# 250 Montgomery St

Block 0268, lot 019. Page: https://www.permitgraph.org/a/0268/019

- City's use: Commercial Office
- Built: 1986
- Stories: 17
- Rooms: 7 bathrooms
- Building: 111,778 sq ft
- Lot: 3,185 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

56 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202405303282](https://www.permitgraph.org/p/202405303282) | May 30, 2024 | In progress: issued May 2024 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evacuation maps on 4th fl. 3 maps total | $1,200 |
| [202212289247](https://www.permitgraph.org/p/202212289247) | Dec 28, 2022 | Completed: final sign-off Jul 2024 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | 2nd & 9th/flrs:install 6-new evacuation maps total. | $1,712 |
| [202208160568](https://www.permitgraph.org/p/202208160568) | Aug 16, 2022 | Completed: final sign-off Aug 2022 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | ti suite 200 relocate 5 pendent sprinklers; 17 upright sprinklers and delete 7 pendents. ref 202207259238 | $1,500 |
| [202001061250](https://www.permitgraph.org/p/202001061250) | Jan 6, 2020 | Completed: final sign-off Apr 2020 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evacuation maps on 11th fl. 3 maps total. | $914 |
| [201805159105](https://www.permitgraph.org/p/201805159105) | May 15, 2018 | Completed: final sign-off Jan 2019 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | emergency evacuation maps for 15th fl., total 3 maps | $895 |
| [201803123463](https://www.permitgraph.org/p/201803123463) | Mar 12, 2018 | Never finaled: issued Mar 2018, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | 14/f: fire sprinkler ti: 13 relocated pedent, 6 added pendent, 3 relocated upright, 1 added upright, 23 heads total ref app# 201801199018 | $9,772 |
| [201803083204](https://www.permitgraph.org/p/201803083204) | Mar 8, 2018 | Completed: final sign-off Jan 2019 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | 14th flr - evac 3 maps | $852 |
| [201803083203](https://www.permitgraph.org/p/201803083203) | Mar 8, 2018 | Completed: final sign-off Jan 2019 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | 12th flr - evac 3 maps | $852 |
| [201802272291](https://www.permitgraph.org/p/201802272291) | Feb 27, 2018 | Completed: final sign-off Oct 2018 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 14th floor - mech & elec to support approved architectural ti. also structural. ref pa 201801199018 | $134,000 |
| [201708316513](https://www.permitgraph.org/p/201708316513) | Aug 31, 2017 | Completed: final sign-off Sep 2017 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evacuation maps on the 3rd * 8th fl. (6) maps total. | $1,536 |
| [201708215393](https://www.permitgraph.org/p/201708215393) | Aug 21, 2017 | Completed: final sign-off Sep 2017 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | suite 610: relocate 5 pendent and 1 upright. ref #2017-0707-1218. maher na | $3,875 |
| [201706149302](https://www.permitgraph.org/p/201706149302) | Jun 14, 2017 | Completed: final sign-off Aug 2017 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evac maps. 3 on the 16th fl | $1,200 |
| [201703312861](https://www.permitgraph.org/p/201703312861) | Mar 31, 2017 | Completed: final sign-off Apr 2018 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evacuation maps, 3 maps on the 4th fl | $792 |
| [201610210910](https://www.permitgraph.org/p/201610210910) | Oct 21, 2016 | Completed: final sign-off Apr 2018 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | install new evac maps 3 maps on the 6th floor only maher na | $1,200 |
| [201606099507](https://www.permitgraph.org/p/201606099507) | Jun 9, 2016 | Completed: final sign-off May 2018 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 7th flr: add one (1) and relocate seven (7) fire sprinklers to conform with the new ceiling/wall layout of the tenant improvement. (re: 201603212648) | $4,160 |
| [201606079334](https://www.permitgraph.org/p/201606079334) | Jun 7, 2016 | Never finaled: issued Jun 2016, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 7th floor fire alarm improvement - install 5 ceiling mount speaker strobes. t.i. pa# 201603212648 | $2,000 |
| [201606079336](https://www.permitgraph.org/p/201606079336) | Jun 7, 2016 | Never finaled: issued Jun 2016, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | fire alarm improvement, install 3 ceiling mount speaker strobes, install 2 wall mount speaker strobes, relocate 3 smoke detectors to pan check. t.i. pa# 201603212648 | $3,200 |
| [201606069168](https://www.permitgraph.org/p/201606069168) | Jun 6, 2016 | Completed: final sign-off Jun 2017 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 7th floor - new lighting & branch circuiting to (e) panel, ca title 24 compliance forms. reuse some (e) power outlets. re-work ductwork & air balance to serve new zones. relocate thermostats as neede… |  |
| [201604296014](https://www.permitgraph.org/p/201604296014) | Apr 29, 2016 | Completed: final sign-off Apr 2018 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) | 5th, 7th, 10th floors: evac maps. maher na | $3,030 |
| [201603212649](https://www.permitgraph.org/p/201603212649) | Mar 21, 2016 | Completed: final sign-off Jul 2016 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 5th floor tenant improvement - demolition of existing partitions, millwork, ceiling & finishes in existing lobby & corridor.mep to be submitted under sep permit. | $195,000 |
| [201603212648](https://www.permitgraph.org/p/201603212648) | Mar 21, 2016 | Completed: final sign-off Jun 2016 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 7th floor interior tenant improvement for building management office, spec suite, elevator lobby, restrom upgrades & finishes. mep under sep permits. | $185,682 |
| [201603212645](https://www.permitgraph.org/p/201603212645) | Mar 21, 2016 | Completed: final sign-off Jun 2016 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 14th floor - demolition of existing partitoins, millwork, & floor finishes. finishes in lobby & corridor, unoccupied space as per ab-017. | $97,751 |
| [201601066420](https://www.permitgraph.org/p/201601066420) | Jan 6, 2016 | Completed: final sign-off Mar 2016 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 10th flr: interior tenant improvement for spec office suite on 10th flr includes restroom upgrades, mep and life safety,sprinkler under separate permit | $410,000 |
| [201510280969](https://www.permitgraph.org/p/201510280969) | Oct 28, 2015 | Never finaled: issued Oct 2015, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Certified Fire & Safety Co](https://www.permitgraph.org/contractor/certified-fire-safety-co-905771) | install up300 ansul fire system to protect kitchen hood, exhaust duct, and cooking equipment. ref pa 2015-0505-5353 | $6,000 |
| [201509177294](https://www.permitgraph.org/p/201509177294) | Sep 17, 2015 | Completed: final sign-off Dec 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | ti include new mec, electrical, plumbng & t-24 associated with separate permit pa 2015-0505-5353. maher na | $8,000 |
| [201508194735](https://www.permitgraph.org/p/201508194735) | Aug 19, 2015 | Completed: final sign-off Oct 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 1st floor: fire alarm t.i. install 4 ceiling mount speaker-strobes, 3 wall mount speaker-strobes, 4 duct detectors, 1 monitor module and 4 control relay modules. ref. appl. #2015.0505.5353. maher n/a. | $4,400 |
| [M611787](https://www.permitgraph.org/p/M611787) | Aug 6, 2015 | Never finaled: issued Aug 2015, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space |  |
| [201506098522](https://www.permitgraph.org/p/201506098522) | Jun 9, 2015 | Completed: final sign-off Oct 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | 1st floor - relocate (28), add (2) & plug (6) fire sprinklers. ref #2015.0505.5353. | $15,000 |
| [201506027744](https://www.permitgraph.org/p/201506027744) | Jun 2, 2015 | Completed: final sign-off Dec 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | 1st floor: new mechanical, electrical & plmg & t-24 associated with interior restaurant renovation under seperate permit #201505055353. no change to bldg structure. sprnklr, lifesafety and hood fire… | $250,000 |
| [201505055353](https://www.permitgraph.org/p/201505055353) | May 5, 2015 | Completed: final sign-off Dec 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | new interior comm'l t.i., new restaurant in (e) restaurant shell space (vacant) includes (n) kitchen, scullery, dining area & 1 (n) ada toilet. no change to exterior, no change to structural. mep, sp… | $350,000 |
| [201503241736](https://www.permitgraph.org/p/201503241736) | Mar 24, 2015 | Never finaled: issued Mar 2015, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) | interior soft demo only. remove fixtures, finishes, non structural partition walls | $3,500 |
| [201402047734](https://www.permitgraph.org/p/201402047734) | Feb 4, 2014 | Completed: final sign-off Feb 2014 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers relocate 9 pendent sprinklers in suite 780. t.i. #2014-0122-6801. compliance w/ ordinance no.155-13 not required. excavatopm <50 cu.yd. | $4,635 |
| [201401226801](https://www.permitgraph.org/p/201401226801) | Jan 22, 2014 | Completed: final sign-off Mar 2014 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 7th floor:new work consist of 2 new offices, doors, frames, and hardware. new millwork, new power, data and finishes throughout. space is currently unoccupied. any mep and sprinkler upgrades will be… | $20,000 |
| [201309176985](https://www.permitgraph.org/p/201309176985) | Sep 17, 2013 | Completed: final sign-off Jul 2014 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | basement level: per ab-017. demolition of interior non structural partitions and doors and construction of a new hallway on the basement level and doors and construction of a new hallway on the basem… | $35,000 |
| [201309176990](https://www.permitgraph.org/p/201309176990) | Sep 17, 2013 | Completed: final sign-off Aug 2015 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | basement level: scope of work consists of demolition of interior non structural partitions and construction of a new ada compliant restrooms and shower on bsmnt level & a new restibule on the on the… | $70,000 |
| [201206263425](https://www.permitgraph.org/p/201206263425) | Jun 26, 2012 | Completed: final sign-off Oct 2012 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | 12th floor #1200 - demolition of (1) partition & associated power/data, finishes throughout. mep & sprinkler system under separate permit. | $30,000 |
| [201111189201](https://www.permitgraph.org/p/201111189201) | Nov 18, 2011 | Completed: final sign-off Jun 2012 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | building entry, main lobby & elevator finish upgrades. build-out consists of new store front entrance system at same location as existing, new lighting and finish upgrades. mep and fire life safety u… | $250,000 |
| [201008168831](https://www.permitgraph.org/p/201008168831) | Aug 16, 2010 | Completed: final sign-off Apr 2011 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 15th floor - electrical lighting, power, tel/data & hvac. this work associated with pa #201007307845. | $30,000 |
| [201007307845](https://www.permitgraph.org/p/201007307845) | Jul 30, 2010 | Completed: final sign-off Apr 2011 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | office ti on the 15th floor ( full floor) incl. new offices, new conference room and new finishes in the elevator lobby and through out. mep and sprinklers under separate permit | $255,074 |
| [M198327](https://www.permitgraph.org/p/M198327) | Apr 20, 2010 | Never finaled: issued Apr 2010, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space & sidewalk permit |  |
| [M188726](https://www.permitgraph.org/p/M188726) | Jan 22, 2010 | Never finaled: issued Jan 2010, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit |  |
| [M188246](https://www.permitgraph.org/p/M188246) | Jan 15, 2010 | Never finaled: issued Jan 2010, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit |  |
| [M143865](https://www.permitgraph.org/p/M143865) | Nov 25, 2008 | Never finaled: issued Dec 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space only. |  |
| [200811035737](https://www.permitgraph.org/p/200811035737) | Nov 3, 2008 | Expired or cancelled: cancelled Jan 2026 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Starlite Electric Inc.](https://www.permitgraph.org/contractor/starlite-electric-inc-716595) | at 3rd fl: install 3 smoke detectors. | $2,500 |
| [M129345](https://www.permitgraph.org/p/M129345) | Aug 4, 2008 | Never finaled: issued Aug 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space |  |
| [M125153](https://www.permitgraph.org/p/M125153) | Jul 7, 2008 | Never finaled: issued Jul 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit only. |  |
| [M118573](https://www.permitgraph.org/p/M118573) | May 5, 2008 | Never finaled: issued May 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space |  |
| [M110244](https://www.permitgraph.org/p/M110244) | Mar 3, 2008 | Never finaled: issued Mar 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit only. |  |
| [M104705](https://www.permitgraph.org/p/M104705) | Jan 28, 2008 | Never finaled: issued Jan 2008, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit only. |  |
| [M98167](https://www.permitgraph.org/p/M98167) | Dec 5, 2007 | Never finaled: issued Dec 2007, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit |  |
| [M88989](https://www.permitgraph.org/p/M88989) | Oct 2, 2007 | Never finaled: issued Oct 2007, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space |  |
| [200709284069](https://www.permitgraph.org/p/200709284069) | Sep 28, 2007 | Expired or cancelled: cancelled Jan 2026 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | t/i in suites 610 & 620, new office spaces, storage area,extend 1 hour corridor.mep, sprinklers, fire alarm under sep. app | $120,000 |
| [200709284070](https://www.permitgraph.org/p/200709284070) | Sep 28, 2007 | Completed: final sign-off Feb 2008 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) | [Teamwrkx Inc.](https://www.permitgraph.org/contractor/teamwrkx-inc-841440) | demo accoustical ceiling corridor & replace 1 hour rated hard lid ceiling (lights, registers, sprinklers to remain untouched) | $15,000 |
| [M80927](https://www.permitgraph.org/p/M80927) | Aug 8, 2007 | Never finaled: issued Aug 2007, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit only. |  |
| [200706042914](https://www.permitgraph.org/p/200706042914) | Jun 4, 2007 | Expired or cancelled: expired Jun 2010 | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | upgrade existisnsg banner supports as shown on dwgs. | $2,500 |
| [M65236](https://www.permitgraph.org/p/M65236) | Apr 23, 2007 | Never finaled: issued Apr 2007, no final | [250 Montgomery St](https://www.permitgraph.org/a/0268/019) |  | street space permit only. |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Weidner Architectural Signage](https://www.permitgraph.org/contractor/weidner-architectural-signage-559090) (11), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (5), [Northern Sun Associates](https://www.permitgraph.org/contractor/northern-sun-associates-295897) (4), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) (4), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (3), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (3), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967), [Certified Fire & Safety Co](https://www.permitgraph.org/contractor/certified-fire-safety-co-905771), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Starlite Electric Inc.](https://www.permitgraph.org/contractor/starlite-electric-inc-716595), [Teamwrkx Inc.](https://www.permitgraph.org/contractor/teamwrkx-inc-841440), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639)
- Architects: [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609) (4), [Douglas Booth](https://www.permitgraph.org/professional/douglas-booth-C14737) (2), [Seth Boor](https://www.permitgraph.org/professional/seth-boor-C29019) (2), [Megan Mcguinn](https://www.permitgraph.org/professional/megan-mcguinn-C23785), [Virginie Manichon](https://www.permitgraph.org/professional/virginie-manichon-C32701)
- Engineers: [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894), [Sherry Chaumpluke](https://www.permitgraph.org/professional/sherry-chaumpluke-M34646)
- Authorized agents: [Patrick Duhain](https://www.permitgraph.org/professional/patrick-duhain-559090)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0268/019.