# 110 Sutter St

Block 0288, lot 007. Page: https://www.permitgraph.org/a/0288/007

- City's use: Commercial Office
- Built: 1906
- Stories: 10
- Building: 47,665 sq ft
- Lot: 4,809 sq ft
- Zoning: C3O
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

107 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202510298340](https://www.permitgraph.org/p/202510298340) | Oct 29, 2025 | Expired or cancelled: withdrawn Nov 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | interior remodel @ 5th fl tenant space includes demo, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separately | $150,000 |
| [202501027617](https://www.permitgraph.org/p/202501027617) | Jan 2, 2025 | In progress: issued Mar 2025 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | addition to existing fire alarm system. pyro-comm will be adding a cellular communication dialer to an existing fire alarm system. all noftifications devices will remain. all addressible devices will… | $10,699 |
| [202108025558](https://www.permitgraph.org/p/202108025558) | Aug 2, 2021 | Completed: final sign-off Nov 2021 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Giampolini & Co Dba Giampolini/Courtney](https://www.permitgraph.org/contractor/giampolini-co-dba-giampolini-courtney-797184) | sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) cha… | $100,000 |
| [202102255353](https://www.permitgraph.org/p/202102255353) | Feb 25, 2021 | Expired or cancelled: cancelled Jan 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051) | install non-electric projecting double faced wall sign (one medical) | $5,000 |
| [202011168984](https://www.permitgraph.org/p/202011168984) | Nov 16, 2020 | Completed: final sign-off Nov 2021 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Giampolini & Co Dba Giampolini/Courtney](https://www.permitgraph.org/contractor/giampolini-co-dba-giampolini-courtney-797184) | facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/a | $600,000 |
| [201904097440](https://www.permitgraph.org/p/201904097440) | Apr 9, 2019 | Never finaled: issued Apr 2019, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | revision to 201808207736 change to mechanical layout. | $10,400 |
| [201811196182](https://www.permitgraph.org/p/201811196182) | Nov 19, 2018 | Never finaled: issued Nov 2018, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | ref pa # 201808207736; fire alarm t.i. adding (2) smoke detectors and (21) strobes & horn stobes | $11,500 |
| [201810153173](https://www.permitgraph.org/p/201810153173) | Oct 15, 2018 | Completed: final sign-off Nov 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | structural monitoring of vrf system and addition of split system to serve idf rooms. ref mech pa 2018 07275782 ref arch 201805240048 | $22,000 |
| [201810042227](https://www.permitgraph.org/p/201810042227) | Oct 4, 2018 | Expired or cancelled: cancelled Jan 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | 2/f: installat of brf system on second floor to feed into fifth floor. ref. t.i. pa201805240048. maher n/a. | $10,000 |
| [201809109587](https://www.permitgraph.org/p/201809109587) | Sep 10, 2018 | Completed: final sign-off Nov 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | revision to app # 201805240048. suite 500. rev to electrical work | $55,000 |
| [201808318849](https://www.permitgraph.org/p/201808318849) | Aug 31, 2018 | Completed: final sign-off Nov 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 5th flr - full floor fa ti - 1 new rps, 5 duct det for 5 fcu, 8 control relays to include optional, elective unlocking of stairwell doors and drops for smoke guard on elevator doors, 20 new audio/vis… | $15,500 |
| [201808228033](https://www.permitgraph.org/p/201808228033) | Aug 22, 2018 | Never finaled: issued Aug 2018, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | removal of interior t.i. including restrooms, partitons, suspended ceilings, fixtures and finishes. no disabled acess per ab-017 | $20,000 |
| [201808207736](https://www.permitgraph.org/p/201808207736) | Aug 20, 2018 | Never finaled: issued Oct 2018, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 6th fl - full floor a/mep renovation of interior 6th fl tenant space. new restrooms and doctor's office. file ab005/ab037 for 1-hr corridors and 20 min doors to meet exit separation requirements. uns… | $471,770 |
| [201807315967](https://www.permitgraph.org/p/201807315967) | Jul 31, 2018 | Never finaled: issued Jul 2018, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 10th fl - fire alarm ti 1 rps, 6 new audiovisual devices, replace 2 old audio/visual devices, and 3 modules. ref pa 2018-0621-2552 | $6,000 |
| [201807275782](https://www.permitgraph.org/p/201807275782) | Jul 27, 2018 | Completed: final sign-off Nov 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | 5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils,duct work. ref pa#201805240048. | $190,000 |
| [201806212552](https://www.permitgraph.org/p/201806212552) | Jun 21, 2018 | Completed: final sign-off Oct 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separately | $80,000 |
| [201805240048](https://www.permitgraph.org/p/201805240048) | May 24, 2018 | Completed: final sign-off Nov 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | remodel of extg 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24… | $300,000 |
| [201801310080](https://www.permitgraph.org/p/201801310080) | Jan 31, 2018 | Never finaled: issued Mar 2018, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | interior demolition at 5th floor. includes demolition of interior partitions and restroom in preparation for future improvement. no ceiling demo. | $24,000 |
| [201712227238](https://www.permitgraph.org/p/201712227238) | Dec 22, 2017 | Completed: final sign-off Mar 2018 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | f/a 2nd fl: (1) strobe power supply; (1) control module; (6) horn/strobes; (1) strobe; (1) smoke detector. (10) devices total. building pa #201710252144 | $6,000 |
| [201710252144](https://www.permitgraph.org/p/201710252144) | Oct 25, 2017 | Never finaled: issued Nov 2017, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | 2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s). | $120,000 |
| [M803507](https://www.permitgraph.org/p/M803507) | Jun 30, 2017 | Never finaled: issued Jun 2017, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | street space |  |
| [201609157768](https://www.permitgraph.org/p/201609157768) | Sep 15, 2016 | Completed: final sign-off Dec 2016 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) | interior demolition at 4th floor, includes demolition of interior partitions and restrooms in preparation for future tenant improvements under separate permit application. no exterior work. fire unde… | $26,000 |
| [201504012469](https://www.permitgraph.org/p/201504012469) | Apr 1, 2015 | Never finaled: issued Apr 2015, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Art-Tek Builders](https://www.permitgraph.org/contractor/art-tek-builders-715904) | 6th flr: remove non-bearing interior walls and doors for spec spaces. no structural changes t-bar ceiling & lights - demo only | $8,750 |
| [201412224206](https://www.permitgraph.org/p/201412224206) | Dec 22, 2014 | Completed: final sign-off May 2015 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Art-Tek Builders](https://www.permitgraph.org/contractor/art-tek-builders-715904) | convert e office room into new unisex restroom with 1 ada toilet and lavatory. (e) door to be moved to left by 18", new ceiling joists to be installed below existing concrete ceiling, add electrical… | $26,000 |
| [201409085756](https://www.permitgraph.org/p/201409085756) | Sep 8, 2014 | Never finaled: issued Sep 2014, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 3 ceiling mount horn strobes. 2 ceiling mount strobes, remove 2 wall mount strobes in 1st floor yoga studio. ti 201407090839 | $2,800 |
| [201408194149](https://www.permitgraph.org/p/201408194149) | Aug 19, 2014 | Never finaled: issued Aug 2014, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [E J G A](https://www.permitgraph.org/contractor/e-j-g-a-989599) | as builts to pa# 2014-0709-0839. remove requirement for ti "sprinklers under seperate permit". no sprinklers in (e) building. fire only permit. no drawings required. |  |
| [201407090839](https://www.permitgraph.org/p/201407090839) | Jul 9, 2014 | Completed: final sign-off Oct 2014 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [E J G A](https://www.permitgraph.org/contractor/e-j-g-a-989599) | change use from a printing shop to a new yoga studio. work includes demo walls, new restrooms and yoga rooms. mep under separate permit. | $30,000 |
| [201312063571](https://www.permitgraph.org/p/201312063571) | Dec 6, 2013 | Never finaled: issued Dec 2013, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 2 horntrobes and 1 strobe on 3rd floor ref app 201308154463 | $2,200 |
| [201311262842](https://www.permitgraph.org/p/201311262842) | Nov 26, 2013 | Completed: final sign-off Jul 2014 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Westridge Builders, Inc.](https://www.permitgraph.org/contractor/westridge-builders-inc-528562) | demolition of some (e) walls (non-structural) new framing of dental office, (n) plumbing, (n) electrical & (n) interior finishes cabinetry etc. | $111,882 |
| [201308154463](https://www.permitgraph.org/p/201308154463) | Aug 15, 2013 | Never finaled: issued Aug 2013, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 3rd floor-t.i. new partitions, doors, relocate light fixtures | $62,000 |
| [201304235233](https://www.permitgraph.org/p/201304235233) | Apr 23, 2013 | Completed: final sign-off May 2013 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 7th floor suite 700 - commercial t.i. for office space, scope of work including (n) millwork @ (e) breakroom & finishes, (n) elec under separate permit, (e) partitions to remain, no new prtitions, no… | $21,000 |
| [201303212770](https://www.permitgraph.org/p/201303212770) | Mar 21, 2013 | Completed: final sign-off May 2013 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 7th floor-suite #700-interior demolition of 55' linear ft of non structural interior partitions. 7th floor to remain vacant as per ab-017 | $6,000 |
| [201208086840](https://www.permitgraph.org/p/201208086840) | Aug 8, 2012 | Completed: final sign-off Oct 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add 2 horn strobes and 2 strobes, replace 2 existing horn strobes on the 1st floor | $2,700 |
| [201206152671](https://www.permitgraph.org/p/201206152671) | Jun 15, 2012 | Completed: final sign-off Jun 2013 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 1st floor - relocation of power & data, new barber station with sink, new dressing room with partial height wall & new finishes. mep, sprinklers & life safety under separate permit. | $50,000 |
| [201206061927](https://www.permitgraph.org/p/201206061927) | Jun 6, 2012 | Expired or cancelled: cancelled Jan 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | relocation of power and data, new barber station with sink, construction of new dressing room with partial height walls, new finishes. mech, elec,life safety and sprinkler system, plumbing, under sep… | $50,000 |
| [M309607](https://www.permitgraph.org/p/M309607) | Mar 22, 2012 | Never finaled: issued Mar 2012, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | street space and mta parking |  |
| [201201232725](https://www.permitgraph.org/p/201201232725) | Jan 23, 2012 | Completed: final sign-off Jul 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | 3rd floor:revision to app#201108253222. revision includes demolition of extg telephone closet and construction of new including power receptacles,lighting, and finishes. also furring out of extg part… |  |
| [M296288](https://www.permitgraph.org/p/M296288) | Jan 13, 2012 | Never finaled: issued Jan 2012, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | street space & mta parking meter |  |
| [201110146804](https://www.permitgraph.org/p/201110146804) | Oct 14, 2011 | Completed: final sign-off May 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 3rd floor - add 2 manual alarms, 1 smoke detector, 7 horn/strobes, 3 strobes & 1 module. | $5,000 |
| [201108293457](https://www.permitgraph.org/p/201108293457) | Aug 29, 2011 | Completed: final sign-off May 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 2nd & 4th floor-relocate (e) strobe-add 1 new strobe | $1,900 |
| [201108253222](https://www.permitgraph.org/p/201108253222) | Aug 25, 2011 | Completed: final sign-off Jul 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | floor 3rd - demolition of (e) plumbing fixtures, light fixtures, ceiling grid, partitions, doors/frames/hardware & finiahes. new const women's & men's restroomsincluding partitions, doors/frames, gyp… | $125,000 |
| [201107200645](https://www.permitgraph.org/p/201107200645) | Jul 20, 2011 | Completed: final sign-off Aug 2011 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | to obtain final inspection for work approved under pa# 200601242912. all work is complete. |  |
| [201106087708](https://www.permitgraph.org/p/201106087708) | Jun 8, 2011 | Completed: final sign-off Jul 2012 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | barrior removal project demolition of existing plumbing fixtures light fixtures, ceiling grid, partitions, doors/frames/hardware and finishes on 2nd and 4th floor men's restrooms. constrution of new… | $115,000 |
| [201003097781](https://www.permitgraph.org/p/201003097781) | Mar 9, 2010 | Completed: final sign-off Jun 2010 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | demolition of walls, make safe electrical. | $9,000 |
| [200907293686](https://www.permitgraph.org/p/200907293686) | Jul 29, 2009 | Never finaled: issued Jul 2009, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | addition of 2 monitoring modules and 2 relay modules to relase door locks on the 7th and 9th floors. | $1,500 |
| [200903244747](https://www.permitgraph.org/p/200903244747) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | renew pa# 2007/05/23/2068 to obtain final inspection. all work has been completed. |  |
| [200903244750](https://www.permitgraph.org/p/200903244750) | Mar 24, 2009 | Completed: final sign-off Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | renew pa# 2008/03/14/7141 to obtain final inspection. all work has been completed. |  |
| [200903053434](https://www.permitgraph.org/p/200903053434) | Mar 5, 2009 | Completed: final sign-off Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | addition of 1 smoke detector and reloacation of 1 manual pull station | $2,000 |
| [200901200453](https://www.permitgraph.org/p/200901200453) | Jan 20, 2009 | Never finaled: issued Jan 2009, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | renew pa# 2007/12/11/0216 to obtain final inspection. all work has been completed. |  |
| [200812198907](https://www.permitgraph.org/p/200812198907) | Dec 19, 2008 | Completed: final sign-off Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st floor - to obtain fianl inspection for work done under appl 200805272887. all work is complete. |  |
| [200809181954](https://www.permitgraph.org/p/200809181954) | Sep 18, 2008 | Completed: final sign-off Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | revision to 200708078965: as built sheet notes and details as requested by fire inspector. |  |
| [M133990](https://www.permitgraph.org/p/M133990) | Sep 12, 2008 | Never finaled: issued Sep 2008, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | street space permit only. |  |
| [200805293103](https://www.permitgraph.org/p/200805293103) | May 29, 2008 | Never finaled: issued May 2008, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | 1st floor, install lighting for office lobby. | $7,000 |
| [200805272887](https://www.permitgraph.org/p/200805272887) | May 27, 2008 | Expired or cancelled: expired Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st floor-addition of 1 horn/strobe and 1 manual alarm to the (e) fire alarm system due to a remodel (lobbby) | $2,000 |
| [200803147141](https://www.permitgraph.org/p/200803147141) | Mar 14, 2008 | Expired or cancelled: expired Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 1st floor: revision to appl #200705232068 -re-clad existing storefront framing & install two new entry doors in existing openings | $15,000 |
| [200801243146](https://www.permitgraph.org/p/200801243146) | Jan 24, 2008 | Expired or cancelled: cancelled Jan 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 6th floor - addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system. |  |
| [200801243164](https://www.permitgraph.org/p/200801243164) | Jan 24, 2008 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 6th fl addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system. | $4,000 |
| [200801092169](https://www.permitgraph.org/p/200801092169) | Jan 9, 2008 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | install lights to meet t-24 on 6th floor for building requirement. reference approved pa# 2007.10.23.6140 for arch. plans | $55,000 |
| [200712211148](https://www.permitgraph.org/p/200712211148) | Dec 21, 2007 | Expired or cancelled: withdrawn Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | expansion/additions to fire alarm system as part of a tenant improvement on 6th floor. | $10,000 |
| [200712110216](https://www.permitgraph.org/p/200712110216) | Dec 11, 2007 | Expired or cancelled: expired Jul 2011 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | relocation of 1 smoke detector, 1 heat detector, 4 modules, 1 relay and installation of 2 additional smoke detectors, 1 additional heat detector and 2 horn/strobes as part of the elevator alteration… | $10,000 |
| [200711027173](https://www.permitgraph.org/p/200711027173) | Nov 2, 2007 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | addition to existing fire alarm system | $4,300 |
| [200710236140](https://www.permitgraph.org/p/200710236140) | Oct 23, 2007 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | tenant improvement on the vacant 6th floor. new partitions,ceilings, lighting,mechanical and electrical work | $200,000 |
| [200709102265](https://www.permitgraph.org/p/200709102265) | Sep 10, 2007 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 6th floor-enclose (e) interior stairs with 1hr-fire rated construction; new fire-rated elevator lobby; new accessible restrooms. mech. elec. and plumbing under separate permit. no exterior work. | $150,000 |
| [200708159849](https://www.permitgraph.org/p/200708159849) | Aug 15, 2007 | Completed: final sign-off Mar 2008 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | demolition of 6th floor office space, office sace must remain vacant until permit for tenant improvement is filed and apprved fire safety devic4es to remain opperational | $25,000 |
| [200708159831](https://www.permitgraph.org/p/200708159831) | Aug 15, 2007 | Expired or cancelled: cancelled Jan 2026 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | demolition of 6th floor office space. office space must remain vacant until t.i. permit is filed and approved. fire safety devices to remain functional. | $25,000 |
| [200708078916](https://www.permitgraph.org/p/200708078916) | Aug 7, 2007 | Never finaled: issued Aug 2007, no final | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | add to annunciator panel per approved app #200703146204 | $8,500 |
| [200708078965](https://www.permitgraph.org/p/200708078965) | Aug 7, 2007 | Expired or cancelled: expired Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | construct new stairs from 1st floor to basement; existing stair at store front shall remain intact and be covered w/ new floor framing. | $45,000 |
| [200705232068](https://www.permitgraph.org/p/200705232068) | May 23, 2007 | Expired or cancelled: expired Apr 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | construct new wall to separate building lobby and vacant retail shell space, match existing conditions, 1st floor | $20,000 |
| [200703146234](https://www.permitgraph.org/p/200703146234) | Mar 14, 2007 | Expired or cancelled: expired Jul 2011 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | ground floor corridor: install 3 2x4 light fixtures, 1 ceiling mounted occupancy sensor, 2 gang switch, 1 duplex receptacle. | $15,000 |
| [200703146204](https://www.permitgraph.org/p/200703146204) | Mar 14, 2007 | Expired or cancelled: expired Jul 2011 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | elevator upgrade: 8 smoke detector, 1 heat detector, 3 control relay & 1 module, 1 strobe light. | $12,000 |
| [200612089452](https://www.permitgraph.org/p/200612089452) | Dec 8, 2006 | Completed: final sign-off Jul 2007 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | demolition and minor construction on ground floor. relocation of light fixtures, new ceiling grid, new receptacles. | $15,000 |
| [200607287940](https://www.permitgraph.org/p/200607287940) | Jul 28, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1. rev. 1st fl | $3,000 |
| [200607186820](https://www.permitgraph.org/p/200607186820) | Jul 18, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of 2 smoke detectors, 5 horn/strobes and 2 door holders as part of remodel of the 7th floor. | $10,000 |
| [200607146538](https://www.permitgraph.org/p/200607146538) | Jul 14, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | oti 2 7th floor el | $25,000 |
| [200606204505](https://www.permitgraph.org/p/200606204505) | Jun 20, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | oti-1, 7th floor, el, ls. | $103,000 |
| [200604128761](https://www.permitgraph.org/p/200604128761) | Apr 12, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | addition of 2 horn/strobes due to a tenant improvement of 1st flr | $4,000 |
| [200603106413](https://www.permitgraph.org/p/200603106413) | Mar 10, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) | tenant imporvemtns on ground floor retail/offie space. electrical & plubing, mechanical under separte permit . | $90,000 |
| [200602164806](https://www.permitgraph.org/p/200602164806) | Feb 16, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) | 7th floor only 4 extg lights 4 b-1 fixture/9 downlights/6 pending/4 wall sconces/hune fixture | $12,000 |
| [200602154664](https://www.permitgraph.org/p/200602154664) | Feb 15, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 7th floor - additions to the extg fire alarm system for the 7th floor core & shell area. | $7,000 |
| [200601242912](https://www.permitgraph.org/p/200601242912) | Jan 24, 2006 | Expired or cancelled: expired Feb 2009 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of a door lock releasing device , 1 control moduel and 1 relay moduel on the 10th floor. door lock will release in an alarm cndition of he fire alarm system | $3,000 |
| [200601122000](https://www.permitgraph.org/p/200601122000) | Jan 12, 2006 | Completed: final sign-off Sep 2006 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1 7th floor, el, ls. new men & women restroom, enclosing 2 fire exit stairs. | $166,000 |
| [200411159219](https://www.permitgraph.org/p/200411159219) | Nov 15, 2004 | Completed: final sign-off Dec 2004 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Haddon Engineering Inc](https://www.permitgraph.org/contractor/haddon-engineering-inc-322104) | install ventilation fans & ducting | $5,000 |
| [200410298069](https://www.permitgraph.org/p/200410298069) | Oct 29, 2004 | Completed: final sign-off Dec 2004 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of 3 horn/strobes, 2 strobes & one smoke detector on the 9th fl | $12,000 |
| [200409144040](https://www.permitgraph.org/p/200409144040) | Sep 14, 2004 | Completed: final sign-off Dec 2004 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561) | oti-1 9th floor el, me, l/s | $200,000 |
| [200304112129](https://www.permitgraph.org/p/200304112129) | Apr 11, 2003 | Completed: final sign-off May 2003 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | remodel to existing 4th floor space no hvac. no elec | $6,000 |
| [200207191884](https://www.permitgraph.org/p/200207191884) | Jul 19, 2002 | Expired or cancelled: expired Jan 2004 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | additions tothe fire alarm system dueto the tenant improvement on the 3rd floor | $17,000 |
| [200204093457](https://www.permitgraph.org/p/200204093457) | Apr 9, 2002 | Completed: final sign-off Nov 2002 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) | remodel of 3rd fl for medical office space | $325,000 |
| [200112286032](https://www.permitgraph.org/p/200112286032) | Dec 28, 2001 | Completed: final sign-off Aug 2002 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 3rd floor -install steel reinforcement at masonry opening (2 each on 3rd floor) | $3,500 |
| [200112286030](https://www.permitgraph.org/p/200112286030) | Dec 28, 2001 | Completed: final sign-off Aug 2002 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 7th floor -install steel reinforcement at masonry opening (2 each on 7th floor) | $3,500 |
| [200111062523](https://www.permitgraph.org/p/200111062523) | Nov 6, 2001 | Expired or cancelled: expired Aug 2003 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 2/f & 6/f fire alarm new restrooms and elevator lobbies | $4,400 |
| [200109188515](https://www.permitgraph.org/p/200109188515) | Sep 18, 2001 | Completed: final sign-off Nov 2002 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 3/fl.-new (2) restroom enclose (2) stairwells | $36,000 |
| [200109188518](https://www.permitgraph.org/p/200109188518) | Sep 18, 2001 | Expired or cancelled: expired Dec 2003 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | 7/fl. -new (2) restrooms, enclose (2) stairwells | $38,000 |
| [200104207339](https://www.permitgraph.org/p/200104207339) | Apr 20, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1 (10th fl) el only | $25,000 |
| [200104207327](https://www.permitgraph.org/p/200104207327) | Apr 20, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-2:9th fl, el only | $25,000 |
| [200104035910](https://www.permitgraph.org/p/200104035910) | Apr 3, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1, 10th floor, el, me, ls, sp. | $10,000 |
| [200104035912](https://www.permitgraph.org/p/200104035912) | Apr 3, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1 9th floor, el, me, ls, sp. | $10,000 |
| [200103053468](https://www.permitgraph.org/p/200103053468) | Mar 5, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | add new facp for t/i of 10/f build owner to submit corrective action plan within 60 days | $21,000 |
| [200102021267](https://www.permitgraph.org/p/200102021267) | Feb 2, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1 (rev) 9th flr, el, me, l/s & sp | $100,000 |
| [200102021269](https://www.permitgraph.org/p/200102021269) | Feb 2, 2001 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1 10th flr el, me, l/s sp | $100,000 |
| [200012158075](https://www.permitgraph.org/p/200012158075) | Dec 15, 2000 | Expired or cancelled: cancelled Aug 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1 3rd floor/electrical, lifesadty, sprinkler | $40,000 |
| [200012158071](https://www.permitgraph.org/p/200012158071) | Dec 15, 2000 | Expired or cancelled: cancelled Aug 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1 7th floor, electrical, lifesafty, sprinkler | $40,000 |
| [200011306916](https://www.permitgraph.org/p/200011306916) | Nov 30, 2000 | Expired or cancelled: expired Mar 2002 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | mitigate complnt #9901859 floors 1,2,4,5,8,6 new doors on 1/f (n)hc restrms on 2/f auto door openers | $15,000 |
| [200009201053](https://www.permitgraph.org/p/200009201053) | Sep 20, 2000 | Expired or cancelled: cancelled Feb 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1 9th floor el | $150,000 |
| [200009180808](https://www.permitgraph.org/p/200009180808) | Sep 18, 2000 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1, 10th floor el |  |
| [200009180812](https://www.permitgraph.org/p/200009180812) | Sep 18, 2000 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1, 9th floor el | $50,000 |
| [200009180809](https://www.permitgraph.org/p/200009180809) | Sep 18, 2000 | Expired or cancelled: cancelled Jun 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | oti-1 10th floor, el, ls | $150,000 |
| [200004086761](https://www.permitgraph.org/p/200004086761) | Apr 8, 2000 | Completed: final sign-off Jul 2001 | [110 Sutter St](https://www.permitgraph.org/a/0288/007) |  | t/i cludes demo of (e) n/n partition walls | $45,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (20), [Bevilacqua & Sons](https://www.permitgraph.org/contractor/bevilacqua-sons-732067) (16), [Mc Millan Electric](https://www.permitgraph.org/contractor/mc-millan-electric-268179) (7), [Evolv Commercial Construction Inc](https://www.permitgraph.org/contractor/evolv-commercial-construction-inc-849970) (6), [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) (6), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (4), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) (3), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (3), [Art-Tek Builders](https://www.permitgraph.org/contractor/art-tek-builders-715904) (2), [E J G A](https://www.permitgraph.org/contractor/e-j-g-a-989599) (2), [Giampolini & Co Dba Giampolini/Courtney](https://www.permitgraph.org/contractor/giampolini-co-dba-giampolini-courtney-797184) (2), [Ad Art Inc.](https://www.permitgraph.org/contractor/ad-art-inc-826051), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772), [Haddon Engineering Inc](https://www.permitgraph.org/contractor/haddon-engineering-inc-322104), [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929), [Team Commercial Construction Inc.](https://www.permitgraph.org/contractor/team-commercial-construction-inc-735561), [Westridge Builders, Inc.](https://www.permitgraph.org/contractor/westridge-builders-inc-528562)
- Architects: [Michael Zucker](https://www.permitgraph.org/professional/michael-zucker-C8820) (6), [Douglas Booth](https://www.permitgraph.org/professional/douglas-booth-C14737) (4), [Robbin Mcdonald](https://www.permitgraph.org/professional/robbin-mcdonald-C15157) (3), [David Cassidy](https://www.permitgraph.org/professional/david-cassidy-C32857) (2), [Yi-Tso Jeff Chen](https://www.permitgraph.org/professional/yi-tso-jeff-chen-C17977) (2), [Douglas Booth](https://www.permitgraph.org/professional/douglas-booth-C32618), [Megan Stevens](https://www.permitgraph.org/professional/megan-stevens-C30752), [Michael Knauff](https://www.permitgraph.org/professional/michael-knauff-C30740), [Michael Steiner](https://www.permitgraph.org/professional/michael-steiner-C31950), [Russ Beaudin](https://www.permitgraph.org/professional/russ-beaudin-C26255), [Sarah Louie-Roitman](https://www.permitgraph.org/professional/sarah-louie-roitman-C33436), [Virginie Manichon](https://www.permitgraph.org/professional/virginie-manichon-C32701)
- Engineers: [Pablo Orozco](https://www.permitgraph.org/professional/pablo-orozco-M27485) (2), [Alan C. Burr](https://www.permitgraph.org/professional/alan-c-burr-S5062), [Carl Milsum](https://www.permitgraph.org/professional/carl-milsum-S6190), [Chris Oliveira](https://www.permitgraph.org/professional/chris-oliveira-C33407), [Kylie Lo](https://www.permitgraph.org/professional/kylie-lo-E23357), [Paul R. Kiley](https://www.permitgraph.org/professional/paul-r-kiley-E17869)
- Authorized agents: [Chris Shackley](https://www.permitgraph.org/professional/chris-shackley-E18350), [Heidi Liebes](https://www.permitgraph.org/professional/heidi-liebes-C29300), [Kay Young](https://www.permitgraph.org/professional/kay-young-C14328), [Velba Villanueva](https://www.permitgraph.org/professional/velba-villanueva-17977)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0288/007.
