# 1126 Bush St

Block 0277, lot 007. Page: https://www.permitgraph.org/a/0277/007

- City's use: Multi-Family Residential
- Built: 1923
- Stories: 5
- Units: 33
- Rooms: 34 bedrooms, 33 bathrooms
- Building: 19,500 sq ft
- Lot: 5,000 sq ft
- Zoning: RC4
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

45 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202404099646](https://www.permitgraph.org/p/202404099646) | May 9, 2024 | In progress: filed May 2024, not yet issued | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Halyard Inc](https://www.permitgraph.org/contractor/halyard-inc-1049217) | upgrade fire alarm system to current codes, nfpa 72, to comply with sffc 1103.7.6.1 to provide low frequency sounds in sleeping areas. | $62,319 |
| [202311020009](https://www.permitgraph.org/p/202311020009) | Nov 2, 2023 | Expired or cancelled: cancelled Jun 2024 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Au Electric Corporation/Aec Alarms](https://www.permitgraph.org/contractor/au-electric-corporation-aec-alarms-381840) | install new wirelss low frequecy sounders in sleeping areas to comply with sffc 1103.7.6.1 at existing fa system | $57,000 |
| [202110221014](https://www.permitgraph.org/p/202110221014) | Oct 22, 2021 | Completed: final sign-off Jan 2022 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | #203. rehab kitchen and bathroom. no structural work, no moving walls. | $30,000 |
| [202110080165](https://www.permitgraph.org/p/202110080165) | Oct 8, 2021 | Completed: final sign-off May 2022 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | #604. convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer and dryer. | $40,000 |
| [202102084219](https://www.permitgraph.org/p/202102084219) | Feb 8, 2021 | Completed: final sign-off Apr 2021 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 601: replace washer/dryer at same location. no structural work.no moving walls. | $10,000 |
| [202003167187](https://www.permitgraph.org/p/202003167187) | Mar 16, 2020 | Completed: final sign-off Jul 2020 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 101: replace washer/dryer, remodel bathroom & kitchen. all work in-kind. | $25,000 |
| [M1195947](https://www.permitgraph.org/p/M1195947) | Feb 18, 2020 | Never finaled: issued Feb 2020, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [201911228037](https://www.permitgraph.org/p/201911228037) | Nov 22, 2019 | Completed: final sign-off Mar 2020 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739) | termite report 19617, dated 11/13/2019; remove termite/fungus damage at unit #101 subfloor; repair as necessary, refinish subfloor | $6,400 |
| [M981967](https://www.permitgraph.org/p/M981967) | Sep 19, 2018 | Never finaled: issued Sep 2018, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [201809190760](https://www.permitgraph.org/p/201809190760) | Sep 19, 2018 | Completed: final sign-off Feb 2019 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) | convert (e) kitchen to bedroom relocate kitchen, rehabilitate bathroom. install w/d maher na | $40,000 |
| [201807134589](https://www.permitgraph.org/p/201807134589) | Jul 13, 2018 | Completed: final sign-off Aug 2018 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) | revision to pa#2018-0601-0726 to change from unit#504 to unit#503. n/a for maher. |  |
| [201806010726](https://www.permitgraph.org/p/201806010726) | Jun 1, 2018 | Completed: final sign-off Aug 2018 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) | unit 504: bath and kitchen remodel. update plumbing and electrical to code as needed. | $40,000 |
| [201805290337](https://www.permitgraph.org/p/201805290337) | May 29, 2018 | Completed: final sign-off Nov 2018 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) | 5th floor unit 504 - convert (e) kitchen to (n) bedroom, relocate kitchen, rehabilitate (e) bathroom and install washer/dryer. n/a for maher. | $38,000 |
| [M903487](https://www.permitgraph.org/p/M903487) | Mar 22, 2018 | Never finaled: issued Mar 2018, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space w/mta |  |
| [201801259509](https://www.permitgraph.org/p/201801259509) | Jan 25, 2018 | Never finaled: issued Mar 2018, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) | unit 404 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom and install washer & dryer | $35,000 |
| [M857268](https://www.permitgraph.org/p/M857268) | Nov 17, 2017 | Never finaled: issued Nov 2017, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [M826447](https://www.permitgraph.org/p/M826447) | Aug 31, 2017 | Never finaled: issued Aug 2017, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [M810627](https://www.permitgraph.org/p/M810627) | Jul 18, 2017 | Never finaled: issued Jul 2017, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [201707111474](https://www.permitgraph.org/p/201707111474) | Jul 11, 2017 | Completed: final sign-off Oct 2017 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Canning Electric Inc](https://www.permitgraph.org/contractor/canning-electric-inc-710973) | excavating a 1'- 2" deep utility pit at ground floor in preparation for new switchgear. n/a ordinance #155-13 | $30,000 |
| [M608507](https://www.permitgraph.org/p/M608507) | Jul 29, 2015 | Never finaled: issued Jul 2015, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space permit |  |
| [201505186564](https://www.permitgraph.org/p/201505186564) | May 18, 2015 | Never finaled: issued Jun 2015, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Kwan Wo Ironworks Inc](https://www.permitgraph.org/contractor/kwan-wo-ironworks-inc-643621) | remodel 6th floor/unit # 603: relocate key plan, addition of new dishwasher, relocate the bathroom, addition of new washer & dryer. maher na | $30,000 |
| [M582807](https://www.permitgraph.org/p/M582807) | Apr 30, 2015 | Never finaled: issued Apr 2015, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space unit 605 |  |
| [201503241721](https://www.permitgraph.org/p/201503241721) | Mar 24, 2015 | Never finaled: issued Apr 2015, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Kwan Wo Ironworks Inc](https://www.permitgraph.org/contractor/kwan-wo-ironworks-inc-643621) | unit # 605 - 6th floor: renovation of (e) one-bed apt. in (e) bld to include relocation and remodel of kitchen and bathroom. the addition of 1 bedroom and addition of ventless washer/dryer. all renov… | $10,000 |
| [200804280730](https://www.permitgraph.org/p/200804280730) | Apr 28, 2008 | Completed: final sign-off Oct 2008 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | apt #501, kitchen & bathroom remodel, no structural work, no lighting work, remodel & replace cabinet counter floor & wall tiles, replace window bathroom lightwell in kind | $15,000 |
| [200803268009](https://www.permitgraph.org/p/200803268009) | Mar 26, 2008 | Completed: final sign-off Apr 2008 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | renew pa# 2006/09/29/3811 & pa# 2007/03/15/6314 for final inspection only. |  |
| [M99791](https://www.permitgraph.org/p/M99791) | Dec 19, 2007 | Never finaled: issued Dec 2007, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space permit only. |  |
| [200712069841](https://www.permitgraph.org/p/200712069841) | Dec 6, 2007 | Expired or cancelled: expired Apr 2011 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Frankie English Dba Doe Mabuhay Builders](https://www.permitgraph.org/contractor/frankie-english-dba-doe-mabuhay-builders-369048) | work on apt#500 &#504. kitchen and barhroom remodel. no structural work-no lighting work. replace window bathroom lighting in kind. .67 u factor max. | $30,000 |
| [200706113528](https://www.permitgraph.org/p/200706113528) | Jun 11, 2007 | Never finaled: issued Jun 2007, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | comply nov bid#200703148. apt#201-kitchen and bathroom remodel (new). apt3100-204-303-400-502-600-603-602. remodel without permit nov#200703143. no structural work -no lighting work0no window. | $114,000 |
| [M63907](https://www.permitgraph.org/p/M63907) | Apr 13, 2007 | Never finaled: issued Apr 2007, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [200703156314](https://www.permitgraph.org/p/200703156314) | Mar 15, 2007 | Never finaled: issued Mar 2007, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | apt#403. repair walls per nov#200795576. after plumbing and electrical work was done. apt#604. repair walls-after plumbing and electrical work was done comply nov. no structural work no lighting work… | $24,000 |
| [200701081151](https://www.permitgraph.org/p/200701081151) | Jan 8, 2007 | Completed: final sign-off May 2007 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | apt#304 (1) kitchen and (1) bathroom remodel. no structural no lighting work. | $15,000 |
| [200610205615](https://www.permitgraph.org/p/200610205615) | Oct 20, 2006 | Never finaled: issued Oct 2006, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | kitchen & bathroom remodel apt#.202,#205,#305,#402,#405,#601. no structural work no lighting work no window.to comply w/his nov#200672244 dted 08/31/06 | $90,000 |
| [M45066](https://www.permitgraph.org/p/M45066) | Oct 16, 2006 | Never finaled: issued Oct 2006, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [200609293811](https://www.permitgraph.org/p/200609293811) | Sep 29, 2006 | Never finaled: issued Sep 2006, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | in response to nov#200674031. this permit is to renovate the kitchen & bath in units #200, 203, 401, 505 and to install a new boiler serving the building | $60,000 |
| [200609182536](https://www.permitgraph.org/p/200609182536) | Sep 18, 2006 | Expired or cancelled: cancelled Aug 2022 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) | comply with nov 200672244 housing violation dated 8/31/06 routine inspection. comply with complaint #200674031 dated 8/31/06 legalize work performed. | $15,000 |
| [M39003](https://www.permitgraph.org/p/M39003) | Aug 14, 2006 | Never finaled: issued Aug 2006, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [200606204558](https://www.permitgraph.org/p/200606204558) | Jun 20, 2006 | Never finaled: issued Jun 2006, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Baywest Building***See Notes***](https://www.permitgraph.org/contractor/baywest-building-see-notes-870254) | replace cabinets, counter tops, new plumbing & new flooring. kitchen & bathroom remodel in units #205 & 300. | $12,000 |
| [200604249675](https://www.permitgraph.org/p/200604249675) | Apr 24, 2006 | Expired or cancelled: expired Nov 2006 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [California Constrution Co](https://www.permitgraph.org/contractor/california-constrution-co-519815) | reroofing. | $14,000 |
| [M34947](https://www.permitgraph.org/p/M34947) | Oct 21, 2005 | Never finaled: issued Oct 2005, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | street space |  |
| [200509284118](https://www.permitgraph.org/p/200509284118) | Sep 28, 2005 | Completed: final sign-off Nov 2005 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Western Builders](https://www.permitgraph.org/contractor/western-builders-428542) | replace damaged ornamintal sheet metal underneath (e)fire escape balcony and to correct nov #200449361 (item #2). ref.to appl#200508109876 | $12,500 |
| [200508109876](https://www.permitgraph.org/p/200508109876) | Aug 10, 2005 | Completed: final sign-off Nov 2005 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Western Builders](https://www.permitgraph.org/contractor/western-builders-428542) | request for exploratory permit. remove decorative sheetmetal cover under exist fire escape balcony. | $750 |
| [M33102](https://www.permitgraph.org/p/M33102) | Jun 23, 2005 | Never finaled: issued Jun 2005, no final | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | streetspace |  |
| [200404141262](https://www.permitgraph.org/p/200404141262) | Apr 14, 2004 | Completed: final sign-off Jul 2004 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Olympic Restoration](https://www.permitgraph.org/contractor/olympic-restoration-653870) | repair water damage,replace probably 300s.f.drywall on walls area,replace flooring,install toilet/ | $18,000 |
| [200308111683](https://www.permitgraph.org/p/200308111683) | Aug 11, 2003 | Completed: final sign-off Nov 2003 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) | [Olympic Restoration](https://www.permitgraph.org/contractor/olympic-restoration-653870) | water damage repairs drywall hardwood floor.vinyl floor & paint units#502,402,302,202 to comply w/ | $17,000 |
| [200301296246](https://www.permitgraph.org/p/200301296246) | Jan 29, 2003 | Completed: final sign-off Jun 2003 | [1126 Bush St](https://www.permitgraph.org/a/0277/007) |  | repair back stairs w/ treated wood or redwood,all repair items shall be replaced in kinds only 4 ste | $500 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [F B E And Sons General Const](https://www.permitgraph.org/contractor/f-b-e-and-sons-general-const-849336) (7), [Brighter Bay Builders Inc](https://www.permitgraph.org/contractor/brighter-bay-builders-inc-1023440) (5), [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) (4), [Kwan Wo Ironworks Inc](https://www.permitgraph.org/contractor/kwan-wo-ironworks-inc-643621) (2), [Olympic Restoration](https://www.permitgraph.org/contractor/olympic-restoration-653870) (2), [Western Builders](https://www.permitgraph.org/contractor/western-builders-428542) (2), [Au Electric Corporation/Aec Alarms](https://www.permitgraph.org/contractor/au-electric-corporation-aec-alarms-381840), [Baywest Building***See Notes***](https://www.permitgraph.org/contractor/baywest-building-see-notes-870254), [California Constrution Co](https://www.permitgraph.org/contractor/california-constrution-co-519815), [Canning Electric Inc](https://www.permitgraph.org/contractor/canning-electric-inc-710973), [Frankie English Dba Doe Mabuhay Builders](https://www.permitgraph.org/contractor/frankie-english-dba-doe-mabuhay-builders-369048), [Halyard Inc](https://www.permitgraph.org/contractor/halyard-inc-1049217), [Markoff Structural Pest Control](https://www.permitgraph.org/contractor/markoff-structural-pest-control-4739)
- Engineers: [Joe Win Kon](https://www.permitgraph.org/professional/joe-win-kon-S5425)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0277/007.