# 425 California St

Block 0260, lot 001. Page: https://www.permitgraph.org/a/0260/001

- City's use: Commercial Office
- Built: 1968
- Stories: 26
- Units: 1
- Rooms: 52 bathrooms
- Building: 206,191 sq ft
- Lot: 7,656 sq ft
- Zoning: C3O
- Construction type: A

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

The 200 most recent permits filed for this property.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202508072597](https://www.permitgraph.org/p/202508072597) | Aug 7, 2025 | In progress: filed Aug 2025, not yet issued | [425 California St](https://www.permitgraph.org/a/0260/001) |  | install (4) additional antennas on (e) verizon wireless rooftop facility | $30,000 |
| [202411255624](https://www.permitgraph.org/p/202411255624) | Nov 25, 2024 | Completed: final sign-off Jul 2025 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | new electric, single faced wall chase sign | $15,000 |
| [202312293284](https://www.permitgraph.org/p/202312293284) | Dec 29, 2023 | Completed: final sign-off Jan 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 22/f: install (13) ceiling mount speaker strobes. install (3) smoke detectors. install (1) duct detector. install (2) control relays. arch ref ti# 202307111907 mech ref# 202311100583 | $3,996 |
| [202312182660](https://www.permitgraph.org/p/202312182660) | Dec 18, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | ste #2200: new lighting and power. ref permit# 202307111907 | $159,286 |
| [202312011744](https://www.permitgraph.org/p/202312011744) | Dec 1, 2023 | Completed: final sign-off Dec 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 7th floor. as-builts pa# 202310249290, install 1 additional speaker/ strobe. ref ti pa# 202307252868 & mech # 202309287579. | $660 |
| [202311100583](https://www.permitgraph.org/p/202311100583) | Nov 10, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | 22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct… | $84,239 |
| [202310319823](https://www.permitgraph.org/p/202310319823) | Oct 31, 2023 | Completed: final sign-off Jan 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | ti improvement to (e) fire sprinkler system. ti 202307111907. relocated concealted sprinkler 59, added sprinkler 01, deleted sprinkler 07. | $18,500 |
| [202310249290](https://www.permitgraph.org/p/202310249290) | Oct 24, 2023 | Completed: final sign-off Dec 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 15-ceiling mount strobes, ref bpa arch 202307252868 & mech 202309287579 | $9,900 |
| [202309287579](https://www.permitgraph.org/p/202309287579) | Sep 28, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908) | deferred mech and electrical. ref 202307252868 202308315717. mech, demo install newduct annd hvac equip, dual ductboxes, exhaust fans, ddc controls, air balance. ele new power and data new lighting a… | $150,000 |
| [202308315717](https://www.permitgraph.org/p/202308315717) | Aug 31, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908) | 7/f: revision to pa# 202307252868, revised mens's restroom layout, removal of extra convenience urinal to reflect normal building standard layout. mep and fire/life safety under separate permit. |  |
| [202308255248](https://www.permitgraph.org/p/202308255248) | Aug 25, 2023 | Completed: final sign-off Sep 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 1 control relay, install 2 door holders | $1,998 |
| [202308224917](https://www.permitgraph.org/p/202308224917) | Aug 22, 2023 | Completed: final sign-off Oct 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 7/f: add (4), relocate (45) f/s per t.i., ref bpa#202307252868 | $13,284 |
| [202307252868](https://www.permitgraph.org/p/202307252868) | Jul 25, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908) | interior tenant improvement: demo of non-structural partitions and finishes, new partitions, and finishes with accessibility uprgrades, mep and fire/life safety under separate permit | $374,888 |
| [202307111907](https://www.permitgraph.org/p/202307111907) | Jul 11, 2023 | Completed: final sign-off Mar 2024 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Contractors Llc.](https://www.permitgraph.org/contractor/cahill-contractors-llc-1011738) | interior tentant improvement demolition of non-structural partitions, new partitons finishes and restroom accessibilty upgrades | $1,000,000 |
| [202306220588](https://www.permitgraph.org/p/202306220588) | Jun 22, 2023 | Never finaled: issued Jun 2023, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 24/f: install 1-flush mount call station and 1-sign, relocate 1-ceiling mount speaker strobe, ref two-way comm backbone 202301200441. | $1,375 |
| [202306089567](https://www.permitgraph.org/p/202306089567) | Jun 8, 2023 | Never finaled: issued Jun 2023, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a | $50,000 |
| [202306019070](https://www.permitgraph.org/p/202306019070) | Jun 1, 2023 | Never finaled: issued Jun 2023, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 24/f: interior t.i. demolition of non-structural partitions, new partitions, finishes, mechanical deferred. | $98,800 |
| [202301200441](https://www.permitgraph.org/p/202301200441) | Jan 20, 2023 | Completed: final sign-off Mar 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install the following: (1) rath command center (2500-56xrc) includes (1) surface mount base station + (1) group of distribution modules; install (1) rath desk mount substation (2500-56xd), (1) comman… | $7,260 |
| [202212228989](https://www.permitgraph.org/p/202212228989) | Dec 22, 2022 | Completed: final sign-off Oct 2023 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872) | installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers. | $65,000 |
| [202212138161](https://www.permitgraph.org/p/202212138161) | Dec 13, 2022 | Completed: final sign-off Dec 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install 1 ceiling mount speaker strobe ref 2022110545913, 202211106258 | $660 |
| [202211176736](https://www.permitgraph.org/p/202211176736) | Nov 17, 2022 | Completed: final sign-off Nov 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | fire sprinkler relocate 5 add 1 and delete 1 sprinkler on the 16th fl. | $2,000 |
| [202211106258](https://www.permitgraph.org/p/202211106258) | Nov 10, 2022 | Completed: final sign-off Apr 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste 1600 - 16th flr - mechanical and electrical work for ti. ref pa 2022-1104-5913. | $45,000 |
| [202211045913](https://www.permitgraph.org/p/202211045913) | Nov 4, 2022 | Completed: final sign-off Apr 2023 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 16/f: t.i., demo nonstructural partitions, new partitions, finishes & restroom accessibility upgrades | $313,000 |
| [202209162586](https://www.permitgraph.org/p/202209162586) | Sep 16, 2022 | Completed: final sign-off Oct 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 12/f: install 4 ceiling mount speaker strobes. remove and replace 2 ceiling mount speaker strobes. ref arch 202208231104, mech 202209082051 | $3,960 |
| [202209082043](https://www.permitgraph.org/p/202209082043) | Sep 8, 2022 | Completed: final sign-off Sep 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | suite 1250: relocate 2 pendents, add 1 pendent. ref ti 202208231104 | $382 |
| [202209082051](https://www.permitgraph.org/p/202209082051) | Sep 8, 2022 | Completed: final sign-off Nov 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | suite 1250: mechanical & electrical work for t.i. ref bpa#202208231104 | $35,000 |
| [202208231104](https://www.permitgraph.org/p/202208231104) | Aug 23, 2022 | Completed: final sign-off Nov 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste 1250: interior tenant improvement: demolition of non-structural partitions. new partitions, finishes, and lighting. | $124,250 |
| [202206216653](https://www.permitgraph.org/p/202206216653) | Jun 21, 2022 | Never finaled: issued Dec 2022, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Ravig Inc Dba Salient Global Technologi](https://www.permitgraph.org/contractor/ravig-inc-dba-salient-global-technologi-1058024) | verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap su… | $40,000 |
| [202205244889](https://www.permitgraph.org/p/202205244889) | May 24, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 20th fl ste 2000: fire life safety. install 6 ceiling mounts speaker strobes. ref arch pa# 202203281023. ref mech pa# 202205164286. | $3,960 |
| [202205164286](https://www.permitgraph.org/p/202205164286) | May 16, 2022 | Completed: final sign-off Jul 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste 2000: mep for tenant improvement to include: replace 5 existing mixing assemblies, exhaust fan. replace pneumatic control system. new lighting, controls, and power. ref pa# 202203281023. | $25,000 |
| [202204252881](https://www.permitgraph.org/p/202204252881) | Apr 25, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | ste 2300: fire life safety - install 1 ceiling mount speaker strobe. arch ref pa# 202203240796. | $660 |
| [202204202618](https://www.permitgraph.org/p/202204202618) | Apr 20, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 20th/f-ste 2000: relocate existing pendents in order to update coverage for buildout. ref t.i. 202203281023 | $1,500 |
| [202204202617](https://www.permitgraph.org/p/202204202617) | Apr 20, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | 23rd/f: relocate 2 pendent sprinker heads. add 2 pendent sprinker heads. ref t.i. 202203240796 | $2,000 |
| [202204142205](https://www.permitgraph.org/p/202204142205) | Apr 14, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 23/f: electrical for t.i., new power/signal devices new 2019 title 24 compliant lighting & controls. ref pa#202203240796. | $5,000 |
| [202203281023](https://www.permitgraph.org/p/202203281023) | Mar 28, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste 2000: interior tenant improvement: new non-structural partitions, doors, glazing frames & hardware. m.e.p., fiee safety under separate permit. | $450,000 |
| [202203240754](https://www.permitgraph.org/p/202203240754) | Mar 24, 2022 | Completed: final sign-off Apr 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | suite 2100: fire life safety: install 5 ceiling mount speaker strobes. ref pa 202111303282. | $3,300 |
| [202203240796](https://www.permitgraph.org/p/202203240796) | Mar 24, 2022 | Completed: final sign-off Jun 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste 2300. interior tenant improvement; minor updates new non structural partitions, finishes and lighting, mep, fire and life safety under sep permit. | $305,000 |
| [202203079345](https://www.permitgraph.org/p/202203079345) | Mar 7, 2022 | Completed: final sign-off Mar 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | suite 2100 21/f: relocate 12 pendent fire sprinklers on the 21/f. ref t.i. pa202201115771. maher n/a | $6,000 |
| [202201115771](https://www.permitgraph.org/p/202201115771) | Jan 11, 2022 | Completed: final sign-off May 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | ste:2100: mechanical and electrical work for tenant improvement on the 21st floor. ref arch 202111303282 | $175,000 |
| [202112154448](https://www.permitgraph.org/p/202112154448) | Dec 15, 2021 | Never finaled: issued Dec 2021, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | suite 2025: install 2 ceiling mount speaker strobe fire life safety device. maher n/a. | $1,320 |
| [202111303282](https://www.permitgraph.org/p/202111303282) | Nov 30, 2021 | Completed: final sign-off May 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | interior tenant improvement, new finishes and fixtures. new non struc tural partitions, finish upgrades in e restroom. mep, fire life safety under sep permit | $500,000 |
| [202110190742](https://www.permitgraph.org/p/202110190742) | Oct 19, 2021 | Completed: final sign-off Feb 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | ste 2025. interior tenant improvement: new non structural partition, new finishes and lighting. mep & fire life safety under sep permit | $60,000 |
| [202110140475](https://www.permitgraph.org/p/202110140475) | Oct 14, 2021 | Never finaled: issued Oct 2021, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | install new 1 ton mini split sytem to cool existing it closet. it closet is normally unoccupied. | $16,494 |
| [202109228926](https://www.permitgraph.org/p/202109228926) | Sep 22, 2021 | Completed: final sign-off Feb 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 15/f: title 24 compliances: new lighting fixtures & controles w/in tenant space. 2 new duplex receptacles & teledate outlets in office, remove (e) air handing unit start, replace new vfd. |  |
| [202107224890](https://www.permitgraph.org/p/202107224890) | Jul 22, 2021 | Completed: final sign-off Feb 2022 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | interior t.i.: mew finishes, fixtures & lighting. mep, fire and life safety uner separate permit. | $130,000 |
| [202104269363](https://www.permitgraph.org/p/202104269363) | Apr 26, 2021 | Completed: final sign-off Sep 2021 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | voluntary repair/replacement of diesel driven fire pump in kind including electric isolation of pump and connection of new pump to new controller. remove and replace existing pump housekeeping pad. e… | $209,154 |
| [202007099905](https://www.permitgraph.org/p/202007099905) | Jul 9, 2020 | Completed: final sign-off Aug 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 14/f, suite 400: as built for relocation of existing smoke detectors to it/server room. ref pa #202002114112 | $7,800 |
| [202003116772](https://www.permitgraph.org/p/202003116772) | Mar 11, 2020 | Never finaled: issued Mar 2020, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | electrical work for ti at suite 400. ref arch #201912300898 | $35,000 |
| [202002215046](https://www.permitgraph.org/p/202002215046) | Feb 21, 2020 | Completed: final sign-off Nov 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th flr - mechanical work for tenant improvement at suite 400. ref arch 201912300898. | $22,000 |
| [202002215095](https://www.permitgraph.org/p/202002215095) | Feb 21, 2020 | Completed: final sign-off Aug 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 4th fl, ste 410 ti demo of non-structural partitions & finishes, new non-structural partitions & finishes. mech & elec and fire life safety under separate permit | $139,000 |
| [202002114112](https://www.permitgraph.org/p/202002114112) | Feb 11, 2020 | Completed: final sign-off Aug 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 14th fl, ste 400 - fire alarm ti add 10 speaker strobes & 1 speaker only ref pa 2019-1230-0898 | $7,800 |
| [202002114110](https://www.permitgraph.org/p/202002114110) | Feb 11, 2020 | Completed: final sign-off Apr 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 14th fl, ste 1400 - as built for pa 2019-1227-0826 remove control from design. added 2 smoke detectors on floor plan for door holder |  |
| [202002114065](https://www.permitgraph.org/p/202002114065) | Feb 11, 2020 | Completed: final sign-off Apr 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 4th fl - fire sprinklers, relocate 23 pendents, 1 upright in suite 400 4th fl upgrade end of line bracing ref ti 201912300898 | $12,000 |
| [202002033330](https://www.permitgraph.org/p/202002033330) | Feb 3, 2020 | Completed: final sign-off Aug 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 electrical for work under pa# 201910174873 |  |
| [202001282890](https://www.permitgraph.org/p/202001282890) | Jan 28, 2020 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | mech for 1400: new air distribution added to serve new space, new vav boxes (10), and (1) new fsd added. ref pa #201910174872. | $109,879 |
| [202001151895](https://www.permitgraph.org/p/202001151895) | Jan 15, 2020 | Never finaled: issued Jan 2020, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | ref pa# 201910174872; fire sprinklers as-built; new layout on fl. n/a maher | $1,000 |
| [201912300898](https://www.permitgraph.org/p/201912300898) | Dec 30, 2019 | Completed: final sign-off Nov 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | interoir ti including demo of non structural partitions and finishes, new non structural partitions, millwork finishes. mech, elec, plumb, fire ls deferred | $565,650 |
| [201912270826](https://www.permitgraph.org/p/201912270826) | Dec 27, 2019 | Never finaled: issued Jan 2020, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alar ti on 14th fl add 14 speaker strobes, 1 duct detector for fsd with control, 1 control relay for smoke guard ref 201910174872 | $13,000 |
| [201912129325](https://www.permitgraph.org/p/201912129325) | Dec 12, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 14/f: ref pa# 201910174872; fire sprinkers relocate 31 pendant sprinklers and 31 upright sprinklers on the 14th fl. n/a maher | $32,550 |
| [201912119190](https://www.permitgraph.org/p/201912119190) | Dec 11, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) | suite #1400: title 24 lighting only. reference pa# 2019-1017-4872 |  |
| [201911076711](https://www.permitgraph.org/p/201911076711) | Nov 7, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | ste: 300 - ref pa# 201908169025; install (10) new vav boxes, (1) new fsd, and new air distribution to serve new space plan. n/a maher | $122,064 |
| [201911056418](https://www.permitgraph.org/p/201911056418) | Nov 5, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) | ste 300: title 24 lighting only. ref pa #201908169025 |  |
| [201910174872](https://www.permitgraph.org/p/201910174872) | Oct 17, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices | $1,200,000 |
| [201910174873](https://www.permitgraph.org/p/201910174873) | Oct 17, 2019 | Completed: final sign-off Aug 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | suite 810. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit | $141,660 |
| [201910154458](https://www.permitgraph.org/p/201910154458) | Oct 15, 2019 | Completed: final sign-off Dec 2019 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm suite 300 add 2 smoke det, 1 duct det for fsd w control, 1 relay for security interface, 1 relay for door holder, 2 sync modules, 16 ceiling speaker strobes, 2 speakers maher not req | $1,700 |
| [201909050700](https://www.permitgraph.org/p/201909050700) | Sep 5, 2019 | Completed: final sign-off Nov 2019 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers: relocate 32 pendent sprinklers and 30 uprights on the 3rd fl. ref ti #201908169025. | $32,550 |
| [201908169025](https://www.permitgraph.org/p/201908169025) | Aug 16, 2019 | Completed: final sign-off Feb 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na | $1,000,000 |
| [201907236611](https://www.permitgraph.org/p/201907236611) | Jul 23, 2019 | Completed: final sign-off Aug 2019 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 26th flr, fire sprinklers. relocate 52 endents sprinklers and 4 uprights.ref pa 2019-0507-9944 | $29,400 |
| [201907014810](https://www.permitgraph.org/p/201907014810) | Jul 1, 2019 | Completed: final sign-off Aug 2019 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 26th fl - fire alarm ti - add 1 smoke detector, 18 speaker strobes & 12 speakers. ref pa 2019-0507-9944 | $15,000 |
| [201906264512](https://www.permitgraph.org/p/201906264512) | Jun 26, 2019 | Completed: final sign-off Nov 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 26th flr. t-24 mechanical and electrical for work for pa 201905079944 |  |
| [201905079944](https://www.permitgraph.org/p/201905079944) | May 7, 2019 | Completed: final sign-off Nov 2020 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | tenant improvement demo of non structural partitoins, new finishes, lighting, mep, fire, ls, sprinkler under sep permit | $1,000,000 |
| [201811196296](https://www.permitgraph.org/p/201811196296) | Nov 19, 2018 | Completed: final sign-off May 2019 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | building lobby improvements, new furring walls, finishes and security desk | $100,000 |
| [201804025195](https://www.permitgraph.org/p/201804025195) | Apr 2, 2018 | Never finaled: issued Aug 2019, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Ericsson Inc Dba E U S Inc](https://www.permitgraph.org/contractor/ericsson-inc-dba-e-u-s-inc-698896) | retain existing antennas. remove 8 remote radio units (rru) remove 8 existing rrus, install 16 rrus, elocate 8 e duplexes from shelter to antennas, retain 4 raycaps retain 4 existing hybrid cables | $25,000 |
| [201802211854](https://www.permitgraph.org/p/201802211854) | Feb 21, 2018 | Completed: final sign-off Mar 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | suite 1700 17th floor: fire alarm t.i. add 1 smoke detector for new door holder. n/a for maher. ref app#201708084229 | $600 |
| [201712055490](https://www.permitgraph.org/p/201712055490) | Dec 5, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm ti on 24th floor - relocate 3 speaker strobes & add 1 control relay for card reader. ref 2017-0921-9222. maher n/a. | $600 |
| [201711214476](https://www.permitgraph.org/p/201711214476) | Nov 21, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | partial scope - office tenant retrofit - lighting, power and signal, wiring, lightings and controls. ref pa 2017-0921-9222. maher na | $22,500 |
| [201711204396](https://www.permitgraph.org/p/201711204396) | Nov 20, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate 14 pendents ref pa 2017-0921-9222. n/a for maher | $5,950 |
| [201711073374](https://www.permitgraph.org/p/201711073374) | Nov 7, 2017 | Completed: final sign-off Dec 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm as built for app#201710252194. n/a for maher |  |
| [201711063136](https://www.permitgraph.org/p/201711063136) | Nov 6, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 17th floor suite 1700 fire alarm per t.i. - replace 1 existing power supply with new, add 14 speaker strobes, replace 2 speaker strobes, add 4 ceiling speakers only & 1 duct detector w/control relay… | $13,000 |
| [201710262342](https://www.permitgraph.org/p/201710262342) | Oct 26, 2017 | Completed: final sign-off Nov 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 26th floor fire sprinklers - relcoate 3 pendent sprinklers. ref t.i. #201709279762. n/a maher ordiance | $1,500 |
| [201710252194](https://www.permitgraph.org/p/201710252194) | Oct 25, 2017 | Completed: final sign-off Dec 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 26th floor fire alarm t.i. - add 1 control relay for card reader & demo 1 strobe. ref pa #2017-0927-9762. n/a maher ordinance | $600 |
| [201710232013](https://www.permitgraph.org/p/201710232013) | Oct 23, 2017 | Never finaled: issued Nov 2017, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 26th floor: install low pressure ductwork, install new supply grill, install new return grill, re balance to values shown on m2.1. ref app#201709279762. n/a for maher | $130,000 |
| [201710171385](https://www.permitgraph.org/p/201710171385) | Oct 17, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | partial - scope office tenant retrofit: lighting, power and signal, wiring, lightng and controls. ref pa 2017-0808-4229. maher na | $32,000 |
| [201710171421](https://www.permitgraph.org/p/201710171421) | Oct 17, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | suite 1700 - revision to pa #201708084229 - project includes providing one additional urinal at mens restroom. n/a maher ordinance |  |
| [201710100743](https://www.permitgraph.org/p/201710100743) | Oct 10, 2017 | Completed: final sign-off Nov 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | fire sprinkler permits. relocate 57 sprinklers on the 17th floor. t.i pa# 201708084229. maher na | $12,500 |
| [201709279762](https://www.permitgraph.org/p/201709279762) | Sep 27, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 26th floor: t.i. includes new non-load bearing partitions, and relocation of extg light fixtures. n/a for maher | $15,000 |
| [201709219222](https://www.permitgraph.org/p/201709219222) | Sep 21, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 24/f #2400- selective demo of (e) partitions, doors/frames, power/tile/data, lighting & millwork. construct (n) partitions, (n) power, (n) lighting fixtures, (n) millwork & finishes. minor ada upgrad… | $200,000 |
| [201708084229](https://www.permitgraph.org/p/201708084229) | Aug 8, 2017 | Completed: final sign-off Jan 2018 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | suite demo partitions, doors/frames, power, ceilng/ltg, plmg fix. millwork & finishes. constctn of partitions power, ceilg/ltg, millwork & fnsh. nw buildout of accessible restrooms to achieve full ba… | $200,000 |
| [201612074333](https://www.permitgraph.org/p/201612074333) | Dec 7, 2016 | Completed: final sign-off Dec 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | ste. 1200 - relocation of interior store front on 26th fl | $5,000 |
| [201611162894](https://www.permitgraph.org/p/201611162894) | Nov 16, 2016 | Completed: final sign-off Nov 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm ti on 2st floor. add (e) strobes & 1 speaker. ref pa 2016-0715-2504. maher na | $2,000 |
| [201608175282](https://www.permitgraph.org/p/201608175282) | Aug 17, 2016 | Completed: final sign-off Mar 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 16th floor - fire alarm. add (20 speaker strobes in conference room. ref. t.i. #2015-0903-6040. | $1,000 |
| [201608175228](https://www.permitgraph.org/p/201608175228) | Aug 17, 2016 | Completed: final sign-off Nov 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate (6) pendents and remove (1) pendents ti pa 2016-0630-1347 | $5,989 |
| [201607263345](https://www.permitgraph.org/p/201607263345) | Jul 26, 2016 | Never finaled: issued Aug 2016, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | modification of (e) hvac system to match new layout air balance maher na | $4,000 |
| [201607263347](https://www.permitgraph.org/p/201607263347) | Jul 26, 2016 | Never finaled: issued Aug 2016, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | partial scope office ti retrofit: lighting, power, signal, wiring, lighting & receptacle controls maher na |  |
| [201607152504](https://www.permitgraph.org/p/201607152504) | Jul 15, 2016 | Completed: final sign-off Dec 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883) | 21st floor - remove (e) partition, new folding partition (e) conference room. convert (e) conference into two offices. open (e) conference room to main office. mechanical, plumbing, life safety and s… | $100,000 |
| [201606301347](https://www.permitgraph.org/p/201606301347) | Jun 30, 2016 | Completed: final sign-off Nov 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 16th floor: build out 5 office with ele & ceiling lights; mep/fire/life safety deffered; maher na. ref t.i. 201509036040 | $25,000 |
| [201604134691](https://www.permitgraph.org/p/201604134691) | Apr 13, 2016 | Completed: final sign-off May 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Wavcomm Inc](https://www.permitgraph.org/contractor/wavcomm-inc-724434) | verizon wireless - remove (e) antenna - replace with (8) antennas; remove 16 7/8" coax, (3) hybrid cables, ret calbe; install (8) a2; install (1) 6/12 hybrid cable; insall (3) recaps & antennas (3) i… | $21,000 |
| [201603253104](https://www.permitgraph.org/p/201603253104) | Mar 25, 2016 | Completed: final sign-off Oct 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | replace (e) chiller with new. same location and lighter weight. n/a ordinance #155-13 | $600,000 |
| [201601207416](https://www.permitgraph.org/p/201601207416) | Jan 20, 2016 | Completed: final sign-off Jan 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 16th floor as-built revision: updated point to show actual field devices. n/a maher ordinance |  |
| [201512285956](https://www.permitgraph.org/p/201512285956) | Dec 28, 2015 | Completed: final sign-off Apr 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) | 3 fire evacuation plan signs for the 16th floor. | $1,100 |
| [201512044247](https://www.permitgraph.org/p/201512044247) | Dec 4, 2015 | Completed: final sign-off Mar 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 mechanical for work done under pa 2015-0903-6040. maher na adding one fsd | $43,000 |
| [201511122352](https://www.permitgraph.org/p/201511122352) | Nov 12, 2015 | Completed: final sign-off Dec 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinklers: relocate 62 pendent sprinklers on the 16th floor. maher na | $31,930 |
| [201511061996](https://www.permitgraph.org/p/201511061996) | Nov 6, 2015 | Completed: final sign-off Mar 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t-24 electrical for work done under pa#201509036040. n/a ordinance #155-13 | $95,000 |
| [201511041653](https://www.permitgraph.org/p/201511041653) | Nov 4, 2015 | Never finaled: issued Nov 2015, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | add 11 speaker/strobe, 3 strobes, 2 smokes, 2 control relays, 1 duct detector. maher na | $15,000 |
| [201510220517](https://www.permitgraph.org/p/201510220517) | Oct 22, 2015 | Completed: final sign-off Oct 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 6/f: adding 2 new speaker/strobes to replace existing strobe only. no t.i. n/a ordinance #155-13 | $5,500 |
| [201509036040](https://www.permitgraph.org/p/201509036040) | Sep 3, 2015 | Completed: final sign-off Mar 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 16th floor demo of (e) partitions,doors,frames,power/tele/data, ceiling/lighting, plumb fixts & millwork. construction of (n) partitions,power/tele/date, ceiling & light fixts, millwork, finishes. ne… | $200,000 |
| [201507070755](https://www.permitgraph.org/p/201507070755) | Jul 7, 2015 | Completed: final sign-off Jul 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | fire sprinkler only. relocate 7 fire sprinkler pendents for "metabiota" on the 2nd fl. ref #201505287343. | $3,500 |
| [201506249844](https://www.permitgraph.org/p/201506249844) | Jun 24, 2015 | Completed: final sign-off Jan 2017 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | t24 electric for work done under 201505287343. maher not req | $46,000 |
| [201506229528](https://www.permitgraph.org/p/201506229528) | Jun 22, 2015 | Completed: final sign-off Jan 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 19th floor - m.e.p. work for pa #2015.0529.7489. n/a maher ordinance | $25,000 |
| [201506189259](https://www.permitgraph.org/p/201506189259) | Jun 18, 2015 | Completed: final sign-off Jul 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | adding 6 speaker/strobes to existing system. t.i. pa#201505287343. n/a ordinance #155-13 | $5,500 |
| [201506048046](https://www.permitgraph.org/p/201506048046) | Jun 4, 2015 | Completed: final sign-off Jul 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 19th floor: adding one new speaker/strobe to new conference room and removing 2 extg strobes. n/a for maher. | $4,500 |
| [201505297489](https://www.permitgraph.org/p/201505297489) | May 29, 2015 | Completed: final sign-off Jan 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 19th floor: revision to app#201411181817 original of work with additional construction of 8 new offices. new electrical and light relocation. n/a for the maher. | $10,000 |
| [201505287343](https://www.permitgraph.org/p/201505287343) | May 28, 2015 | Completed: final sign-off Nov 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 2nd floor: project consists of minor demolition of partitions & finishes, & constructions of nw partitions, nw power nw tel/dat relocation of light fixtures & associated ceiling items, & reconfigure… | $57,660 |
| [201505277229](https://www.permitgraph.org/p/201505277229) | May 27, 2015 | Completed: final sign-off Jul 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) | 6th floor fire evacuation plan signs. total of three signs. n/a maher | $350 |
| [201504224347](https://www.permitgraph.org/p/201504224347) | Apr 22, 2015 | Completed: final sign-off Aug 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | revision to pa#201503060137 to provide wall sconce j-box detail @ 2 hr. rated plaster elevator shaft wall. this is being provided per in field direction by fire inspector general james. n/a ordinance… |  |
| [201504204039](https://www.permitgraph.org/p/201504204039) | Apr 20, 2015 | Completed: final sign-off Jul 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | ref pa # 2015 0306 0137: adding 3 smoke detectors. 13 speakers /strobes, 2 strobes, 2 control relays & 2 interposing replays | $7,500 |
| [201504133435](https://www.permitgraph.org/p/201504133435) | Apr 13, 2015 | Completed: final sign-off May 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) | three 19th floor fire evacuation plan signs. n/a maher ordinance | $600 |
| [201504012518](https://www.permitgraph.org/p/201504012518) | Apr 1, 2015 | Completed: final sign-off May 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | relocate 30 pendents; add 6 pendents. relocate 25 uprights and plug off 9 outlets. total 61 fire sprinklers | $30,500 |
| [201503261915](https://www.permitgraph.org/p/201503261915) | Mar 26, 2015 | Completed: final sign-off Apr 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | adding 1 smoke detector, provide coverage for fsd, 1 control relay, interface to fsd, relocate a/v notification to cover new office rooms. revising pa#201501125440 t.i. pa#201411181817. n/a ordinance… | $500 |
| [201503130754](https://www.permitgraph.org/p/201503130754) | Mar 13, 2015 | Expired or cancelled: cancelled Jan 2026 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | revision to pa#201411181817 original scope of work with additional mechanical relief work at vestibule. n/a ordinance #155-13 |  |
| [201503060137](https://www.permitgraph.org/p/201503060137) | Mar 6, 2015 | Completed: final sign-off Aug 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 6th floor: new partitions, nw power and teledata, nw ceiling and light fixtures & nw millwork & finishes. also includes new bld out of accessible restrms to achieve full barrier removal with associat… | $350,000 |
| [201502128229](https://www.permitgraph.org/p/201502128229) | Feb 12, 2015 | Never finaled: issued Mar 2015, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 19th floor:revision to app#2014-1118-1817 for construction of 2 offices, one conference, 3 meeting rooms, one telecom and 1 copy room. life safety and sprinkler under separate permit. n/a for the mah… |  |
| [201502047449](https://www.permitgraph.org/p/201502047449) | Feb 4, 2015 | Completed: final sign-off Apr 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 19th flr: fire sprinkler t.i. permit 201501125476 as built permit; old work relocate/change 48 heads, adds 6 heads total 54 heads; total of 3 added sprinklers maher n/a |  |
| [201501125476](https://www.permitgraph.org/p/201501125476) | Jan 12, 2015 | Completed: final sign-off Apr 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler t.i. under permit# 2014-0811-3509. relocate or change 48 heads. add 3 heads. 51 heads total. | $26,246 |
| [201501125440](https://www.permitgraph.org/p/201501125440) | Jan 12, 2015 | Completed: final sign-off May 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 19th floor - add to existing loop 13 speaker/strobes & 1 strobe also 2 smoke det's, 1 relay & 1 interposing relay. ref pa #2014.1118.1817. n/a maher ordinance | $7,500 |
| [201411212181](https://www.permitgraph.org/p/201411212181) | Nov 21, 2014 | Completed: final sign-off Dec 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | submitting as-builts to reflect added dor holder and smoke detectors refer to permit 201409186662 noted by inspector on 11/17; maher n/a | $200 |
| [201411181817](https://www.permitgraph.org/p/201411181817) | Nov 18, 2014 | Completed: final sign-off Jan 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 19th flr: project consist of construction of (n) partitions,(n)power & tele/data,(n) ceiling & light fixtures, & (n) millwork & finishes, also include (n) buildout of accessible restrooms for full ba… | $200,000 |
| [201411181812](https://www.permitgraph.org/p/201411181812) | Nov 18, 2014 | Completed: final sign-off Mar 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 6th flr: project consist of demo of partitions, millwork, finishes & associated electrical, plumbing and ceiling work, including full demo of restrooms on a currently vacant floor, no modification of… | $35,000 |
| [201410078273](https://www.permitgraph.org/p/201410078273) | Oct 7, 2014 | Never finaled: issued Oct 2014, no final | [425 California St](https://www.permitgraph.org/a/0260/001) |  | evacuation plan on the 9th fl | $1,200 |
| [201409186662](https://www.permitgraph.org/p/201409186662) | Sep 18, 2014 | Completed: final sign-off Nov 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 9th flr: adding 8 speaker/strobes & (2) strobes to be tied into existing system. ref 201406249300; maher n/a | $7,500 |
| [201408295092](https://www.permitgraph.org/p/201408295092) | Aug 29, 2014 | Completed: final sign-off Sep 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti 9th floor suite 950: add 3 , 31 relocate 31, total 34.ref app#201406249300. n/a for the maher ordinance #155-14 | $17,497 |
| [201408113509](https://www.permitgraph.org/p/201408113509) | Aug 11, 2014 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 19th flr: project consist of demo of partitions, millwork, finishes & associated elec, plumbing & ceiling work, including full demo of restrooms on a currently vacant floor, no modification of (e) me… | $35,000 |
| [201407100856](https://www.permitgraph.org/p/201407100856) | Jul 10, 2014 | Completed: final sign-off Feb 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 26th floor: adding one new strobe, 2 new relays and relocate 2 extg speakers. ref app#201406097834. n/a for the maher ordinance #155-13 | $5,000 |
| [201407010161](https://www.permitgraph.org/p/201407010161) | Jul 1, 2014 | Completed: final sign-off Jul 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | revising drawingins to reflect change an address of 2 smoke detector and a change to the cd setting at 5 horn/strobes already approval under permit appl. 2014.05.30.7055. maher n/a. | $200 |
| [201406249300](https://www.permitgraph.org/p/201406249300) | Jun 24, 2014 | Completed: final sign-off Dec 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | suite 950: demo of 2 tenant suites on 7th fl. new walls n elevator lobby, power and tele data, ceiling light fixtures and millwork & finishes. full demo of restrooms. buildout of access restrooms, fu… | $200,000 |
| [201406198848](https://www.permitgraph.org/p/201406198848) | Jun 19, 2014 | Completed: final sign-off Jun 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) | fire evacuation plan signs for 10/f & 11/f renovation. n/a ordinance #155-13. 6 total | $1,000 |
| [201406178575](https://www.permitgraph.org/p/201406178575) | Jun 17, 2014 | Never finaled: issued Jun 2014, no final | [425 California St](https://www.permitgraph.org/a/0260/001) |  | 26th floor suite 2600 tenant imrpvement - relocate 7 heads. ref pa #2014.0609.7834. n/a maher ordinance | $3,598 |
| [201406097834](https://www.permitgraph.org/p/201406097834) | Jun 9, 2014 | Never finaled: issued Jun 2014, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 26th flr: tenant improvement to include addition of one private office and separation wall at trading desk; compliance with ord 155-13 not required | $8,000 |
| [201405307055](https://www.permitgraph.org/p/201405307055) | May 30, 2014 | Completed: final sign-off Jul 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | include adding (4) speakers/strobes, (2) strobe & (2) smokes with (2) control relays and (1) interpassjng relay. (1) duct detector for fsd reference mech pa#2014.0425.4172; compliance with ord 155-13… | $7,500 |
| [201404254172](https://www.permitgraph.org/p/201404254172) | Apr 25, 2014 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) | replace (e) diffusers, re-zone based on partition changes. t.i.pa# 201402289577. n/a ordinance #155-13. | $20,000 |
| [201404213697](https://www.permitgraph.org/p/201404213697) | Apr 21, 2014 | Completed: final sign-off Jun 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | fire sprinkler permit, relocate 41, add 19 and delete 25 pendent, sprinklers on the 10th floor, t.i. pa#201404039577. re-cal'd for flex drops. n/a ordinance #155-13 | $30,840 |
| [201403049780](https://www.permitgraph.org/p/201403049780) | Mar 4, 2014 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th floor evac signage as required, 3 signs total. | $500 |
| [201402289577](https://www.permitgraph.org/p/201402289577) | Feb 28, 2014 | Completed: final sign-off Feb 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interi… | $300,000 |
| [201402108196](https://www.permitgraph.org/p/201402108196) | Feb 10, 2014 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | install and relocate grilles and air distribution. 48 new light fixtures. associated with 201311262828 | $24,000 |
| [201401246977](https://www.permitgraph.org/p/201401246977) | Jan 24, 2014 | Completed: final sign-off Feb 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 2nd floor: suite 200: adding 2 speakers, relocating one extg smoke det., and 4 speaker/strobes. t.i. app#201311262828. n/a for maher ordinance no. 155-13. | $7,000 |
| [201401216666](https://www.permitgraph.org/p/201401216666) | Jan 21, 2014 | Completed: final sign-off Jul 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1 add, 6 relocate , and 1 remove. reference ti 2013.1126.2828 | $3,598 |
| [201401025465](https://www.permitgraph.org/p/201401025465) | Jan 2, 2014 | Completed: final sign-off Feb 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | revision to app#201309126628. revised 4th and 18th floor evacuation plan signs. (6 signs) |  |
| [201312204703](https://www.permitgraph.org/p/201312204703) | Dec 20, 2013 | Completed: final sign-off Mar 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | add & relocate fire sprinkler heads per tenant improvements (add 5) (relocate 54)) 5th floor. ref pa 201311010857 | $30,326 |
| [201312194550](https://www.permitgraph.org/p/201312194550) | Dec 19, 2013 | Completed: final sign-off Mar 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 5th floor:t.i. work to include reloction of 1 extg smoke det., adding 15 speaker/strobes, adding 11 speakers, adding 2 new smoke det. and adding 1 duct det, 2 control relay, and 1 interposing relay.… | $7,500 |
| [201312063524](https://www.permitgraph.org/p/201312063524) | Dec 6, 2013 | Completed: final sign-off Dec 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 5th floor - mechanical & electrical work associated with t.i.#201311010857 minor demo of hvac & new lighting. | $75,000 |
| [201311262828](https://www.permitgraph.org/p/201311262828) | Nov 26, 2013 | Completed: final sign-off Feb 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 2nd floor - demolitoin of full floor tenant suite, construction to include (n) tenant partitions, (n) power & tele/data, (n) eciling & light fixtures, (n) millwork & finishes. space is currently unoc… | $175,000 |
| [201311152059](https://www.permitgraph.org/p/201311152059) | Nov 15, 2013 | Completed: final sign-off Oct 2015 | [425 California St](https://www.permitgraph.org/a/0260/001) | [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117) | verizon wireless proposes to replace 4 (e) 4' antennas w/ 4 (n) 4' aws antennas, 1 per sector, add 8 (n) rrh units, 4 (n) raycaps, hybrid cables & ret cables and one new conduit. | $18,000 |
| [201311010857](https://www.permitgraph.org/p/201311010857) | Nov 1, 2013 | Completed: final sign-off Mar 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | selective demolition of full floor tenant suite build out of 2 adjacent suites. new tenant and demising partitions, entry doors with associated corridor extension, new power and tele/data, ceiling an… | $276,000 |
| [201310098820](https://www.permitgraph.org/p/201310098820) | Oct 9, 2013 | Completed: final sign-off Oct 2013 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th floor:removing addition of duct detector to be replaced by smoke detector changed address of 2 devices all to be reflected on new set of drawings as requested by inspector. ref app#201309045880 | $50 |
| [201309247550](https://www.permitgraph.org/p/201309247550) | Sep 24, 2013 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | revised pa#201309197197 to include: remove (e) pull station to be replaced by emergency door release removing dd to sd, relay & interposing relay inside it room to control damper, change 3 ceiling sp… | $200 |
| [201309197197](https://www.permitgraph.org/p/201309197197) | Sep 19, 2013 | Completed: final sign-off Oct 2013 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 18th floor-t.i scope-relocating 2 (e) smoke detectors, 1 (e) manual pull, adding 18 speaker/strobes, 8 speakers, 2 control relays, 3 interposing relays, 1 duct detector fan shutdown & fsd control. re… | $7,500 |
| [201309126628](https://www.permitgraph.org/p/201309126628) | Sep 12, 2013 | Completed: final sign-off Feb 2014 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 4th & 18th floors-evacuation sign/map-6 signs total | $1,000 |
| [201309045880](https://www.permitgraph.org/p/201309045880) | Sep 4, 2013 | Completed: final sign-off Oct 2013 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 4th floor suite 410 -t.i relocate 3 (e) speaker/strobes, add 2 speaker/strobes, 3 speakers, 1 smoke detector, 1 control module, 1 interposing relay for door holder control, 1 duct det, 2 control rela… | $10,000 |
| [201308235105](https://www.permitgraph.org/p/201308235105) | Aug 23, 2013 | Never finaled: issued Sep 2013, no final | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | title 24 mep. adding new fire smoke dampers andd smoke detection- reference application #201306199912 |  |
| [201308235099](https://www.permitgraph.org/p/201308235099) | Aug 23, 2013 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | title 24/mep permits. ref app#201307121736 |  |
| [201307292984](https://www.permitgraph.org/p/201307292984) | Jul 29, 2013 | Completed: final sign-off Oct 2013 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | 18th floor. relocate 56 pendent and add 9 upright heads. t.i. app201306199912 | $33,410 |
| [201307121736](https://www.permitgraph.org/p/201307121736) | Jul 12, 2013 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated… | $100,000 |
| [201306199912](https://www.permitgraph.org/p/201306199912) | Jun 19, 2013 | Completed: final sign-off Dec 2013 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647) | demolition of non-structural interior. remodel of office interior consisting of private office, conference rooms & support spaces. upgrade existing restrooms. mep under separate permits. | $365,000 |
| [201304124423](https://www.permitgraph.org/p/201304124423) | Apr 12, 2013 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) | replacing extg fire evacuation plan signs. | $9,753 |
| [201210101671](https://www.permitgraph.org/p/201210101671) | Oct 10, 2012 | Completed: final sign-off Mar 2013 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Frans Construction Inc.](https://www.permitgraph.org/contractor/frans-construction-inc-597405) | minor interior remodel of existing chase bank, new offices, ceiling & finishes. | $135,239 |
| [201104194367](https://www.permitgraph.org/p/201104194367) | Apr 19, 2011 | Completed: final sign-off Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | umberella permit on 2nd & 15th floor - compliance with high rise sprinkler ordinance #377-93, no work, completion for pa #200511047434. |  |
| [201102180577](https://www.permitgraph.org/p/201102180577) | Feb 18, 2011 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | revision to appl #201012015878 - add 2 pendent sprinklers. | $400 |
| [201101289203](https://www.permitgraph.org/p/201101289203) | Jan 28, 2011 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti 15th fl suite 1500. 2 smoke dampers, 1 pam relay, 14 speakers, 12 speaker/strobes/strobe | $10,000 |
| [201101198608](https://www.permitgraph.org/p/201101198608) | Jan 19, 2011 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Stripe Inc. Dba Garnett Sign Studio](https://www.permitgraph.org/contractor/stripe-inc-dba-garnett-sign-studio-743512) | for 15th floor only - 1 stairwell & elevator evacuation map. | $1,500 |
| [201101138336](https://www.permitgraph.org/p/201101138336) | Jan 13, 2011 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 15th floor m.e.p - title 24, install new ductwork for perimeter & interior zones, new vavs, new lighting. ref pa #201012176944. no card readers on this permit. | $100,000 |
| [201012176949](https://www.permitgraph.org/p/201012176949) | Dec 17, 2010 | Completed: final sign-off May 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 26th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new power and new finishes. no structural work to be performed. | $50,000 |
| [201012176944](https://www.permitgraph.org/p/201012176944) | Dec 17, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 15th floor:tenant improvements consisting of offices including non bearing partitions, doors, side light glazing, new lighting,new power and new finishes.associated mechanical, electrical and fire li… | $350,000 |
| [201012015878](https://www.permitgraph.org/p/201012015878) | Dec 1, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | install new fire sprinkler system at 15th fl from existing prv on that floor | $31,500 |
| [201009171085](https://www.permitgraph.org/p/201009171085) | Sep 17, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) |  | create evacuation sign for the 24th floor ( qty 3) | $750 |
| [201009161033](https://www.permitgraph.org/p/201009161033) | Sep 16, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 15th floor: full floor demolition of interior partitions, ceiling systems, plmg, fixtures, electrical outlets and associated components. sprinkler/fa under separate permits. | $40,000 |
| [201009130752](https://www.permitgraph.org/p/201009130752) | Sep 13, 2010 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850), [Jemcom](https://www.permitgraph.org/contractor/jemcom-836036) | add 2 new antennas on new mount on roof. add new battery rach with 24 batteries and replace 3 existing cabinets with new inside existing verizon equipment room. | $20,000 |
| [201008239345](https://www.permitgraph.org/p/201008239345) | Aug 23, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | 24th floor-fire sprinkler tenant-relocate 58 heads | $14,500 |
| [201008199123](https://www.permitgraph.org/p/201008199123) | Aug 19, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 24th fl, mep. relocate supply ductwork run for perimeter and interior aones. install 1 new vav for interior zones. dmo and cap partial ductworks. furnish new 24x24 supply and return grilles. also rel… | $100,000 |
| [201008189009](https://www.permitgraph.org/p/201008189009) | Aug 18, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | 24th floor - fire alarm t.i. for tenant, adding 1 control relay, 15 speaker/strobes, 1 smoke detector, 2 strobes. | $14,388 |
| [201006043822](https://www.permitgraph.org/p/201006043822) | Jun 4, 2010 | Completed: final sign-off Apr 2011 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | demo of 536 lineal ft of drywall partition apprx. 5,700 sqft of acoustic ceiling. install 480 lin.ft of drywall partition, 5,700 sqft of acoustic ceiling grid & tile. new doors & frames & lighting. u… | $410,000 |
| [201003097838](https://www.permitgraph.org/p/201003097838) | Mar 9, 2010 | Never finaled: issued Mar 2010, no final | [401 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | erect a electric single faced direct new sign | $2,500 |
| [M188153](https://www.permitgraph.org/p/M188153) | Jan 13, 2010 | Never finaled: issued Jan 2010, no final | [401 California St](https://www.permitgraph.org/a/0260/001) |  | street space & mta |  |
| [200912102959](https://www.permitgraph.org/p/200912102959) | Dec 10, 2009 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti for chase bank at 401 california 1st fl: add 4 speaker/strobes, relocate existing notification of pull station | $10,032 |
| [200911131206](https://www.permitgraph.org/p/200911131206) | Nov 13, 2009 | Completed: final sign-off Aug 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvments to the existing fire sprinkler system, 1st fl | $2,600 |
| [200911121057](https://www.permitgraph.org/p/200911121057) | Nov 12, 2009 | Completed: final sign-off Jul 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | work on #425 california st. erect a electric wall single faced sign. | $65,000 |
| [200911121060](https://www.permitgraph.org/p/200911121060) | Nov 12, 2009 | Completed: final sign-off Jul 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | work on #401 california st. erect a electric wall single faced sign. | $20,000 |
| [200908285790](https://www.permitgraph.org/p/200908285790) | Aug 28, 2009 | Completed: final sign-off Aug 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Dbsi Inc Dba Design Build Solutions & In](https://www.permitgraph.org/contractor/dbsi-inc-dba-design-build-solutions-in-931142) | 1st fl-revised scope of work. exterior glazing will be full height to match existing windows. rev. to pa# 2009.05.18.8573. no elect. work under this rev. work limited to 1st fl only- sprinkler and fi… | $150,000 |
| [200908195136](https://www.permitgraph.org/p/200908195136) | Aug 19, 2009 | Completed: final sign-off Sep 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Dbsi Inc Dba Design Build Solutions & In](https://www.permitgraph.org/contractor/dbsi-inc-dba-design-build-solutions-in-931142) | 1st floor-add electrical boxes and 9 pendent lights. change specs. on bcm office from wood frame to glazing system. reev. to pa# 2009.05.18.8573. work on 1st fl only | $2,500 |
| [200907152676](https://www.permitgraph.org/p/200907152676) | Jul 15, 2009 | Completed: final sign-off Dec 2009 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850), [N S A Wireless Inc](https://www.permitgraph.org/contractor/n-s-a-wireless-inc-867615) | add three antennas/ 1-per sector (new). | $8,900 |
| [200905188573](https://www.permitgraph.org/p/200905188573) | May 18, 2009 | Completed: final sign-off Sep 2010 | [401 California St](https://www.permitgraph.org/a/0260/001) | [Dbsi Inc Dba Design Build Solutions & In](https://www.permitgraph.org/contractor/dbsi-inc-dba-design-build-solutions-in-931142) | demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanical | $100,000 |
| [200905067776](https://www.permitgraph.org/p/200905067776) | May 6, 2009 | Completed: final sign-off Jan 2010 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | replace main entry doors and glass panel above doors, modify existing canopy, reduce the number lights and modify 250 sf of sidewalk | $176,000 |
| [200903063528](https://www.permitgraph.org/p/200903063528) | Mar 6, 2009 | Expired or cancelled: expired Apr 2016 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm ti, elevator upgrade, 2 signal modules, 4 speakers, 4 phone jacks | $14,400 |
| [200712049531](https://www.permitgraph.org/p/200712049531) | Dec 4, 2007 | Completed: final sign-off Dec 2007 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | 26th floor, suite 2600 - fire alarm t.i. for tech & conf. room. new speaker/strobe, new fsd/ahu controlled by an existing control relay. | $5,800 |
| [200710155343](https://www.permitgraph.org/p/200710155343) | Oct 15, 2007 | Completed: final sign-off Dec 2007 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | 26th floor - demolish one partition, add three new partitions, recircuit (6) lights, modify hvac and new air handling unit. sprinkler work under seperate permit. | $18,000 |
| [200704179011](https://www.permitgraph.org/p/200704179011) | Apr 17, 2007 | Completed: final sign-off Apr 2007 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J B 3 Enterprises Inc](https://www.permitgraph.org/contractor/j-b-3-enterprises-inc-458583) | per correction notice issued by district inspector to correct story count, adjust:200502024556 shows 15 story, 200602285589 adjsut to reflect 28 story, 200702214562 per b.i. patric o 'rierden |  |
| [200702214562](https://www.permitgraph.org/p/200702214562) | Feb 21, 2007 | Completed: final sign-off Apr 2007 | [425 California St](https://www.permitgraph.org/a/0260/001) | [J B 3 Enterprises Inc](https://www.permitgraph.org/contractor/j-b-3-enterprises-inc-458583) | renew for final only 200502024556 & 200602285589. |  |
| [M44042](https://www.permitgraph.org/p/M44042) | Oct 4, 2006 | Never finaled: issued Oct 2006, no final | [401 California St](https://www.permitgraph.org/a/0260/001) |  | street space permit |  |
| [200607126266](https://www.permitgraph.org/p/200607126266) | Jul 12, 2006 | Completed: final sign-off Aug 2006 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | revision to appl#200605161658 hallway at restrooms mislabled as corridor. it should be a hallway as noted on attached plans. |  |
| [200606224726](https://www.permitgraph.org/p/200606224726) | Jun 22, 2006 | Expired or cancelled: expired Jan 2008 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | oti-2, 11th floor, sp. | $3,600 |
| [200606204460](https://www.permitgraph.org/p/200606204460) | Jun 20, 2006 | Completed: final sign-off Aug 2006 | [425 California St](https://www.permitgraph.org/a/0260/001) | [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) | fire alarm upgrade to 11th fl of smoke detectors and notification appliances. | $6,177 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (32), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (16), [Cahill Const Service Inc](https://www.permitgraph.org/contractor/cahill-const-service-inc-495085) (15), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) (12), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (12), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (10), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (9), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (8), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (5), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) (5), [J And R Graphics Co](https://www.permitgraph.org/contractor/j-and-r-graphics-co-771465) (5), [Matrix Hg Inc](https://www.permitgraph.org/contractor/matrix-hg-inc-812232) (5), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) (5), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (5), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) (4), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (3), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) (3), [Dbsi Inc Dba Design Build Solutions & In](https://www.permitgraph.org/contractor/dbsi-inc-dba-design-build-solutions-in-931142) (3), [M C S Construction Services](https://www.permitgraph.org/contractor/m-c-s-construction-services-1015908) (3), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (3), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (3), [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) (2), [J B 3 Enterprises Inc](https://www.permitgraph.org/contractor/j-b-3-enterprises-inc-458583) (2), [Mcclure Electric Inc](https://www.permitgraph.org/contractor/mcclure-electric-inc-248877) (2), [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850) (2), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Cahill Contractors Inc](https://www.permitgraph.org/contractor/cahill-contractors-inc-300647), [Cahill Contractors Llc.](https://www.permitgraph.org/contractor/cahill-contractors-llc-1011738), [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872), [Ericsson Inc Dba E U S Inc](https://www.permitgraph.org/contractor/ericsson-inc-dba-e-u-s-inc-698896), [Frans Construction Inc.](https://www.permitgraph.org/contractor/frans-construction-inc-597405), [Jemcom](https://www.permitgraph.org/contractor/jemcom-836036), [L.D. Strobel Co Ltd](https://www.permitgraph.org/contractor/l-d-strobel-co-ltd-631117), [N S A Wireless Inc](https://www.permitgraph.org/contractor/n-s-a-wireless-inc-867615), [Ravig Inc Dba Salient Global Technologi](https://www.permitgraph.org/contractor/ravig-inc-dba-salient-global-technologi-1058024), [San Francisco Commercial Builders Inc](https://www.permitgraph.org/contractor/san-francisco-commercial-builders-inc-801883), [Stripe Inc. Dba Garnett Sign Studio](https://www.permitgraph.org/contractor/stripe-inc-dba-garnett-sign-studio-743512), [Wavcomm Inc](https://www.permitgraph.org/contractor/wavcomm-inc-724434)
- Architects: [Stanley H Lew](https://www.permitgraph.org/professional/stanley-h-lew-C29609) (16), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618) (11), [Claudette Bleijenberg](https://www.permitgraph.org/professional/claudette-bleijenberg-C31720) (3), [Adriana Daringa](https://www.permitgraph.org/professional/adriana-daringa-C33174), [Anthony Siros](https://www.permitgraph.org/professional/anthony-siros-C11497), [Daniel Huntsman](https://www.permitgraph.org/professional/daniel-huntsman-C9255), [Douglas Dohan](https://www.permitgraph.org/professional/douglas-dohan-C14052), [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821), [Kelda Gragg](https://www.permitgraph.org/professional/kelda-gragg-C14737), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C29682), [Michael R. Downey](https://www.permitgraph.org/professional/michael-r-downey-C19329), [Roger Wong](https://www.permitgraph.org/professional/roger-wong-C26423), [Virginie Manichon](https://www.permitgraph.org/professional/virginie-manichon-C32701)
- Engineers: [Stephen Shafter](https://www.permitgraph.org/professional/stephen-shafter-E21097) (6), [Alan Wright](https://www.permitgraph.org/professional/alan-wright-M32044) (4), [Kevin Carter](https://www.permitgraph.org/professional/kevin-carter-M30364) (4), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378) (2), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894) (2), [Brad Hollub](https://www.permitgraph.org/professional/brad-hollub-M33234) (2), [Glen Hunt](https://www.permitgraph.org/professional/glen-hunt-C67146), [James R. Spore](https://www.permitgraph.org/professional/james-r-spore-S6336), [Jordan Malabed](https://www.permitgraph.org/professional/jordan-malabed-M41544), [Martha Breed](https://www.permitgraph.org/professional/martha-breed-C32618), [Paul Mcdonald](https://www.permitgraph.org/professional/paul-mcdonald-15043), [Prabhjeet Grewal](https://www.permitgraph.org/professional/prabhjeet-grewal-E15692), [Steven Terry](https://www.permitgraph.org/professional/steven-terry-C66211), [Xuong Quach](https://www.permitgraph.org/professional/xuong-quach-M31981), [Zhen Chao Xiong](https://www.permitgraph.org/professional/zhen-chao-xiong-39063)
- Authorized agents: [Alex Wong](https://www.permitgraph.org/professional/alex-wong-892772) (4)
- Designers: [John Walsh](https://www.permitgraph.org/professional/john-walsh-892772) (3)
- Pmt consultant/expediters: [Christina Nguyen](https://www.permitgraph.org/professional/christina-nguyen-892772)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0260/001.