2957 to include demolition of (e) partition & glazing. refer arch pa# 2012-1029-2957 |  |
| [201211093980](https://www.permitgraph.org/p/201211093980) | Nov 9, 2012 | Completed: final sign-off Nov 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 18th floor:revision to permit#201210242739. install 10 duct detectors, 10 monitor module. install 1 control relay. per ti app#201209139698 | $3,500 |
| [201211083834](https://www.permitgraph.org/p/201211083834) | Nov 8, 2012 | Completed: final sign-off Nov 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 19th floor:add and relocate fire sprinkler heads per t.i. add 10 and relocate 6. bldg app#201210292957 | $9,000 |
| [201211023422](https://www.permitgraph.org/p/201211023422) | Nov 2, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 7th floor as built for pa #2012.0924.0494 - relocate 7 speaker/strobes, install 1 smoke detector. |  |
| [201210292957](https://www.permitgraph.org/p/201210292957) | Oct 29, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 3600 sf (approx) t.i in 20325 sf, 19th floor tenant space. non-structural demo; construction of new offices & kitchenette, upgrades to exist restrooms, mep & fls deferred submittal. no structural wor… | $250,000 |
| [201210242739](https://www.permitgraph.org/p/201210242739) | Oct 24, 2012 | Completed: final sign-off Nov 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | install 3 speaker strobes, 2 wall speaker storbes. ti 201209130698 | $2,500 |
| [201210091611](https://www.permitgraph.org/p/201210091611) | Oct 9, 2012 | Completed: final sign-off Oct 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | revision to 201203206448: delete 2 signs from original scope of work. 1 deleted sign is facing bush, 1 deleted sign facing sansome. (signs to remain are at the corner of bush and sansome) |  |
| [201210051436](https://www.permitgraph.org/p/201210051436) | Oct 5, 2012 | Completed: final sign-off Feb 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 18th floor - add & relcoate fire sprinkler heads per tenant improvement, add 5, relcoate 12. t.i. reference pa #2012.09.13.9698. | $8,500 |
| [201209240494](https://www.permitgraph.org/p/201209240494) | Sep 24, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 7th floor:install 10 ceil speaker-strobe, 4 wall speaker-strobes. install 1 speaker,1 control relay. replace 9 speaker-strobes. replace 4 strobes. t.i. #201208107129 | $15,000 |
| [201209240496](https://www.permitgraph.org/p/201209240496) | Sep 24, 2012 | Completed: final sign-off Oct 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 22nd floor:install 5 speaker-strobe,1 strobe. replace 2 speakers. t.i. #201207255712 | $3,500 |
| [201209190113](https://www.permitgraph.org/p/201209190113) | Sep 19, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 7th floor-fire sprinkler ti: relocate 15 sprinkler heads, relocate/change outs 75 sprinkler heads, 3 added sprinkler heads | $48,075 |
| [201209139698](https://www.permitgraph.org/p/201209139698) | Sep 13, 2012 | Completed: final sign-off Apr 2013 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 18th flr -interior remodel with new partitions, demising walls, tenant entry doors, infill of floor slab and interior finishes. mep under separate permit | $259,000 |
| [201209079188](https://www.permitgraph.org/p/201209079188) | Sep 7, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 22nd floor mechanical & electrical work, reconfigure existing hvac design for new tenant layout, provide & install (5) new reheat vav boxes with digital controls. ref pa #2012.0725.5712. | $10,000 |
| [201209079202](https://www.permitgraph.org/p/201209079202) | Sep 7, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | tenant improvement to include installing two new card reader devices and two new emergency door realease buttons. comply with sffd-ab2.10 | $5,000 |
| [201208298545](https://www.permitgraph.org/p/201208298545) | Aug 29, 2012 | Never finaled: issued Aug 2012, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire spriker system upgrade, relocate 7 upright sprinker heads on the 22nd fl. add 3 sidewall sprinklers heads and add 1 upgright. delete 6 upright heads. | $5,665 |
| [201208227970](https://www.permitgraph.org/p/201208227970) | Aug 22, 2012 | Expired or cancelled: cancelled Sep 2023 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | install 5 speaker-strobes, 1 strobe, 2 emergency release pull stations, replace 2 speakers. | $3,500 |
| [201208107129](https://www.permitgraph.org/p/201208107129) | Aug 10, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | approx 15,000 sf t.i. for internet tech co. improvements include construction of 3-off., 2-meeting rms., 2-phone booths & kitchenette remodel. finish upgrades incl. clgs. elect work incl. lighting, m… | $1,157,000 |
| [201207255712](https://www.permitgraph.org/p/201207255712) | Jul 25, 2012 | Completed: final sign-off Dec 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | temant improvement to include demolishing non structural partitions and building new non structural partitons. mep. life safety and fire sprinkler under seperate permit. | $190,000 |
| [201204108037](https://www.permitgraph.org/p/201204108037) | Apr 10, 2012 | Never finaled: issued Apr 2012, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | revision to pa# 2012-0405-7728; delete 6 strobes from original 16 for a total of 10 strobes, delete 4 speakers from original 5 for a total of 1, install 3 speaker strobes |  |
| [201204057728](https://www.permitgraph.org/p/201204057728) | Apr 5, 2012 | Never finaled: issued Apr 2012, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | install 16-strobes, install 4-speakers. | $6,000 |
| [201203206452](https://www.permitgraph.org/p/201203206452) | Mar 20, 2012 | Completed: final sign-off Oct 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | to erect electric, projecting, door/window sign. (total 5) | $3,000 |
| [201203206448](https://www.permitgraph.org/p/201203206448) | Mar 20, 2012 | Completed: final sign-off Oct 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) | to erect non-electric, projecting, double faced sign. (total 4) | $3,000 |
| [201203196390](https://www.permitgraph.org/p/201203196390) | Mar 19, 2012 | Completed: final sign-off Apr 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Teamwrkx Inc.](https://www.permitgraph.org/contractor/teamwrkx-inc-841440) | 11th floor demolition of some non-structural partitions & finishes. new partitions, glazing & doors. mech/elec to be submitted under spearate permit. | $150,000 |
| [201202284985](https://www.permitgraph.org/p/201202284985) | Feb 28, 2012 | Completed: final sign-off Jul 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add 2 speakers, 4 strobes, 5 speaker/strobes to an (e) fire alarm system in a new 11th floor t.i. space. (t.i.pa#201201303137) | $6,200 |
| [201202224626](https://www.permitgraph.org/p/201202224626) | Feb 22, 2012 | Completed: final sign-off Jul 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 11th floor-mechanical work for tenant improvement-refer to pa# 2012-0130-3137 | $3,000 |
| [201202134065](https://www.permitgraph.org/p/201202134065) | Feb 13, 2012 | Never finaled: issued Feb 2012, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | add four (4) upright sprinkler heads in office space on the 11th floor. | $2,056 |
| [201201303137](https://www.permitgraph.org/p/201201303137) | Jan 30, 2012 | Completed: final sign-off Jul 2012 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | t.i. on the 11th floor to include minor alterations to extg interior partitions to create office and new kitchennette. mep, life safety and fire sprinkler under seperate permit. | $289,000 |
| [M294988](https://www.permitgraph.org/p/M294988) | Jan 6, 2012 | Never finaled: issued Jan 2012, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street space and mta parking |  |
| [M287427](https://www.permitgraph.org/p/M287427) | Nov 3, 2011 | Never finaled: issued Nov 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street space |  |
| [201109084113](https://www.permitgraph.org/p/201109084113) | Sep 8, 2011 | Completed: final sign-off Sep 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add 1 new speaker strobe to an extg fire alarm system in a new ti space(ti app#201105276986) | $4,750 |
| [201109084112](https://www.permitgraph.org/p/201109084112) | Sep 8, 2011 | Completed: final sign-off Sep 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add new fire alarm devices to an existing fa system in new ti space #1330 (ti #201107150340). this includes 1 speaker strobe and 1 strobe. | $5,660 |
| [201107150340](https://www.permitgraph.org/p/201107150340) | Jul 15, 2011 | Completed: final sign-off Sep 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883) | suite #1330-office tenant improvement-new drywall partition, doors, relocated light fixtures, millwork, plumbing, new sink, paint & carpet. electrical, fire life safety & hvac work to be design build… | $85,000 |
| [201106067481](https://www.permitgraph.org/p/201106067481) | Jun 6, 2011 | Never finaled: issued Jul 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | 20th, 21st & 22nd floors-replace evacation signage on 3 floors of building with new graphic signage meeting current codes. installation to be done by building staff engineers. evacuation signage to b… | $4,000 |
| [201105276986](https://www.permitgraph.org/p/201105276986) | May 27, 2011 | Completed: final sign-off Oct 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396) | office ti on the 4th fl. ste 400 - new floor to ceiling partition. upgrade (e) electrical and modify (e) mech for new lay out | $12,500 |
| [M259067](https://www.permitgraph.org/p/M259067) | May 4, 2011 | Never finaled: issued May 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street and mta permit |  |
| [M250287](https://www.permitgraph.org/p/M250287) | Mar 28, 2011 | Never finaled: issued Mar 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street space |  |
| [M243566](https://www.permitgraph.org/p/M243566) | Feb 25, 2011 | Never finaled: issued Feb 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  |  |  |
| [M235786](https://www.permitgraph.org/p/M235786) | Jan 7, 2011 | Never finaled: issued Jan 2011, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street space and mta parking |  |
| [201012207009](https://www.permitgraph.org/p/201012207009) | Dec 20, 2010 | Completed: final sign-off Aug 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | 11th floor - add 3 new smoke detectors to an existing fire alarm system in new t.i. space ( t.i. pa #201012026004). | $3,750 |
| [201012166855](https://www.permitgraph.org/p/201012166855) | Dec 16, 2010 | Completed: final sign-off Apr 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Teamwrkx Inc.](https://www.permitgraph.org/contractor/teamwrkx-inc-841440) | demolition of existing non structural partitions outlets and ceiling panels. consturction of new interior partition, power and data, relocation of lights and finishes | $88,000 |
| [201012076237](https://www.permitgraph.org/p/201012076237) | Dec 7, 2010 | Completed: final sign-off Mar 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 13th fl: fire sprinkler system. remove 7, add 6 | $3,000 |
| [201012026004](https://www.permitgraph.org/p/201012026004) | Dec 2, 2010 | Completed: final sign-off Aug 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Barnegat Group](https://www.permitgraph.org/contractor/barnegat-group-940392) | construct 4 demising partitions. install 4 doors, paint, ada work in ganged bath rooms. accessory and signage relocation. elec/ls to be design build | $25,000 |
| [201011235507](https://www.permitgraph.org/p/201011235507) | Nov 23, 2010 | Completed: final sign-off Mar 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | 13th floor - add to an existing fire alarm system in a new t.i. space (pa #201011104677) one speaker strobe & strobe. | $4,200 |
| [201011104677](https://www.permitgraph.org/p/201011104677) | Nov 10, 2010 | Completed: final sign-off Mar 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 13th floor-tenant improvements to (e) fire sprinkler system-7 added sprinklers & 9 relocated sprinklers | $3,200 |
| [201010153117](https://www.permitgraph.org/p/201010153117) | Oct 15, 2010 | Never finaled: issued Oct 2010, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) | add 2 smoke detectors on 22nd floor elevator lobby for hold open door. this shall be added to an existing fa system | $2,400 |
| [M224713](https://www.permitgraph.org/p/M224713) | Oct 13, 2010 | Never finaled: issued Oct 2010, no final | [225 Bush St](https://www.permitgraph.org/a/0289/007) |  | street space |  |
| [201010082615](https://www.permitgraph.org/p/201010082615) | Oct 8, 2010 | Completed: final sign-off Mar 2011 | [225 Bush St](https://www.permitgraph.org/a/0289/007) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 13th floor: t.i./corridor new 1 hr demising wall/partition at suite 1300; demising wall of (2) separate suites ( #1325 + 1330) new rated egress doors. all mech, elec etc under separate permit/design… | $72,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (40), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (37), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (20), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (11), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (10), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (6), [Carter Brothers Fire & Life Safety](https://www.permitgraph.org/contractor/carter-brothers-fire-life-safety-890931) (6), [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) (6), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (5), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (5), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (4), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (4), [Arrow Sign Company](https://www.permitgraph.org/contractor/arrow-sign-company-314794) (3), [Eco Bay Services Inc.](https://www.permitgraph.org/contractor/eco-bay-services-inc-912328) (2), [Teamwrkx Inc.](https://www.permitgraph.org/contractor/teamwrkx-inc-841440) (2), [The Whiting-Turner Contracting Company](https://www.permitgraph.org/contractor/the-whiting-turner-contracting-company-311107) (2), [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) (2), [Angotti & Reilly Inc.](https://www.permitgraph.org/contractor/angotti-reilly-inc-473263), [Balch Petroleum Contractors & Builders](https://www.permitgraph.org/contractor/balch-petroleum-contractors-builders-396575), [Barnegat Group](https://www.permitgraph.org/contractor/barnegat-group-940392), [Cannon Constructors North Inc](https://www.permitgraph.org/contractor/cannon-constructors-north-inc-918396), [Edison Fire Extinguisher Company Inc](https://www.permitgraph.org/contractor/edison-fire-extinguisher-company-inc-569185), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958), [Intelligent Technologies & Services Inc](https://www.permitgraph.org/contractor/intelligent-technologies-services-inc-592289), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218), [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883)
- Architects: [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223) (7), [Seth Hanley](https://www.permitgraph.org/professional/seth-hanley-C31110) (7), [Daniel Huntsman](https://www.permitgraph.org/professional/daniel-huntsman-C9255) (4), [Gene Pena](https://www.permitgraph.org/professional/gene-pena-C33511) (4), [Clement T Soga](https://www.permitgraph.org/professional/clement-t-soga-C17024) (2), [Dennis Health](https://www.permitgraph.org/professional/dennis-health-C12815) (2), [Jane Crane](https://www.permitgraph.org/professional/jane-crane-C8295) (2), [Aston Pereira](https://www.permitgraph.org/professional/aston-pereira-C12756), [Barbara Stewart](https://www.permitgraph.org/professional/barbara-stewart-C15419), [Donna K Cook](https://www.permitgraph.org/professional/donna-k-cook-C34846), [Elizabeth Utley Hagerty](https://www.permitgraph.org/professional/elizabeth-utley-hagerty-C33839), [John Thiele](https://www.permitgraph.org/professional/john-thiele-C18141), [Kevin Carter](https://www.permitgraph.org/professional/kevin-carter-M30364), [Lisa Bieringer](https://www.permitgraph.org/professional/lisa-bieringer-C34984), [Melissa Pesci](https://www.permitgraph.org/professional/melissa-pesci-C32725), [Smith Group Smith Group](https://www.permitgraph.org/professional/smith-group-smith-group-C8790)
- Engineers: [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828) (3), [Alexander Pacheco](https://www.permitgraph.org/professional/alexander-pacheco-E19378), [Amanda Garcia](https://www.permitgraph.org/professional/amanda-garcia-M38801), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894), [David Flum](https://www.permitgraph.org/professional/david-flum-C45688), [Domagoj Vokic](https://www.permitgraph.org/professional/domagoj-vokic-C29089), [George Soskin](https://www.permitgraph.org/professional/george-soskin-C9223), [Jesus Cabellon Jr.](https://www.permitgraph.org/professional/jesus-cabellon-jr-E9278)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0289/007.