# 562 Sutter St

Block 0284, lot 010. Page: https://www.permitgraph.org/a/0284/010

- City's use: Commercial Hotel
- Built: 1907
- Stories: 7
- Units: 96
- Building: 41,272 sq ft
- Lot: 6,847 sq ft
- Zoning: C3R
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

36 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202006128621](https://www.permitgraph.org/p/202006128621) | Jun 12, 2020 | Completed: final sign-off Oct 2020 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | basement: tenant improvement to existing notifier nfs2-3030. adding 1 smoke detector, 1 horn strobe, 1 strobe, and 1 control relay. the project is to install a new side walk lift. this type of lift i… | $5,800 |
| [M1197987](https://www.permitgraph.org/p/M1197987) | Feb 21, 2020 | Never finaled: issued Feb 2020, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | street space |  |
| [202002053647](https://www.permitgraph.org/p/202002053647) | Feb 5, 2020 | Expired or cancelled: cancelled Jan 2026 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | revision to 201903215895, consistes of interior structural modifications to basement lvel sidewalk elevator pit concrete. no change to 1st fl sidewalk |  |
| [201911126929](https://www.permitgraph.org/p/201911126929) | Nov 12, 2019 | Completed: final sign-off Dec 2020 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | install 1 illuminated single-faced sign on (e) canopy. "hotel emblem" | $10,000 |
| [201911056470](https://www.permitgraph.org/p/201911056470) | Nov 5, 2019 | Never finaled: issued Mar 2021, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | installation of a wall mural 58'-8" by 25'-9.5" |  |
| [M1149827](https://www.permitgraph.org/p/M1149827) | Oct 8, 2019 | Never finaled: issued Oct 2019, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | street space |  |
| [201903266257](https://www.permitgraph.org/p/201903266257) | Mar 26, 2019 | Completed: final sign-off Apr 2019 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | rev to pa201809170423; remove of scope of levl 1 recessed entry. scope includes door j, door h and type a5 eterior wall. this scope under sep pa201811054938. this permit to satisy requ from dcp kelly… |  |
| [201903215895](https://www.permitgraph.org/p/201903215895) | Mar 21, 2019 | Never finaled: issued Jan 2020, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991) | permit consists of modifications to basment maintenance room and office to support new sidewalk lift and machine room. existing lift gate opening at sutter st sidewalk to be revised; no change to sid… | $242,000 |
| [201901311729](https://www.permitgraph.org/p/201901311729) | Jan 31, 2019 | Completed: final sign-off Jul 2020 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Incom Mechanical Inc](https://www.permitgraph.org/contractor/incom-mechanical-inc-517617) | replace e fire pump with code legal fire pump of equal pressure & flow rates. ref ti 201810294425. n/a for maher. | $35,550 |
| [201812047391](https://www.permitgraph.org/p/201812047391) | Dec 4, 2018 | Completed: final sign-off Apr 2019 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | revision to app#201810294431: electrical work to support renovation of level 1 public spaces. work includes new lighting and elec. cafe, library bar/fire alarm & sprinkler scope to be addressed in se… |  |
| [201811166147](https://www.permitgraph.org/p/201811166147) | Nov 16, 2018 | Never finaled: issued Dec 2018, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | bldg permits #2018-0404-5507, revision: 2018-0816-7519, revision: 2018-0914-0225 as part of a building renovation project new notifier nfs2-3030 is being installed. | $102,000 |
| [201811054938](https://www.permitgraph.org/p/201811054938) | Nov 5, 2018 | Completed: final sign-off Mar 2020 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | facade modifcations,limited to fire escape ladder & ground fl storefront zone, scope inlcudes new finishes & fixed marquee. demo of existing fabric awnigs, decorative architrave & column strouds. sig… | $67,000 |
| [201811054935](https://www.permitgraph.org/p/201811054935) | Nov 5, 2018 | Never finaled: issued Jul 2020, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | minor permit to alter consits of replacing selected (e) wood single hung windows in-kind with (n)wood single hung windows, scope limited to guest room at suter st facade. now work to be done to level… | $81,000 |
| [201810294431](https://www.permitgraph.org/p/201810294431) | Oct 29, 2018 | Completed: final sign-off Apr 2019 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | electrical work to support renovation of level 1 public spaces. work includes new lighting and electrical. cafe, library bar, fire alarm and sprinkler scope to be addressed in seperate permit. n/a fo… | $60,000 |
| [201810294425](https://www.permitgraph.org/p/201810294425) | Oct 29, 2018 | Completed: final sign-off Apr 2019 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | interior modifications limitted to level 1 reception cafe and library bar. new casework, door and finishes. new electrical and plumbing and food service equipment. fire alarm/sprinkler to be addresse… | $101,000 |
| [201810294432](https://www.permitgraph.org/p/201810294432) | Oct 29, 2018 | Never finaled: issued Feb 2019, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Elements Of Hospitality Inc](https://www.permitgraph.org/contractor/elements-of-hospitality-inc-997266) | revision to app#201809140225, consists of inteterior modifications to guest level corridor lighting and electrical. non exterior work, no change to guest room count. n/a for maher |  |
| [201809170423](https://www.permitgraph.org/p/201809170423) | Sep 17, 2018 | Completed: final sign-off Apr 2019 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | rev to # 201804206916, consists of interior modifications limited to level 1 1 public spaces & basement scope includes new ceiling, partitions, doors, finishes & casework mep scope is seperate permit |  |
| [201809140225](https://www.permitgraph.org/p/201809140225) | Sep 14, 2018 | Never finaled: issued Feb 2019, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Elements Of Hospitality Inc](https://www.permitgraph.org/contractor/elements-of-hospitality-inc-997266) | revision to app#201804045507, consists of interior modifications to guest room mechanical and bathrooms. showers reverted back to extg tubs in 30 guest bathrooms. mechanical units reduced on level 2.… |  |
| [201808167519](https://www.permitgraph.org/p/201808167519) | Aug 16, 2018 | Never finaled: issued Feb 2019, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Elements Of Hospitality Inc](https://www.permitgraph.org/contractor/elements-of-hospitality-inc-997266) | floors 2-7: revision to pa #201804045507; consist of interior modifications to guest level corridors. scope includes electrical & plumbing work for corridor amenity stations and new lighting. no exte… | $30,000 |
| [201804206916](https://www.permitgraph.org/p/201804206916) | Apr 20, 2018 | Never finaled: issued Sep 2018, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) | renovation of level 1 public spaces, and basement fitness room and office. work includes non-structural demo and construction of walls, doors, ceilings and finishes. mep, fire alarm and sprinkler sco… | $330,000 |
| [201804045507](https://www.permitgraph.org/p/201804045507) | Apr 4, 2018 | Never finaled: issued Aug 2018, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Elements Of Hospitality Inc](https://www.permitgraph.org/contractor/elements-of-hospitality-inc-997266) | reno of 91 out of 96 guest bathrooms. work shall include replacement of plumbing fixtures, a-2 bathroom doors and 11 guest entry doors, and modification of 49 bathroom doors and replacement of guest… | $430,000 |
| [201803163907](https://www.permitgraph.org/p/201803163907) | Mar 16, 2018 | Expired or cancelled: cancelled Jan 2026 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | correction of a labeling error to guest room #713 and #714. drawing set is a revision to app#201711224717. n/a for maher |  |
| [201802131182](https://www.permitgraph.org/p/201802131182) | Feb 13, 2018 | Never finaled: issued Aug 2018, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | alteration: renovation of 5 accessible guest bathrooms. work shall include replacement of plumbing fixtures, partitions, finishes and doors. rooms include #311,406,506,606,711. no fire alarm or sprin… | $94,103 |
| [201711224717](https://www.permitgraph.org/p/201711224717) | Nov 22, 2017 | Completed: final sign-off Apr 2018 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Award Construction And Restoration Inc](https://www.permitgraph.org/contractor/award-construction-and-restoration-inc-922754) | rooms #710 & 711. renovation of a single hotel guestroom and 2 guest bathrooms. work shall include replacement of plumbing fixtures and finishes. replacement of corrodor lights. maher na | $10,000 |
| [201501135594](https://www.permitgraph.org/p/201501135594) | Jan 13, 2015 | Expired or cancelled: cancelled Jan 2026 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | renew for final 200711158255 |  |
| [201501135609](https://www.permitgraph.org/p/201501135609) | Jan 13, 2015 | Completed: final sign-off Mar 2015 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | to obtain final inspection for work approved under pa #2007.1115.8255. all work is complete. |  |
| [201501125486](https://www.permitgraph.org/p/201501125486) | Jan 12, 2015 | Completed: final sign-off Mar 2015 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | to obtain final inspection for work approved under pa#2005-1102-7217. wll work is complete. |  |
| [201109154666](https://www.permitgraph.org/p/201109154666) | Sep 15, 2011 | Expired or cancelled: cancelled Jan 2026 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Synergy Project Mgmt Inc](https://www.permitgraph.org/contractor/synergy-project-mgmt-inc-644102) | installation of eyebolts on front of building for sfmta muni power lines | $8,000 |
| [200711158255](https://www.permitgraph.org/p/200711158255) | Nov 15, 2007 | Never finaled: issued Nov 2007, no final | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st floor: addition of one monitoring module to the fire alarm system to provide monitoring of the ansul system. no work in units. | $1,000 |
| [200603317995](https://www.permitgraph.org/p/200603317995) | Mar 31, 2006 | Completed: final sign-off Feb 2007 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | add four devices for elevator recall due to elevator modernization | $12,000 |
| [200602144606](https://www.permitgraph.org/p/200602144606) | Feb 14, 2006 | Expired or cancelled: expired Mar 2007 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | non-structural demolition in preparation for elevator modernization to be performed under permit app 200512271072 | $5,000 |
| [200512271072](https://www.permitgraph.org/p/200512271072) | Dec 27, 2005 | Expired or cancelled: expired Feb 2009 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | modernize (e) elevator installation. comply with all aspects of title 24 accessibility requirements except for cab size and door opening, which are constrained by limitations of (e) construction. rep… | $90,000 |
| [200511027217](https://www.permitgraph.org/p/200511027217) | Nov 2, 2005 | Expired or cancelled: expired Mar 2007 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) | install ansul fire system, 15 of 22 flow system | $3,800 |
| [200302218000](https://www.permitgraph.org/p/200302218000) | Feb 21, 2003 | Completed: final sign-off Aug 2003 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of new fire alarm panel due to remodel on the 1st,3rd,4th, 5th & 6th floors | $45,000 |
| [200212234048](https://www.permitgraph.org/p/200212234048) | Dec 23, 2002 | Completed: final sign-off Aug 2003 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) | [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) | renovation of (e) tenant space commercial/area 1st floor to meeting room, bathrooms, lounge | $100,000 |
| [200112175365](https://www.permitgraph.org/p/200112175365) | Dec 17, 2001 | Completed: final sign-off Jul 2005 | [562 Sutter St](https://www.permitgraph.org/a/0284/010) |  | umb seismic upgrade special procedure with bolts plus @ 2/f to 7/f ada compliance work | $560,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Centric Construction Inc](https://www.permitgraph.org/contractor/centric-construction-inc-822465) (7), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (5), [Elements Of Hospitality Inc](https://www.permitgraph.org/contractor/elements-of-hospitality-inc-997266) (4), [Aaa Restaurant Fire Control/Dba Aaa Fire](https://www.permitgraph.org/contractor/aaa-restaurant-fire-control-dba-aaa-fire-719959) (2), [Narrowback Construction Co.](https://www.permitgraph.org/contractor/narrowback-construction-co-579655) (2), [Award Construction And Restoration Inc](https://www.permitgraph.org/contractor/award-construction-and-restoration-inc-922754), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363), [Incom Mechanical Inc](https://www.permitgraph.org/contractor/incom-mechanical-inc-517617), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216), [Synergy Project Mgmt Inc](https://www.permitgraph.org/contractor/synergy-project-mgmt-inc-644102), [Trainor Commercial Construction Inc.](https://www.permitgraph.org/contractor/trainor-commercial-construction-inc-453991)
- Architects: [Michael Stanton](https://www.permitgraph.org/professional/michael-stanton-C11562) (14), [Harvey Hacker](https://www.permitgraph.org/professional/harvey-hacker-C8520)
- Engineers: [Mark Robison](https://www.permitgraph.org/professional/mark-robison-E15095), [Ralph Teyssier](https://www.permitgraph.org/professional/ralph-teyssier-S3727)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0284/010.
