# 340 Pine St

Block 0260, lot 007. Page: https://www.permitgraph.org/a/0260/007

- City's use: Commercial Office
- Built: 1928
- Stories: 8
- Building: 61,632 sq ft
- Lot: 7,906 sq ft
- Zoning: C3O
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

49 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202012100764](https://www.permitgraph.org/p/202012100764) | Dec 10, 2020 | Never finaled: issued May 2021, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | demo (e) duct & hvac equipment. new duct & hvac equipment. reference to pa #201908027712 (deferred mep) |  |
| [202001091528](https://www.permitgraph.org/p/202001091528) | Jan 9, 2020 | Never finaled: issued Jan 2020, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd floor:rev to pa# 201908027712; this project involves modification of an (e) t.i. to include selective demo and construction of non load bearing partitions, new office doors & frames, new finishes… | $100,000 |
| [201911207729](https://www.permitgraph.org/p/201911207729) | Nov 20, 2019 | Completed: final sign-off Jun 2021 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 3 smoke detectors, 2 ceiling strobes, 9 ceiling speaker/strobes to be aded to (e) facu | $7,500 |
| [201910174724](https://www.permitgraph.org/p/201910174724) | Oct 17, 2019 | Completed: final sign-off Mar 2020 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2nd floor: fire sprinkler only- relocate 7 pendents and 43 uprights for spec suite . 2nd floor. | $25,000 |
| [201910154520](https://www.permitgraph.org/p/201910154520) | Oct 15, 2019 | Never finaled: issued Oct 2019, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 electrical for work under pa# 201908027712 |  |
| [201908027712](https://www.permitgraph.org/p/201908027712) | Aug 2, 2019 | Never finaled: issued Aug 2019, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd st - project involves modification of an existing tenant improvement to include selectrive demo and construction of non load bearing partitions, new office doors and frames, new millwork and sink… | $587,400 |
| [201612306314](https://www.permitgraph.org/p/201612306314) | Dec 30, 2016 | Never finaled: issued Dec 2016, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Air Systems, Inc.](https://www.permitgraph.org/contractor/air-systems-inc-855330) | removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinance | $95,000 |
| [201504163766](https://www.permitgraph.org/p/201504163766) | Apr 16, 2015 | Never finaled: issued Apr 2015, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | basement & grnd flr: removal of (e) finishes & rail at (e) stair to remain to be abandoned in place. (n) flr slab at grnd flr. & (n) partition at basement to encapsulate stair, providing new partitio… | $40,000 |
| [201503261991](https://www.permitgraph.org/p/201503261991) | Mar 26, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | basement/1st.mezz: new fire alarm devices added to ti in an (e) bld to include: (1) power supply, (1) control module, (4) relay modules, (1) pull station, (32) horn/strobes, (1) strobe. (2) smoke det… | $11,780 |
| [201503231541](https://www.permitgraph.org/p/201503231541) | Mar 23, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinance |  |
| [201503100335](https://www.permitgraph.org/p/201503100335) | Mar 10, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | sprinklers- ceilings changed - relocate (13)(e) ssp and add (2)(n) ssp, plug (2) (e) ssp - for removal of (e) ceilings change 34(e) ssp and add 3 to new ssu ref pa 2015 0206 7665 maher - not req'd | $10,000 |
| [201503100338](https://www.permitgraph.org/p/201503100338) | Mar 10, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) | for new wall, lights & ceilings - relocate (17)(e) ssp for removal of (e) ceilings change 10(e) ssp to new ssu ref pa 2015 0127 6929 maher - not req'd | $5,000 |
| [201502067665](https://www.permitgraph.org/p/201502067665) | Feb 6, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with mah… | $850,000 |
| [201501276729](https://www.permitgraph.org/p/201501276729) | Jan 27, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13 | $65,000 |
| [201501145753](https://www.permitgraph.org/p/201501145753) | Jan 14, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | demo only. ground floor, mezzanine. ab-017. high rise. | $30,000 |
| [201501085252](https://www.permitgraph.org/p/201501085252) | Jan 8, 2015 | Completed: final sign-off Nov 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinance | $30,000 |
| [201206223204](https://www.permitgraph.org/p/201206223204) | Jun 22, 2012 | Expired or cancelled: cancelled Feb 2014 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) | restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restr… | $300,000 |
| [201010223587](https://www.permitgraph.org/p/201010223587) | Oct 22, 2010 | Expired or cancelled: cancelled Mar 2015 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) | change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor. | $9,999 |
| [201001054149](https://www.permitgraph.org/p/201001054149) | Jan 5, 2010 | Never finaled: issued Jan 2010, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 5th floor-life safety system modifications-1 strobe light (wall mount), 3 horn/strobes (wall mount), 1 remote notification power supply, 1 dual sync module | $3,500 |
| [200912183541](https://www.permitgraph.org/p/200912183541) | Dec 18, 2009 | Never finaled: issued Dec 2009, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | 5th floor. relocate (4) sprinklers. | $4,200 |
| [200911161310](https://www.permitgraph.org/p/200911161310) | Nov 16, 2009 | Never finaled: issued Dec 2009, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | office ti on 5th fl. construct 2 offices. replace lights, minor elec, for future work stations. new carpet and paint. | $100,000 |
| [200706083415](https://www.permitgraph.org/p/200706083415) | Jun 8, 2007 | Expired or cancelled: cancelled Jan 2008 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Bay Construction Services Inc](https://www.permitgraph.org/contractor/bay-construction-services-inc-692035) | tenant improvement to (e) office space. remove non-structural interior partitions, construct new non-structural partitions, add new electrical for furniture systems. relocate light fixtures (no incre… | $75,000 |
| [200512089843](https://www.permitgraph.org/p/200512089843) | Dec 8, 2005 | Never finaled: issued Dec 2005, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | install a new spinkler system on 7th floor and mech room/tie-in to extg riser in stairway/extg riser | $28,000 |
| [200511178362](https://www.permitgraph.org/p/200511178362) | Nov 17, 2005 | Never finaled: issued Nov 2005, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | install aa new wet sprinkler system for 1st and mezzanine floors | $55,000 |
| [200510064882](https://www.permitgraph.org/p/200510064882) | Oct 6, 2005 | Expired or cancelled: expired Oct 2007 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | extend sprinkler system on 3rd fl and run a new sprinkler system on the 4th floor. | $55,000 |
| [200509213466](https://www.permitgraph.org/p/200509213466) | Sep 21, 2005 | Completed: final sign-off Dec 2005 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | reconfigure of 2 offices into 1 new office. paint, new carpet. minor relocate of outlets & lighting | $45,000 |
| [200509122591](https://www.permitgraph.org/p/200509122591) | Sep 12, 2005 | Completed: final sign-off Dec 2005 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | interior construction of 2 new, non-rated offices demolition of 2 offices, reconfiguration into 3. | $47,000 |
| [M32555](https://www.permitgraph.org/p/M32555) | May 19, 2005 | Never finaled: issued May 2005, no final | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | street space |  |
| [200407300262](https://www.permitgraph.org/p/200407300262) | Jul 30, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | remodel of existing toilets for compliance electrical plumbing and finishes barrier removal work | $85,000 |
| [200407289977](https://www.permitgraph.org/p/200407289977) | Jul 28, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | oti-2 6/f el, me | $85,000 |
| [200407158968](https://www.permitgraph.org/p/200407158968) | Jul 15, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | ti sprinkler work on 6th flr only for new ceiling and wall layout | $6,000 |
| [200406307667](https://www.permitgraph.org/p/200406307667) | Jun 30, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | oti-1,6th/fl-el, me,ls, sp. | $210,000 |
| [200405264887](https://www.permitgraph.org/p/200405264887) | May 26, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | fully sprinkler 6th floor only tie into existing supply in stairway. | $25,000 |
| [200405032844](https://www.permitgraph.org/p/200405032844) | May 3, 2004 | Completed: final sign-off Sep 2004 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | fully sprinkle entire 5th floor & make tie-in to existing riser in stairs. | $20,000 |
| [200404262272](https://www.permitgraph.org/p/200404262272) | Apr 26, 2004 | Expired or cancelled: expired Nov 2005 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | replace existing non working fire pump with new fire pump to match existing. new pump bipass and bac | $25,000 |
| [200211121142](https://www.permitgraph.org/p/200211121142) | Nov 12, 2002 | Expired or cancelled: expired Mar 2005 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | oti-1 3rd floor, el, me, ls, sp | $17,000 |
| [200105149045](https://www.permitgraph.org/p/200105149045) | May 14, 2001 | Expired or cancelled: cancelled Mar 2002 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [South Bay Construction](https://www.permitgraph.org/contractor/south-bay-construction-336974) | oti-2 4th floor, el | $4,000 |
| [200105149043](https://www.permitgraph.org/p/200105149043) | May 14, 2001 | Expired or cancelled: expired Sep 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [South Bay Construction](https://www.permitgraph.org/contractor/south-bay-construction-336974) | interior non-structural demolition only under this permit #401/404/405 | $4,000 |
| [200105149041](https://www.permitgraph.org/p/200105149041) | May 14, 2001 | Expired or cancelled: expired Nov 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [South Bay Construction](https://www.permitgraph.org/contractor/south-bay-construction-336974) | oti-1 4th floor, el, me, ls | $18,700 |
| [200101190151](https://www.permitgraph.org/p/200101190151) | Jan 19, 2001 | Expired or cancelled: expired Jan 2002 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | install new fire alarm system, monitor new fire pump, remove (e) fire alarm system | $75,000 |
| [200101179916](https://www.permitgraph.org/p/200101179916) | Jan 17, 2001 | Expired or cancelled: cancelled Oct 2003 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | install new backflow prevention & fire pump per plan. (e) fire pump to be removed from basement | $21,500 |
| [200011296761](https://www.permitgraph.org/p/200011296761) | Nov 29, 2000 | Expired or cancelled: expired Jun 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) | partial sprinkler system on 3rd fl | $7,100 |
| [200010183326](https://www.permitgraph.org/p/200010183326) | Oct 18, 2000 | Expired or cancelled: cancelled May 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Le Wentz Company And Wentz](https://www.permitgraph.org/contractor/le-wentz-company-and-wentz-304691) | oti-1, ground fl, el, me, ls, sp | $85,000 |
| [200009090074](https://www.permitgraph.org/p/200009090074) | Sep 9, 2000 | Expired or cancelled: expired Sep 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | tenant improvement remove (e) walls construct new walls provide new doors & lighting | $100,000 |
| [M13988](https://www.permitgraph.org/p/M13988) | Aug 8, 2000 | Expired or cancelled: expired Feb 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) |  | street space use |  |
| [200004177413](https://www.permitgraph.org/p/200004177413) | Apr 17, 2000 | Expired or cancelled: expired Sep 2000 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | oti-2 el 6th floor | $1,620 |
| [200004177437](https://www.permitgraph.org/p/200004177437) | Apr 17, 2000 | Completed: final sign-off May 2000 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Fire-Matic Systems Inc](https://www.permitgraph.org/contractor/fire-matic-systems-inc-267284) | relocate 2 fire sprinklers, add 1 fire sprinkler | $1,500 |
| [200004177412](https://www.permitgraph.org/p/200004177412) | Apr 17, 2000 | Expired or cancelled: expired May 2001 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) | oti-1 6th floor el, me, l/s | $33,580 |
| [200002242651](https://www.permitgraph.org/p/200002242651) | Feb 24, 2000 | Completed: final sign-off May 2000 | [340 Pine St](https://www.permitgraph.org/a/0260/007) | [South Bay Construction](https://www.permitgraph.org/contractor/south-bay-construction-336974) | oti 1 me l/s basement | $55,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Dpw Inc.](https://www.permitgraph.org/contractor/dpw-inc-684939) (9), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (6), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (4), [South Bay Construction](https://www.permitgraph.org/contractor/south-bay-construction-336974) (4), [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) (2), [Plant Construction Co, Lp](https://www.permitgraph.org/contractor/plant-construction-co-lp-995375) (2), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (2), [Roebuck Construction](https://www.permitgraph.org/contractor/roebuck-construction-797773) (2), [Sure Fire Protection](https://www.permitgraph.org/contractor/sure-fire-protection-751161) (2), [Air Systems, Inc.](https://www.permitgraph.org/contractor/air-systems-inc-855330), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700), [Bay Construction Services Inc](https://www.permitgraph.org/contractor/bay-construction-services-inc-692035), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779), [Fire-Matic Systems Inc](https://www.permitgraph.org/contractor/fire-matic-systems-inc-267284), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Le Wentz Company And Wentz](https://www.permitgraph.org/contractor/le-wentz-company-and-wentz-304691)
- Architects: [Tim Murphy](https://www.permitgraph.org/professional/tim-murphy-C27780) (4), [Dan Huntsman](https://www.permitgraph.org/professional/dan-huntsman-C9255) (2), [Ashley G Miller](https://www.permitgraph.org/professional/ashley-g-miller-C27238), [Colleen Mahoney](https://www.permitgraph.org/professional/colleen-mahoney-C15359)
- Engineers: [Rodolfo Bustos](https://www.permitgraph.org/professional/rodolfo-bustos-M37462)

---