## Permits filed here

98 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202507030123](https://www.permitgraph.org/p/202507030123) | Jul 3, 2025 | In progress: filed Jul 2025, not yet issued | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | modification to (e) telecommunications facility t-mobile antennas; remove (e) 6102 cabinet; replace 2 smaller cabinet b160 & 6160 within (e) lease space; remove 3 (e) antennas per sector and replace… | $45,000 |
| [202507030122](https://www.permitgraph.org/p/202507030122) | Jul 3, 2025 | In progress: filed Jul 2025, not yet issued | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | modification to existing t mobile wireless facion building rooftop.remove 6 e antennas and replace with 4 new antennsas. install n radios. n angenna mounts.remove 8 e coax, remove e tmas. remove 1 e… | $10,000 |
| [202503242877](https://www.permitgraph.org/p/202503242877) | Apr 10, 2025 | In progress: issued Aug 2025 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | install (3) clip-lv devices in the basement electrical space. replace (36) existing panel boards and (4) existing motor control center with new. all misc. electrical work. | $1,250,000 |
| [202405142113](https://www.permitgraph.org/p/202405142113) | Jun 18, 2024 | In progress: issued Oct 2024 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | secure the terracotta facing from coming loose and falling that have been impacted by water leaks at mechanical louvers. this phase will address a portion of the front facade/pine st. elevation. | $1,000,000 |
| [202211106284](https://www.permitgraph.org/p/202211106284) | Nov 10, 2022 | In progress: issued Nov 2025 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the eq… | $100,000 |
| [201804166427](https://www.permitgraph.org/p/201804166427) | Apr 16, 2018 | Completed: final sign-off Apr 2018 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | as built for 201711083448. demo partial sprinkler branch line lateral @ future outside location. extend (e) pre-action system to cover (e) i.t equip. room. demo (e) 4" ground 90 elbow install new gro… |  |
| [201802151355](https://www.permitgraph.org/p/201802151355) | Feb 15, 2018 | Never finaled: issued Feb 2018, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher. | $20,000 |
| [201711083448](https://www.permitgraph.org/p/201711083448) | Nov 8, 2017 | Completed: final sign-off Apr 2018 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) | demo partial (e) sprinkler branch line located @ future outside location. extend (e) preaction system to cover (e) i.t. equipment space.demo (e) 4" grooved 90 elbow install new grooved 4" tee fitting… | $171,740 |
| [201710312759](https://www.permitgraph.org/p/201710312759) | Oct 31, 2017 | Completed: final sign-off Oct 2018 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 1st fl fa: new: (4) new vesda units, (7) new smoke detectors, (3) new heat detectors, (6) monitoring modules, (1) control relay, (12) speaker stroves, (4) strobes. relocate: (1) speaker strove, (1) s… | $15,000 |
| [201707242698](https://www.permitgraph.org/p/201707242698) | Jul 24, 2017 | Completed: final sign-off Nov 2017 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 1 new vespa unit,control relays for fan/fsd shutdown, 2 m\new smoke detectoers, 2 new duct detectors, add 1 replace 1 speaker strobe maher not req | $5,000 |
| [201706098944](https://www.permitgraph.org/p/201706098944) | Jun 9, 2017 | Completed: final sign-off Nov 2018 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | 1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, ne… | $4,700,000 |
| [201704184183](https://www.permitgraph.org/p/201704184183) | Apr 18, 2017 | Completed: final sign-off Jul 2018 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Building Services/System Maintenance Inc](https://www.permitgraph.org/contractor/building-services-system-maintenance-inc-870303) | architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada work | $139,000 |
| [201703131318](https://www.permitgraph.org/p/201703131318) | Mar 13, 2017 | Never finaled: issued Mar 2017, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 6th flr relocate branch line and 2 fire sprinkler ref 2016-1118-3123 maher na | $1,280 |
| [201611183123](https://www.permitgraph.org/p/201611183123) | Nov 18, 2016 | Completed: final sign-off Dec 2017 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | replace an air handler on the 6th floor. maher na | $450,000 |
| [M730347](https://www.permitgraph.org/p/M730347) | Oct 14, 2016 | Never finaled: issued Oct 2016, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit - renewal of permit # m710208 |  |
| [M726247](https://www.permitgraph.org/p/M726247) | Sep 29, 2016 | Never finaled: issued Sep 2016, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [201609167930](https://www.permitgraph.org/p/201609167930) | Sep 16, 2016 | Never finaled: issued Oct 2016, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher na | $50,000 |
| [201608023940](https://www.permitgraph.org/p/201608023940) | Aug 2, 2016 | Completed: final sign-off Dec 2016 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Enterprise Roofing Service Inc](https://www.permitgraph.org/contractor/enterprise-roofing-service-inc-221274) | reroofing | $921,842 |
| [M710208](https://www.permitgraph.org/p/M710208) | Aug 2, 2016 | Never finaled: issued Aug 2016, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [201602099095](https://www.permitgraph.org/p/201602099095) | Feb 9, 2016 | Completed: final sign-off Jan 2017 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Bangar Construction Corp.](https://www.permitgraph.org/contractor/bangar-construction-corp-580320) | install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher na | $150,000 |
| [201512104747](https://www.permitgraph.org/p/201512104747) | Dec 10, 2015 | Never finaled: issued Apr 2016, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | 8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinance | $20,000 |
| [M461547](https://www.permitgraph.org/p/M461547) | Feb 5, 2014 | Never finaled: issued Feb 2014, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [M396027](https://www.permitgraph.org/p/M396027) | May 21, 2013 | Never finaled: issued May 2013, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and mta parking and sidewalk repair |  |
| [201109084178](https://www.permitgraph.org/p/201109084178) | Sep 8, 2011 | Completed: final sign-off Sep 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | create, install evacuation maps at elevator lobby, entrance to stairwell, entrance to elevator lobby & entrances to bldg. typical 7th., 12th., 13th., 15th. & 16th. floors. | $2,500 |
| [201105065494](https://www.permitgraph.org/p/201105065494) | May 6, 2011 | Completed: final sign-off May 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | comply w/complaint #200992644 - umbrella permit under s.f high rise building fire sprinkler retrofit ordinance #337-93 |  |
| [201104214546](https://www.permitgraph.org/p/201104214546) | Apr 21, 2011 | Completed: final sign-off May 2013 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facili… | $75,000 |
| [201103081592](https://www.permitgraph.org/p/201103081592) | Mar 8, 2011 | Never finaled: issued Mar 2011, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 1st thru 16th floors-install heat smoke detectors in the pipe chases, upgrade system shall include the following: add 16 new photo smoke detectors, add 16 new heat detectors, 32 detector bases | $54,867 |
| [M244826](https://www.permitgraph.org/p/M244826) | Mar 3, 2011 | Never finaled: issued Mar 2011, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space & parking meter |  |
| [201102109983](https://www.permitgraph.org/p/201102109983) | Feb 10, 2011 | Completed: final sign-off May 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | install a dual input module for rms monitoring on the 17th fl. reference permit application 201010072530 for chiller permit. | $7,957 |
| [M236467](https://www.permitgraph.org/p/M236467) | Jan 12, 2011 | Never finaled: issued Jan 2011, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and mta |  |
| [201101078086](https://www.permitgraph.org/p/201101078086) | Jan 7, 2011 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | 16th floor-removal of wall mounted fall protection eye bolt from ti scope of work, 201006184827. identify fall protection tie off points at columns h4 and j4 |  |
| [M235926](https://www.permitgraph.org/p/M235926) | Jan 7, 2011 | Never finaled: filed Jan 2011, never issued | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  |  |  |
| [201012176923](https://www.permitgraph.org/p/201012176923) | Dec 17, 2010 | Completed: final sign-off Mar 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | floors 1 through 5 & 7 - add sprinkler in pipe chase; floors 8 through 16 - add sprinkler in pipe chase & above restrooms in attic space. | $24,000 |
| [M233066](https://www.permitgraph.org/p/M233066) | Dec 14, 2010 | Never finaled: issued Dec 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space & meter |  |
| [201012146665](https://www.permitgraph.org/p/201012146665) | Dec 14, 2010 | Never finaled: issued Dec 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 17th & 18th floors-relocate 2 fire sprinkler branch lines around new hvac ductwork | $1,120 |
| [201012136546](https://www.permitgraph.org/p/201012136546) | Dec 13, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | 8th floor:fire alarm upgrade. add 5 new photoelectric smoke detectors. 5 detector bases. | $6,324 |
| [201011295685](https://www.permitgraph.org/p/201011295685) | Nov 29, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | remove 5-fire sprinkler lines & sprinkler in telecom equipment room. | $1,120 |
| [M229167](https://www.permitgraph.org/p/M229167) | Nov 15, 2010 | Never finaled: issued Nov 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and mta |  |
| [M224049](https://www.permitgraph.org/p/M224049) | Oct 7, 2010 | Never finaled: issued Oct 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [201010072530](https://www.permitgraph.org/p/201010072530) | Oct 7, 2010 | Completed: final sign-off May 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | demolish retired i place dhiller and replace with new modular chiller. relocate pumps to facilitate work. modify chilled water pipiing to relocate pumps and connect new chiller | $600,000 |
| [201010072496](https://www.permitgraph.org/p/201010072496) | Oct 7, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | 8th floor - modify ductwork for space including new ducting, demolition and controls. demolish fire sprinklers in space. install new early warning smoke detectors. | $150,000 |
| [201009291856](https://www.permitgraph.org/p/201009291856) | Sep 29, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | furnish/final & test the following devices; add (26)new photo elec. detectors. relocate (24) (e) smoke detectors. relocate (4) (e) junction boxes. | $20,145 |
| [M220586](https://www.permitgraph.org/p/M220586) | Sep 14, 2010 | Never finaled: issued Sep 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space & meter |  |
| [M219208](https://www.permitgraph.org/p/M219208) | Sep 2, 2010 | Never finaled: issued Sep 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and mat parking |  |
| [201008068278](https://www.permitgraph.org/p/201008068278) | Aug 6, 2010 | Completed: final sign-off Nov 2010 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | install (15) new fire sprinklers in 3 new telecom rooms. | $5,000 |
| [M214146](https://www.permitgraph.org/p/M214146) | Aug 3, 2010 | Never finaled: issued Aug 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit |  |
| [M211709](https://www.permitgraph.org/p/M211709) | Jul 19, 2010 | Never finaled: issued Jul 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and mta |  |
| [M209847](https://www.permitgraph.org/p/M209847) | Jul 6, 2010 | Never finaled: issued Jul 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space and sidewalk and mta |  |
| [M209346](https://www.permitgraph.org/p/M209346) | Jul 1, 2010 | Never finaled: issued Jul 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit & mta |  |
| [201006184827](https://www.permitgraph.org/p/201006184827) | Jun 18, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | at&t. office ti on the 16th floor. addition of office room and storage room. remodel men's restroom for adf compliance. work to include mech, elec, fire alarm, plumbing. | $85,000 |
| [201006084074](https://www.permitgraph.org/p/201006084074) | Jun 8, 2010 | Completed: final sign-off Jan 2011 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lighting | $1,000,000 |
| [201006013539](https://www.permitgraph.org/p/201006013539) | Jun 1, 2010 | Completed: final sign-off Aug 2010 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Balch Petroleum Contractors & Builders](https://www.permitgraph.org/contractor/balch-petroleum-contractors-builders-396575) | replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space. | $17,980 |
| [M201006](https://www.permitgraph.org/p/M201006) | May 7, 2010 | Never finaled: issued May 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit & mta |  |
| [M197271](https://www.permitgraph.org/p/M197271) | Apr 13, 2010 | Never finaled: issued Apr 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit & mta |  |
| [M191828](https://www.permitgraph.org/p/M191828) | Feb 25, 2010 | Never finaled: issued Feb 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [M189531](https://www.permitgraph.org/p/M189531) | Feb 1, 2010 | Never finaled: issued Feb 2010, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit |  |
| [200912032499](https://www.permitgraph.org/p/200912032499) | Dec 3, 2009 | Completed: final sign-off Sep 2010 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | chiller installation in basement. fa is required under separate permit. | $775,392 |
| [M171645](https://www.permitgraph.org/p/M171645) | Jul 8, 2009 | Never finaled: issued Jul 2009, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit; mta |  |
| [M163205](https://www.permitgraph.org/p/M163205) | May 5, 2009 | Never finaled: issued May 2009, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit only. |  |
| [200811176690](https://www.permitgraph.org/p/200811176690) | Nov 17, 2008 | Completed: final sign-off Dec 2008 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Transbay Fire Protection](https://www.permitgraph.org/contractor/transbay-fire-protection-629778) | to finalize work approved under pa#200509284174. |  |
| [200807318160](https://www.permitgraph.org/p/200807318160) | Jul 31, 2008 | Completed: final sign-off Dec 2008 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | 7th-15th floors-fire smoke dampers & 1-hr rated partition & ceiling. partial 7th & 15th floors. fire smoke dampers deletion where not required. delete the toilet room upgrade on 13th floor; 7th floor… | $200,000 |
| [M127287](https://www.permitgraph.org/p/M127287) | Jul 22, 2008 | Never finaled: issued Jul 2008, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [200708160055](https://www.permitgraph.org/p/200708160055) | Aug 16, 2007 | Completed: final sign-off Dec 2008 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | renewal pa 200507076998 | $25,100 |
| [M81367](https://www.permitgraph.org/p/M81367) | Aug 10, 2007 | Never finaled: issued Aug 2007, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit |  |
| [M63624](https://www.permitgraph.org/p/M63624) | Apr 11, 2007 | Never finaled: issued Apr 2007, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | streetspace |  |
| [M59023](https://www.permitgraph.org/p/M59023) | Feb 27, 2007 | Never finaled: issued Feb 2007, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit only. |  |
| [M53162](https://www.permitgraph.org/p/M53162) | Jan 8, 2007 | Never finaled: issued Jan 2007, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit only. |  |
| [M50322](https://www.permitgraph.org/p/M50322) | Dec 7, 2006 | Never finaled: issued Dec 2006, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit only. |  |
| [M43984](https://www.permitgraph.org/p/M43984) | Oct 4, 2006 | Never finaled: issued Oct 2006, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit only. |  |
| [M38527](https://www.permitgraph.org/p/M38527) | Jul 14, 2006 | Never finaled: issued Jul 2006, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit |  |
| [200602275501](https://www.permitgraph.org/p/200602275501) | Feb 27, 2006 | Completed: final sign-off Mar 2006 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | to erect non-electric wall single faced sign. | $6,000 |
| [200510276692](https://www.permitgraph.org/p/200510276692) | Oct 27, 2005 | Completed: final sign-off Dec 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | renew permit app 200206058302- for final inspection |  |
| [200509294332](https://www.permitgraph.org/p/200509294332) | Sep 29, 2005 | Completed: final sign-off Dec 2008 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) | install fire sprinklers(under separate sumittal).install fire smoke dampers in all (e) 1-hr rated partitions. unused non-rated rooms to be removed to smplify sprinkler retrofit on 3,7,8,15,17 etc. | $300,000 |
| [200509284174](https://www.permitgraph.org/p/200509284174) | Sep 28, 2005 | Never finaled: issued Feb 2006, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Transbay Fire Protection](https://www.permitgraph.org/contractor/transbay-fire-protection-629778) | extend (e) preaction systems throughout the building. | $325,000 |
| [200507076998](https://www.permitgraph.org/p/200507076998) | Jul 7, 2005 | Never finaled: issued Aug 2005, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | adding heat detectors, (36) heat detectors; (1) single input module (4) dual input module | $30,000 |
| [200505202989](https://www.permitgraph.org/p/200505202989) | May 20, 2005 | Completed: final sign-off Jun 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Mark Olson Electric](https://www.permitgraph.org/contractor/mark-olson-electric-284499) | renew app3200308142136 for final inspection. |  |
| [200505102038](https://www.permitgraph.org/p/200505102038) | May 10, 2005 | Completed: final sign-off Jun 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Tait Environmental Services Inc](https://www.permitgraph.org/contractor/tait-environmental-services-inc-588098) | remove/replace fuel piping underground. install monitoring | $40,000 |
| [200504018970](https://www.permitgraph.org/p/200504018970) | Apr 1, 2005 | Completed: final sign-off May 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | furnish & test f.a. system: (1) single input module, (1) double input module, (1)laser compact det. | $24,594 |
| [200503117351](https://www.permitgraph.org/p/200503117351) | Mar 11, 2005 | Completed: final sign-off Apr 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | install new refrigerant monitor system to serve basement chiller room.connect fire alarm system unde | $15,224 |
| [200411229844](https://www.permitgraph.org/p/200411229844) | Nov 22, 2004 | Completed: final sign-off Apr 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | provide monitoring of refrigerant leak detection panel to exist fire alarm control panel....... | $7,477 |
| [200410045852](https://www.permitgraph.org/p/200410045852) | Oct 4, 2004 | Completed: final sign-off Sep 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | renew of permit#200204164049 |  |
| [200409073475](https://www.permitgraph.org/p/200409073475) | Sep 7, 2004 | Completed: final sign-off Jun 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Tait Environmental Services Inc](https://www.permitgraph.org/contractor/tait-environmental-services-inc-588098) | remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building. | $100,000 |
| [200402196748](https://www.permitgraph.org/p/200402196748) | Feb 19, 2004 | Completed: final sign-off Apr 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | replacement of chiller located in bsmnt/replace 2 chilled water pumps | $275,000 |
| [200308142136](https://www.permitgraph.org/p/200308142136) | Aug 14, 2003 | Never finaled: issued Sep 2003, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | installation of 3 panel type antennas & 2 outdoor cabinets base transceiver stations on (e) roof. | $35,000 |
| [200206058302](https://www.permitgraph.org/p/200206058302) | Jun 5, 2002 | Expired or cancelled: expired Jan 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Kleeman Roebbelen Construction](https://www.permitgraph.org/contractor/kleeman-roebbelen-construction-737562) | construct 1-hr rated battery contaiment room on 13th fl of pacific bell central office. | $70,000 |
| [200204164049](https://www.permitgraph.org/p/200204164049) | Apr 16, 2002 | Never finaled: issued May 2002, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) | furnish, test fire detection system | $623,470 |
| [M19295](https://www.permitgraph.org/p/M19295) | Mar 13, 2002 | Expired or cancelled: expired Sep 2002 | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [200202068583](https://www.permitgraph.org/p/200202068583) | Feb 6, 2002 | Expired or cancelled: expired Jan 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | 6th & 11th floor - 1 smoke detector to exist autocall sle. | $7,000 |
| [200112275956](https://www.permitgraph.org/p/200112275956) | Dec 27, 2001 | Expired or cancelled: expired Jan 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Johnston Sign Company](https://www.permitgraph.org/contractor/johnston-sign-company-609593) | sign permit - electric, wall, single faced. |  |
| [M17596](https://www.permitgraph.org/p/M17596) | Nov 6, 2001 | Expired or cancelled: expired May 2002 | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [200106131483](https://www.permitgraph.org/p/200106131483) | Jun 13, 2001 | Expired or cancelled: expired Nov 2001 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Dalzell Corporation](https://www.permitgraph.org/contractor/dalzell-corporation-202440) | install nw 275 gallon day tank for generator in basement (lower basement). | $3,000 |
| [M16091](https://www.permitgraph.org/p/M16091) | May 2, 2001 | Expired or cancelled: expired Nov 2001 | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [M16043](https://www.permitgraph.org/p/M16043) | Apr 25, 2001 | Never finaled: issued Apr 2001, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space |  |
| [200103124023](https://www.permitgraph.org/p/200103124023) | Mar 12, 2001 | Expired or cancelled: expired Jan 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Peterson Power Systems Inc.](https://www.permitgraph.org/contractor/peterson-power-systems-inc-507000) | remove &replace emergency generator equip with new. | $85,000 |
| [200101290790](https://www.permitgraph.org/p/200101290790) | Jan 29, 2001 | Expired or cancelled: expired Jan 2005 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | monitoring of pre action sprinkler system on all floorsand monitoring of fire pump renewal of 982575 |  |
| [M15241](https://www.permitgraph.org/p/M15241) | Dec 29, 2000 | Never finaled: issued Dec 2000, no final | [555 Pine St](https://www.permitgraph.org/a/0270/040) |  | street space permit |  |
| [200011095320](https://www.permitgraph.org/p/200011095320) | Nov 9, 2000 | Completed: final sign-off May 2001 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) | one stop (archt. finishes,mechanical duct, electrical lighting voluntary upgrade of existing rooms | $100,000 |
| [200010112723](https://www.permitgraph.org/p/200010112723) | Oct 11, 2000 | Expired or cancelled: expired May 2001 | [555 Pine St](https://www.permitgraph.org/a/0270/040) | [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) | renew expired appl #9901178 |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Roebbelen Contracting Inc](https://www.permitgraph.org/contractor/roebbelen-contracting-inc-734124) (15), [Sabah International Incorporated](https://www.permitgraph.org/contractor/sabah-international-incorporated-381218) (10), [American Incorporated](https://www.permitgraph.org/contractor/american-incorporated-292529) (7), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) (5), [Simplex Grinnell*** See 802591****](https://www.permitgraph.org/contractor/simplex-grinnell-see-802591-280525) (3), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (2), [Tait Environmental Services Inc](https://www.permitgraph.org/contractor/tait-environmental-services-inc-588098) (2), [Transbay Fire Protection](https://www.permitgraph.org/contractor/transbay-fire-protection-629778) (2), [Walschon Fire Protection Inc](https://www.permitgraph.org/contractor/walschon-fire-protection-inc-568438) (2), [Balch Petroleum Contractors & Builders](https://www.permitgraph.org/contractor/balch-petroleum-contractors-builders-396575), [Bangar Construction Corp.](https://www.permitgraph.org/contractor/bangar-construction-corp-580320), [Building Services/System Maintenance Inc](https://www.permitgraph.org/contractor/building-services-system-maintenance-inc-870303), [Dalzell Corporation](https://www.permitgraph.org/contractor/dalzell-corporation-202440), [Enterprise Roofing Service Inc](https://www.permitgraph.org/contractor/enterprise-roofing-service-inc-221274), [Johnston Sign Company](https://www.permitgraph.org/contractor/johnston-sign-company-609593), [Kleeman Roebbelen Construction](https://www.permitgraph.org/contractor/kleeman-roebbelen-construction-737562), [Mark Olson Electric](https://www.permitgraph.org/contractor/mark-olson-electric-284499), [Peterson Power Systems Inc.](https://www.permitgraph.org/contractor/peterson-power-systems-inc-507000), [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796)
- Architects: [Joseph Gonzalez](https://www.permitgraph.org/professional/joseph-gonzalez-C19735) (2), [Gary Semling](https://www.permitgraph.org/professional/gary-semling-C21541), [Matthew Harris](https://www.permitgraph.org/professional/matthew-harris-C33395), [Scott Brady](https://www.permitgraph.org/professional/scott-brady-20296)
- Engineers: [Carl Crizer](https://www.permitgraph.org/professional/carl-crizer-M35859) (7), [For0ouhar Karampour](https://www.permitgraph.org/professional/for0ouhar-karampour-C48355) (2), [Andrew J. Strickland](https://www.permitgraph.org/professional/andrew-j-strickland-E20723), [Edward Ries](https://www.permitgraph.org/professional/edward-ries-M29041), [Hugh King](https://www.permitgraph.org/professional/hugh-king-E20539), [Jahandar Yadegar](https://www.permitgraph.org/professional/jahandar-yadegar-2871), [James Drummond](https://www.permitgraph.org/professional/james-drummond-E19043), [Jeffry Gosal](https://www.permitgraph.org/professional/jeffry-gosal-E18084), [John Chinn](https://www.permitgraph.org/professional/john-chinn-M23599), [Michael Grabowski](https://www.permitgraph.org/professional/michael-grabowski-22844), [Ronald Laurence](https://www.permitgraph.org/professional/ronald-laurence-34127), [Thomas Ewert](https://www.permitgraph.org/professional/thomas-ewert-S3931)
- Designers: [Gwenyth R. Searer](https://www.permitgraph.org/professional/gwenyth-r-searer-S4450)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.