# 555 California St

Block 0259, lot 027. Page: https://www.permitgraph.org/a/0259/027

- City's use: Commercial Misc
- Built: 1969
- Building: 221,443 sq ft
- Lot: 72,335 sq ft
- Zoning: C3O
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

40 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202607215354](https://www.permitgraph.org/p/202607215354) | Jul 21, 2026 | In progress: issued Jul 2026 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening. |  |
| [202607014407](https://www.permitgraph.org/p/202607014407) | Jul 1, 2026 | Completed: final sign-off Oct 2026 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| [202511189824](https://www.permitgraph.org/p/202511189824) | Nov 25, 2025 | Completed: final sign-off Dec 2025 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | 31st/f - demo existing pendent sprinklers and drops to bring existing system to warm shell, update existing seismic bracing per nfpa 13 on 31st floor for tenant improvement.building permit ref. #: 20… | $61,143 |
| [202511129449](https://www.permitgraph.org/p/202511129449) | Nov 18, 2025 | Completed: final sign-off Dec 2025 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) | demo (e) pendent sprinklers & drops to bring (e) system to warm shell, update (e) seismic bracing per nfpa 13 on 46th floor to ti. ref building pa# 202510177609. | $30,244 |
| [202510177609](https://www.permitgraph.org/p/202510177609) | Oct 17, 2025 | In progress: issued Oct 2025 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) | 31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use an… | $400,000 |
| [202412106477](https://www.permitgraph.org/p/202412106477) | Dec 10, 2024 | Completed: final sign-off Apr 2025 | [555 California St](https://www.permitgraph.org/a/0259/027) |  | fire sprinkler permit. relocate 263, add 19, delete 5 sprinklers on 6th fl | $75,000 |
| [202210144360](https://www.permitgraph.org/p/202210144360) | Oct 14, 2022 | Completed: final sign-off May 2024 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Rab Com Limited](https://www.permitgraph.org/contractor/rab-com-limited-566993) | 27/f:furnish 2-way communications intercom stations for passenger & freight elevator lobbies.intercoms installed to provide comm. abilities during times that elevator lobby doors are locked. conduit,… | $24,500 |
| [202206226892](https://www.permitgraph.org/p/202206226892) | Jun 22, 2022 | Completed: final sign-off Sep 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred. | $125,000 |
| [202205194563](https://www.permitgraph.org/p/202205194563) | May 19, 2022 | Never finaled: issued May 2022, no final | [555 California St](https://www.permitgraph.org/a/0259/027) | [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862) | relocate (e) pendents/upright and add new pendents sprinklers to accomodate buildout gcti 202203119780 | $11,750 |
| [202203220597](https://www.permitgraph.org/p/202203220597) | Mar 22, 2022 | Completed: final sign-off Jul 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 28th fl add (5) and relocate 84 sprinkler heads. job #22-608 ref 202203029073 | $21,525 |
| [202201256582](https://www.permitgraph.org/p/202201256582) | Jan 25, 2022 | Completed: final sign-off Mar 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 43/f: mod of (e) fire alarm system. 1 ceiling strobe will be provided for proper coverage. and voluntary installation of 2 smoke detector, 1 relay module and 1 door holder - pa 202010277522 (fa). | $3,000 |
| [202112033627](https://www.permitgraph.org/p/202112033627) | Dec 3, 2021 | Completed: final sign-off Dec 2021 | [555 California St](https://www.permitgraph.org/a/0259/027) | [G Swanson Constr. Inc.](https://www.permitgraph.org/contractor/g-swanson-constr-inc-405146) | flrs 6 & 11: revise pa 202102195039 cover page to state no mechanical work and electrical work only on flr 6. |  |
| [202109178673](https://www.permitgraph.org/p/202109178673) | Sep 17, 2021 | Completed: final sign-off Nov 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a. | $3,008,592 |
| [202109158464](https://www.permitgraph.org/p/202109158464) | Sep 15, 2021 | Completed: final sign-off Jan 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 30/f: rev to pa202106172730: addition of 2 call stations for a temp 2-way systems that was requested by the tenant. |  |
| [202106253245](https://www.permitgraph.org/p/202106253245) | Jun 25, 2021 | Completed: final sign-off Nov 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep. | $2,793,670 |
| [202106243139](https://www.permitgraph.org/p/202106243139) | Jun 24, 2021 | Completed: final sign-off Dec 2022 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 9/f: full floor single t.i. inlcuding new partitions, lighting and millwork,. no structural work and no change of use. deffered mep work. | $2,793,670 |
| [202012291863](https://www.permitgraph.org/p/202012291863) | Dec 29, 2020 | Never finaled: issued Jul 2021, no final | [555 California St](https://www.permitgraph.org/a/0259/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 8/f & 9/f: full floor tenant demo of floors 8 & 9 exluding the core. no structural elements shall be modified or altered. to comply with ab-017, maher n/a. | $415,845 |
| [202009184493](https://www.permitgraph.org/p/202009184493) | Sep 18, 2020 | Completed: final sign-off Jun 2021 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | fl 46: fire only work for the corridor/suite 4646 remodel on floor 46; addition are 6 smoke detectors and 10 speaker/strobes, as well as the relocation of 1 smoke detector. ref permit app # 201912179… | $10,150 |
| [M1184638](https://www.permitgraph.org/p/M1184638) | Jan 15, 2020 | Never finaled: issued Jan 2020, no final | [555 California St](https://www.permitgraph.org/a/0259/027) |  | street space w/mta |  |
| [201912179736](https://www.permitgraph.org/p/201912179736) | Dec 17, 2019 | Completed: final sign-off Jul 2021 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 46th fl: selective demo of (e) finishes, ceiling grid and tile, lighting, power, construction of new finishes, ceiling grid & tile, lighting & power, there will be no change in occupancy & no change… | $236,152 |
| [M1163847](https://www.permitgraph.org/p/M1163847) | Nov 7, 2019 | Never finaled: issued Nov 2019, no final | [555 California St](https://www.permitgraph.org/a/0259/027) |  | street space only |  |
| [201910316065](https://www.permitgraph.org/p/201910316065) | Oct 31, 2019 | Completed: final sign-off Nov 2019 | [555 California St](https://www.permitgraph.org/a/0259/027) |  | fire sprinkler permit relocate 10, add 1 delete 1 sprinkler on 5th fl ti 201907196357 | $2,600 |
| [201910093982](https://www.permitgraph.org/p/201910093982) | Oct 9, 2019 | Completed: final sign-off Jan 2020 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 5/f: redistribute (e) ductwork for new floor layout. partial t.i. retrofit: lighting, power & signal, wiring & controls. ref t.i. pa#201907196357. | $125,000 |
| [M1148967](https://www.permitgraph.org/p/M1148967) | Oct 7, 2019 | Never finaled: issued Oct 2019, no final | [555 California St](https://www.permitgraph.org/a/0259/027) |  | street space only |  |
| [201908219451](https://www.permitgraph.org/p/201908219451) | Aug 21, 2019 | Never finaled: issued Aug 2019, no final | [555 California St](https://www.permitgraph.org/a/0259/027) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | 18th fl - tenant improvement for fire sprinklers. relocate and modify fire sprinklers as ti in the area of work. existing system to remain. total sprinkler modify 229. ref pa #201906173527. | $60,000 |
| [M1087827](https://www.permitgraph.org/p/M1087827) | May 30, 2019 | Never finaled: issued Jun 2019, no final | [555 California St](https://www.permitgraph.org/a/0259/027) |  | street space/mta meters |  |
| [201809079408](https://www.permitgraph.org/p/201809079408) | Sep 7, 2018 | Completed: final sign-off Dec 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | 1/f:interior non-structural demolition of extg interior 1st floor tenant space. scope of work to include removal of extg interior partitions, extg plumbing fixtures and extg finishes. ab-017. ref. pe… | $15,000 |
| [201804186661](https://www.permitgraph.org/p/201804186661) | Apr 18, 2018 | Completed: final sign-off Apr 2019 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | partial floor tenant to include construction of new drywall partitions, acoustic ceilings. new mech, and electrical and plumbing. new mill willwork finishes maher not req | $525,000 |
| [201801309830](https://www.permitgraph.org/p/201801309830) | Jan 30, 2018 | Completed: final sign-off Apr 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | concourse mechaniclal work only. new low pressure ductwork, 1 new supply grill and 2 return grills. ref 201712217109 | $25,500 |
| [201709229278](https://www.permitgraph.org/p/201709229278) | Sep 22, 2017 | Completed: final sign-off Mar 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | fire alarm work for the common areas on floor 33, additions are 4 smoke detectors, 2 speaker strobes. n/a for maher. ref# 201706290698. n/a for maher. | $3,460 |
| [201709229276](https://www.permitgraph.org/p/201709229276) | Sep 22, 2017 | Completed: final sign-off Mar 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) | fire alarm work for the common areas on floor 34, additions are 10 speaker/strobes. ref#201708043894. n/a for maher. | $5,100 |
| [201709077266](https://www.permitgraph.org/p/201709077266) | Sep 7, 2017 | Completed: final sign-off Oct 2017 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 52nd floor: as built fire sprinklers. permit #201708225569. ref app201707212597. n/a for maher |  |
| [201708225569](https://www.permitgraph.org/p/201708225569) | Aug 22, 2017 | Completed: final sign-off Sep 2017 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 52nd floor: relocate 5 fire sprinklers, 3 concealed pendents and 2 uprights per t.i. ref app#201707212597. n/a maher | $1,125 |
| [201708084168](https://www.permitgraph.org/p/201708084168) | Aug 8, 2017 | Completed: final sign-off Nov 2017 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 33rd fl elevator lobby tenant improvement: relocate five (5) sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref #201706290698. maher na | $2,625 |
| [201708043888](https://www.permitgraph.org/p/201708043888) | Aug 4, 2017 | Completed: final sign-off Sep 2017 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 5/f: rev to pa201702018388: reduce scope from original project. (n) partiions, lighting, millwork, finishes. no change in occupancy use or area. mep, l/s, sprinklers under sep permit. |  |
| [201707212600](https://www.permitgraph.org/p/201707212600) | Jul 21, 2017 | Completed: final sign-off Sep 2023 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 52nd floor: provide new lighting and branch circuiting to extg panel. n/a for maher. ref #201707212597 | $15,000 |
| [201707212598](https://www.permitgraph.org/p/201707212598) | Jul 21, 2017 | Completed: final sign-off Jan 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 52nd floor: new water source heat pump for new zones. supply and return grilles with rapid mount framing. thermostat in space per hvac plan. n/a for maher. | $10,000 |
| [201707212597](https://www.permitgraph.org/p/201707212597) | Jul 21, 2017 | Completed: final sign-off Nov 2017 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 52nd fl modify existing storage room to ups room. modify existing office space to storage room and lactation room | $20,000 |
| [201707202502](https://www.permitgraph.org/p/201707202502) | Jul 20, 2017 | Completed: final sign-off Apr 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Consolidated Contracting Services Inc.](https://www.permitgraph.org/contractor/consolidated-contracting-services-inc-475813) | suite #3200: tenant improvement to existing office space on the 32nd floor | $2,000,000 |
| [201707202500](https://www.permitgraph.org/p/201707202500) | Jul 20, 2017 | Completed: final sign-off Apr 2018 | [555 California St](https://www.permitgraph.org/a/0259/027) | [Consolidated Contracting Services Inc.](https://www.permitgraph.org/contractor/consolidated-contracting-services-inc-475813) | suite #3400: tenant improvement to existing office space 34th fl mech,elec,plumb | $1,000,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (6), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (5), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (4), [Siemens Industry, Inc.](https://www.permitgraph.org/contractor/siemens-industry-inc-758796) (3), [Consolidated Contracting Services Inc.](https://www.permitgraph.org/contractor/consolidated-contracting-services-inc-475813) (2), [Eco Fire Sprinklers Inc](https://www.permitgraph.org/contractor/eco-fire-sprinklers-inc-1004513) (2), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (2), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (2), [Sc Builders, Inc](https://www.permitgraph.org/contractor/sc-builders-inc-767196) (2), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986), [G Swanson Constr. Inc.](https://www.permitgraph.org/contractor/g-swanson-constr-inc-405146), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901), [Pioneer Fire Inc.](https://www.permitgraph.org/contractor/pioneer-fire-inc-927862), [Rab Com Limited](https://www.permitgraph.org/contractor/rab-com-limited-566993), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590)
- Architects: [Donnie Lam](https://www.permitgraph.org/professional/donnie-lam-C32542) (4), [Adam Murphy](https://www.permitgraph.org/professional/adam-murphy-C29238) (2), [David Alpert](https://www.permitgraph.org/professional/david-alpert-C18239) (2), [George S Soskin](https://www.permitgraph.org/professional/george-s-soskin-C9223) (2), [Lauren Jordan](https://www.permitgraph.org/professional/lauren-jordan-C36938), [Luda Hoe](https://www.permitgraph.org/professional/luda-hoe-C38081)
- Engineers: [Clifford Dias](https://www.permitgraph.org/professional/clifford-dias-M23408) (2), [Ralph Mottola Jr](https://www.permitgraph.org/professional/ralph-mottola-jr-E12664) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Zack Kardon](https://www.permitgraph.org/professional/zack-kardon-C69106), [Zhen Chao Xiong](https://www.permitgraph.org/professional/zhen-chao-xiong-M39063)
- Designers: [Ayoob & Peery Plumbing](https://www.permitgraph.org/professional/ayoob-peery-plumbing-392967), [Bruce D. Eads](https://www.permitgraph.org/professional/bruce-d-eads-1004513)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0259/027.