# 383 Sacramento St

Block 0237, lot 016. Page: https://www.permitgraph.org/a/0237/016

- City's use: Commercial Office
- Built: 1983
- Lot: 2,597 sq ft
- Zoning: C3O
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

128 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202609178268](https://www.permitgraph.org/p/202609178268) | Sep 17, 2026 | In progress: filed Sep 2026, not yet issued | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | removal & reinstallation of existing entry door at the same location with a modified configuration on the ground floor. does not affect fixture quantities, occupant load calculations or path of trave… | $130,000 |
| [202604290306](https://www.permitgraph.org/p/202604290306) | Apr 29, 2026 | Completed: final sign-off May 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | revision to pa 202601284683 correct sprinkler pipe size from 3" to 2" |  |
| [202604159437](https://www.permitgraph.org/p/202604159437) | Apr 15, 2026 | Completed: final sign-off May 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 2nd flr. revised plans pa#: 202602065383 to show 5 added duct detectors and 5 relay modules. scope also includes 1 power supply, 2 smoke detectors, 1 monitor module, 1 control module 20 speaker strob… |  |
| [202604018677](https://www.permitgraph.org/p/202604018677) | Apr 1, 2026 | Completed: final sign-off May 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | level 15: as built to permit 202601284684. plugged 2 sprinklers. relocate 64 uprights. add 3 uprights. relocate 32 pendents. add 5 pendents. total 104. | $55,000 |
| [202602105585](https://www.permitgraph.org/p/202602105585) | Feb 10, 2026 | In progress: issued Feb 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | 1 power supply, 1 control module, 1 monitor module, 1 smoke detector, 2 relay, modules, 5 ceiling strobes, 31 speaker strobes to be added. pa ref#: 202511109274. | $11,000 |
| [202602065383](https://www.permitgraph.org/p/202602065383) | Feb 6, 2026 | In progress: issued Feb 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | fire alarm 1 power supply, 1 monitor module, 1 control module, 2 replay module, 9 ceiling strobe, 2 smoke detector, 20 speaker strobes to be added. ref pa 202512151741 | $11,000 |
| [202601284684](https://www.permitgraph.org/p/202601284684) | Jan 28, 2026 | Completed: final sign-off May 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire sprinkler ti ref pa 202511109274 relocate 82, add 7 total 89 | $45,835 |
| [202511109274](https://www.permitgraph.org/p/202511109274) | Nov 10, 2025 | Completed: final sign-off May 2026 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 15th/fl: interior demo of non-structural elements including but not limited to interior partitions,doors,finishes,ceilings,lightening,mechanical,electrical outlets, switches and plumbing fixtures for… | $1,250,000 |
| [202506269500](https://www.permitgraph.org/p/202506269500) | Jun 26, 2025 | Completed: final sign-off Nov 2025 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [C C I Commercial Construction & Improv](https://www.permitgraph.org/contractor/c-c-i-commercial-construction-improv-985808) | 17/fl: ti includes structural anchoring of existing phone booths. no revision to hvac, electrical, plumbing or life safety. | $40,000 |
| [202505156582](https://www.permitgraph.org/p/202505156582) | May 15, 2025 | Completed: final sign-off Nov 2025 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | recommencement and completion of work approved under pa #2021-0205-4132 | $45,000 |
| [202203240766](https://www.permitgraph.org/p/202203240766) | Mar 24, 2022 | Never finaled: issued Aug 2022, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | cell site mod: r/r 6 panel antennas,install 1 new rectifier w/in (e) dc power plant.install (1) 6648 baseband within (e) fif rack. | $35,000 |
| [202102054132](https://www.permitgraph.org/p/202102054132) | Feb 5, 2021 | Expired or cancelled: expired Nov 2025 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Western Machinery Electric](https://www.permitgraph.org/contractor/western-machinery-electric-715278), [The Electrical Testing Company Llc](https://www.permitgraph.org/contractor/the-electrical-testing-company-llc-833167) | 23/f ph: maintenance work: in-kind replacement of (e) day tank (with the same size tank) for the (e) generator & replacement in-kind for the (e) fuel pump for fueling this day tank. (n) pump due to s… | $45,000 |
| [202012020071](https://www.permitgraph.org/p/202012020071) | Dec 2, 2020 | Completed: final sign-off May 2022 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | replace cooling tower, associated piping, & accessories. install additional steel support as needed. install new centrifucal separator. tower located on roof & not taller than existing. not visible f… | $415,000 |
| [202003056281](https://www.permitgraph.org/p/202003056281) | Mar 5, 2020 | Never finaled: filed Mar 2020, never issued | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | evacuation signage for the 13th & 14th floors. 6 total signs. | $3,000 |
| [202003025818](https://www.permitgraph.org/p/202003025818) | Mar 2, 2020 | Never finaled: issued Mar 2020, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | the fabrication and installation of acrylic evacuation maps to the front surface of the interior building walls | $2,535 |
| [M1128627](https://www.permitgraph.org/p/M1128627) | Aug 26, 2019 | Never finaled: issued Aug 2019, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | street space |  |
| [M1094128](https://www.permitgraph.org/p/M1094128) | Jun 12, 2019 | Never finaled: issued Jun 2019, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | street space |  |
| [201904117783](https://www.permitgraph.org/p/201904117783) | Apr 11, 2019 | Never finaled: issued Apr 2019, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Centimark Corporation](https://www.permitgraph.org/contractor/centimark-corporation-497859) | reroof. rmeoce (e) gravel, install insulation. reinstall gravel over 15610sf tpo. solar reflectance 0.76 thermal emittance 0.84 sri 93. | $117,787 |
| [201804136279](https://www.permitgraph.org/p/201804136279) | Apr 13, 2018 | Never finaled: issued Apr 2018, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | electrical work for tenant improvement on the 20th fl. rev pa #201801269683 | $5,000 |
| [201709016726](https://www.permitgraph.org/p/201709016726) | Sep 1, 2017 | Never finaled: issued Sep 2017, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | 1st floor lobby - relocation of fire sprinkler to new location total 33 new heads. n/a maher ordinance | $1,000 |
| [201702018364](https://www.permitgraph.org/p/201702018364) | Feb 1, 2017 | Never finaled: issued Feb 2017, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | electrical work for ti on the 9th floor. ref pa 2016-1207-4359 | $5,000 |
| [201702018365](https://www.permitgraph.org/p/201702018365) | Feb 1, 2017 | Never finaled: issued Feb 2017, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | electrical work for ti on 22/f. ref pa 2016-12-07-4362 | $5,000 |
| [201612074359](https://www.permitgraph.org/p/201612074359) | Dec 7, 2016 | Completed: final sign-off Jun 2017 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 9th floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $550,000 |
| [201612074362](https://www.permitgraph.org/p/201612074362) | Dec 7, 2016 | Completed: final sign-off Jun 2017 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 22nd floor: t.i. includes demo of nonstructural partitions and building. new nonstructural partitions. mep, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $650,000 |
| [201611021694](https://www.permitgraph.org/p/201611021694) | Nov 2, 2016 | Completed: final sign-off May 2017 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | basement- replace (2) existing boilers, (2) existing hot water pumps, add (2) new primary hot water pumps, install (1) new combustion air supply fan & modify piping & flue. n/a ordinance #155-13 | $300,000 |
| [201610271244](https://www.permitgraph.org/p/201610271244) | Oct 27, 2016 | Completed: final sign-off Oct 2016 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 3rd floor as build drawings for pa 2016-1018-0538 fire alarm system |  |
| [201609026654](https://www.permitgraph.org/p/201609026654) | Sep 2, 2016 | Completed: final sign-off Oct 2016 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | per ti add 18 and relocate 14 fire sprinklers and plug 13 outlets on the 3rd floor to conform with wall wall/ceiling layout | $6,593 |
| [M647527](https://www.permitgraph.org/p/M647527) | Dec 16, 2015 | Never finaled: issued Dec 2015, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | street space |  |
| [201501125517](https://www.permitgraph.org/p/201501125517) | Jan 12, 2015 | Completed: final sign-off Jun 2015 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | title 24 electrical to install new lighting and power to new work on curently occupied tenant floor. please refer to permit #2014-1205-3151 for ti work. n/a ordinance #155-13 | $60,000 |
| [201412053151](https://www.permitgraph.org/p/201412053151) | Dec 5, 2014 | Completed: final sign-off Jun 2015 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | tenant improvement on 18th flr to demo non-structural partition, build new non-structural partitions. relocate doors and frames, add new millwork and finish. all mep, life safety and sprinkler work u… | $573,735 |
| [201412032884](https://www.permitgraph.org/p/201412032884) | Dec 3, 2014 | Completed: final sign-off Oct 2015 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | fire alarm ti- 8th floor add 1 notifaction device for construction plan 201411071004 | $1,500 |
| [201412032883](https://www.permitgraph.org/p/201412032883) | Dec 3, 2014 | Completed: final sign-off Oct 2015 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | fire alarm ti-3rd floor: add 2 new strobe lights to extg strobe circuits. relocated 2 strobe lights and 2 speaker. ref app#201411071004. n/a for the maher. | $1,500 |
| [201312093609](https://www.permitgraph.org/p/201312093609) | Dec 9, 2013 | Completed: final sign-off Jan 2014 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 1st floor: replace cpu, power supply, loop cards, audio message generator, master telephone headset at existing fire alarm system. retest system 100% functions 10% extg devices. | $27,000 |
| [201307292963](https://www.permitgraph.org/p/201307292963) | Jul 29, 2013 | Completed: final sign-off Dec 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 23rd floor - add 15 new strobes, 14 new speakers to existing fire alarm system. relcoate one smoke detector. ref pa #2013.07.19.2255 | $10,000 |
| [201307292961](https://www.permitgraph.org/p/201307292961) | Jul 29, 2013 | Completed: final sign-off Aug 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 4th floor - add eight new strobes to existing circuit, replace two existing strobes with new, relcoate one existing speaker. ref pa #2013.07.17.2094 | $3,900 |
| [201307111633](https://www.permitgraph.org/p/201307111633) | Jul 11, 2013 | Never finaled: issued Jul 2013, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Hawk Mechanical Inc](https://www.permitgraph.org/contractor/hawk-mechanical-inc-822098) | 19th floor: relocate grilles and thermostats. replace one thermostat. hvac work. | $17,300 |
| [201306250376](https://www.permitgraph.org/p/201306250376) | Jun 25, 2013 | Completed: final sign-off Aug 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 19th floor-add 4 strobes, 1 new speaker to (e) fire alarm system. relocate 1 strobe & 1 speaker | $2,600 |
| [201306139494](https://www.permitgraph.org/p/201306139494) | Jun 13, 2013 | Completed: final sign-off May 2025 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | t.i: relocate 1 sprinkler for coverage. pa# 201305156973 | $514 |
| [201305237708](https://www.permitgraph.org/p/201305237708) | May 23, 2013 | Completed: final sign-off Aug 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 15th floor-relocate 2 speakers & 1 strobe at (e) fire alarm system | $1,300 |
| [201305015834](https://www.permitgraph.org/p/201305015834) | May 1, 2013 | Completed: final sign-off Jul 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add one strobe to extg fire alarm system. relocate one strobe and one speaker. | $1,400 |
| [201302079647](https://www.permitgraph.org/p/201302079647) | Feb 7, 2013 | Completed: final sign-off Dec 2013 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 12th and 13th floors:add 2 abbressable relay modules to extg fire alarm system. | $1,500 |
| [201211274845](https://www.permitgraph.org/p/201211274845) | Nov 27, 2012 | Completed: final sign-off Dec 2012 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | relocate one smoke detector; one speaker, 8 strobes, add 9 speakers, 6 strobes, 1 sync mobile to existing fire alarm system | $8,700 |
| [201208207722](https://www.permitgraph.org/p/201208207722) | Aug 20, 2012 | Completed: final sign-off Sep 2012 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 9 strobes to existing fire alarem system. relocate 2 speakers | $4,700 |
| [201111148735](https://www.permitgraph.org/p/201111148735) | Nov 14, 2011 | Completed: final sign-off Dec 2011 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add five strobes, 1 power supply to existing fire alarm system. relocate 2 manual pull stations, 2 smoke detectors, 1 speaker | $3,000 |
| [201107119828](https://www.permitgraph.org/p/201107119828) | Jul 11, 2011 | Completed: final sign-off Aug 2011 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 10th floor-add 5 strobes & 3 speakers to (e) fire alarm system. relocate 1 smoke detector & replace 2 (e) strobes with new | $5,500 |
| [201006023633](https://www.permitgraph.org/p/201006023633) | Jun 2, 2010 | Completed: final sign-off Aug 2010 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 5th floor-add 1 strobe to (e) fire alarm system | $1,200 |
| [201001124591](https://www.permitgraph.org/p/201001124591) | Jan 12, 2010 | Completed: final sign-off Feb 2010 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 7th floor add one strobe & two speakers to existing fire alarm system. | $2,000 |
| [200905229043](https://www.permitgraph.org/p/200905229043) | May 22, 2009 | Completed: final sign-off Jun 2009 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | to obtain final inspection for work approved under pa#2007/06/06/3151. all work has been completed. |  |
| [200905229042](https://www.permitgraph.org/p/200905229042) | May 22, 2009 | Completed: final sign-off Jun 2009 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | to obtain final inspection for work approved under pa#2007/06/28/5463. all work has been completed. |  |
| [200903023115](https://www.permitgraph.org/p/200903023115) | Mar 2, 2009 | Completed: final sign-off Jun 2009 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 12 strobes to existing fire alarm system, relocate 13 speakers. | $5,000 |
| [200810083663](https://www.permitgraph.org/p/200810083663) | Oct 8, 2008 | Completed: final sign-off Dec 2008 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 19th floor-remove one smoke detector and one strobe from (e) fire alarm system | $1,800 |
| [200808259945](https://www.permitgraph.org/p/200808259945) | Aug 25, 2008 | Never finaled: issued Aug 2008, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | at 6th fl: add, relocate fire sprinkler head per t.i. 77 sprinkler heads. | $14,000 |
| [200808209579](https://www.permitgraph.org/p/200808209579) | Aug 20, 2008 | Never finaled: issued Aug 2008, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | upgrade of fire alarm system on the 6th floor. relocate 5 smoke detectors and 6 speakers. replace and relocate 16 strobes | $6,200 |
| [200807166785](https://www.permitgraph.org/p/200807166785) | Jul 16, 2008 | Completed: final sign-off Mar 2009 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 15th floor. relocate 3 smoke detectors, one speaker and 5 strobes. add 3 new strobes to existing fire alarm. | $4,200 |
| [200807096315](https://www.permitgraph.org/p/200807096315) | Jul 9, 2008 | Completed: final sign-off Mar 2009 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 15th floor-relocate fire sprinkler per tenant improvements-19 heads relocated | $3,500 |
| [200803247855](https://www.permitgraph.org/p/200803247855) | Mar 24, 2008 | Completed: final sign-off Jun 2008 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate fire sprinkler heads per tenant improvement. total 32 heads. | $5,800 |
| [200803187385](https://www.permitgraph.org/p/200803187385) | Mar 18, 2008 | Completed: final sign-off Jun 2008 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 3rd floor: replace & relocate 10 smoke detectors, 14 strobes, relocate 5 speakers, add 1 relay module to (e) f.a. system | $4,800 |
| [200708169966](https://www.permitgraph.org/p/200708169966) | Aug 16, 2007 | Completed: final sign-off Nov 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 2 smoke detectors, five strobes, relocate 4 smoke detectors, 7 speakers, 11 strobes | $4,800 |
| [200705221903](https://www.permitgraph.org/p/200705221903) | May 22, 2007 | Completed: final sign-off Jun 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | renew pa#2006/08/25/0549, 2006/08/28/0711, 2006/03/14/6621 for final inspection |  |
| [200705151251](https://www.permitgraph.org/p/200705151251) | May 15, 2007 | Completed: final sign-off Aug 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 18th floor: relocate fire alarm devices to (e) fire alarm system, 1 new, 2 relay modules (new), 1 strobe, fire alarm certification required | $5,000 |
| [200704309954](https://www.permitgraph.org/p/200704309954) | Apr 30, 2007 | Completed: final sign-off May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | renew for final 200609121980, 200609142254, 200610034033 |  |
| [200703307656](https://www.permitgraph.org/p/200703307656) | Mar 30, 2007 | Completed: final sign-off Aug 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1 18th floor el me ls sp | $225,000 |
| [200612200293](https://www.permitgraph.org/p/200612200293) | Dec 20, 2006 | Completed: final sign-off Apr 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-3 (11th fl.) electrical and sprinkler work for the 11th fl tenant space | $48,000 |
| [200612069276](https://www.permitgraph.org/p/200612069276) | Dec 6, 2006 | Completed: final sign-off Apr 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2 11th floor me | $48,000 |
| [200611288536](https://www.permitgraph.org/p/200611288536) | Nov 28, 2006 | Completed: final sign-off Apr 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | add 1 smoke detector and 2 strobes to existing circuits on fire alarm system suite 1140 | $4,000 |
| [200610034033](https://www.permitgraph.org/p/200610034033) | Oct 3, 2006 | Expired or cancelled: expired May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-4 7th floor, me | $11,000 |
| [200609142254](https://www.permitgraph.org/p/200609142254) | Sep 14, 2006 | Expired or cancelled: expired May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 7th floor sp | $3,200 |
| [200609142256](https://www.permitgraph.org/p/200609142256) | Sep 14, 2006 | Completed: final sign-off May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2 7th floor el | $29,000 |
| [200609121980](https://www.permitgraph.org/p/200609121980) | Sep 12, 2006 | Expired or cancelled: expired May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) | 7th floor-remove & add devices to (e) fire alarm control panel, t.i. suite 700. add 4 strobes. | $5,000 |
| [200608301005](https://www.permitgraph.org/p/200608301005) | Aug 30, 2006 | Completed: final sign-off May 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti: revision to 200607277828 demo const., finishes (design build) all work on 7th floor. | $85,000 |
| [200608301001](https://www.permitgraph.org/p/200608301001) | Aug 30, 2006 | Never finaled: issued Aug 2006, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | demolition of serveral esiting office | $4,000 |
| [200608280711](https://www.permitgraph.org/p/200608280711) | Aug 28, 2006 | Expired or cancelled: expired Jun 2007 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-3 (10th fl) el | $12,000 |
| [200607277828](https://www.permitgraph.org/p/200607277828) | Jul 27, 2006 | Never finaled: issued Jul 2006, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1 (7th fl.) el, me, sl, sp | $77,500 |
| [200512160539](https://www.permitgraph.org/p/200512160539) | Dec 16, 2005 | Completed: final sign-off Jun 2006 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 mech/elec/ls 14th floor | $63,000 |
| [200512069606](https://www.permitgraph.org/p/200512069606) | Dec 6, 2005 | Completed: final sign-off Jun 2006 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2 14th fl sp | $3,800 |
| [200507278731](https://www.permitgraph.org/p/200507278731) | Jul 27, 2005 | Completed: final sign-off Nov 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 7th/fl fire alarm. | $5,100 |
| [200507117293](https://www.permitgraph.org/p/200507117293) | Jul 11, 2005 | Completed: final sign-off Nov 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2-7th/fl-el,me, sp. | $76,000 |
| [200507016709](https://www.permitgraph.org/p/200507016709) | Jul 1, 2005 | Completed: final sign-off Jun 2006 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti- 1 architectural 14th floor | $53,000 |
| [200506175341](https://www.permitgraph.org/p/200506175341) | Jun 17, 2005 | Completed: final sign-off Nov 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 18th floor el, me, sp, l/s | $31,000 |
| [200505112137](https://www.permitgraph.org/p/200505112137) | May 11, 2005 | Completed: final sign-off Nov 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1 7th/fl-el, me, ls, sp. | $55,000 |
| [200501072755](https://www.permitgraph.org/p/200501072755) | Jan 7, 2005 | Completed: final sign-off Apr 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2, 8th/fl-ls, sp | $20,000 |
| [200411239969](https://www.permitgraph.org/p/200411239969) | Nov 23, 2004 | Completed: final sign-off Apr 2005 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1, 8th fl, el, me, ls. sp | $50,000 |
| [200409164327](https://www.permitgraph.org/p/200409164327) | Sep 16, 2004 | Completed: final sign-off Oct 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-3 14th floor l/s | $14,500 |
| [200408131543](https://www.permitgraph.org/p/200408131543) | Aug 13, 2004 | Completed: final sign-off Oct 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-2, 14th floor, el, me, sp. | $36,500 |
| [200407027942](https://www.permitgraph.org/p/200407027942) | Jul 2, 2004 | Completed: final sign-off Oct 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) | oti-1, 14/f el,fs,ls,me | $46,000 |
| [200406186759](https://www.permitgraph.org/p/200406186759) | Jun 18, 2004 | Completed: final sign-off Aug 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2 16th floor l/s, sp | $30,000 |
| [200405174039](https://www.permitgraph.org/p/200405174039) | May 17, 2004 | Completed: final sign-off Jun 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2, 15th floor- ls, sp | $12,000 |
| [200404211849](https://www.permitgraph.org/p/200404211849) | Apr 21, 2004 | Completed: final sign-off Jun 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 15th fl, suite 1520, el, me,ls,sp | $100,000 |
| [200403269769](https://www.permitgraph.org/p/200403269769) | Mar 26, 2004 | Completed: final sign-off May 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | oti-2, 22nd fl, el, me, ls, sp | $200,000 |
| [200307109193](https://www.permitgraph.org/p/200307109193) | Jul 10, 2003 | Never finaled: issued Jul 2003, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1, 2nd floor, el, me, ls, sp | $28,000 |
| [200306257963](https://www.permitgraph.org/p/200306257963) | Jun 25, 2003 | Completed: final sign-off Sep 2003 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-2 10th floor, le, me, ls, sp | $56,000 |
| [200305215154](https://www.permitgraph.org/p/200305215154) | May 21, 2003 | Completed: final sign-off Sep 2003 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti- 10th floor el me ls sp | $86,000 |
| [200305205061](https://www.permitgraph.org/p/200305205061) | May 20, 2003 | Completed: final sign-off Jul 2003 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2 18th fl, ls,sp | $5,000 |
| [200304152294](https://www.permitgraph.org/p/200304152294) | Apr 15, 2003 | Completed: final sign-off Jul 2003 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 18th floor | $84,500 |
| [200304021263](https://www.permitgraph.org/p/200304021263) | Apr 2, 2003 | Expired or cancelled: expired Jan 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621) | relocate 8 heads (sprinkler) interior work only | $2,500 |
| [200212203969](https://www.permitgraph.org/p/200212203969) | Dec 20, 2002 | Completed: final sign-off Aug 2003 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 = remdition of (e) electrical, finishes minor construction of non rated clg- high partitions, | $125,000 |
| [200212113253](https://www.permitgraph.org/p/200212113253) | Dec 11, 2002 | Expired or cancelled: expired Jan 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Intellisec](https://www.permitgraph.org/contractor/intellisec-730926) | tenant improvement on 5 floors for fire alarm system. chantes to 200206078461 on basement level |  |
| [200210118809](https://www.permitgraph.org/p/200210118809) | Oct 11, 2002 | Completed: final sign-off Dec 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Taslimi Construction Co Inc](https://www.permitgraph.org/contractor/taslimi-construction-co-inc-475159) | oti-2 20th flr,el,me,sp | $22,000 |
| [200209035403](https://www.permitgraph.org/p/200209035403) | Sep 3, 2002 | Completed: final sign-off Dec 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Taslimi Construction Co Inc](https://www.permitgraph.org/contractor/taslimi-construction-co-inc-475159) | oti-1, 20th floor, el, me, ls,sp | $160,000 |
| [200207312724](https://www.permitgraph.org/p/200207312724) | Jul 31, 2002 | Expired or cancelled: expired Jan 2004 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | oti-2 rev 19th floor el |  |
| [200206259867](https://www.permitgraph.org/p/200206259867) | Jun 25, 2002 | Completed: final sign-off Aug 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | oti-2 19/f el me sp no change in occupancy | $100,000 |
| [200206078461](https://www.permitgraph.org/p/200206078461) | Jun 7, 2002 | Never finaled: issued Jun 2002, no final | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | upgrade to life safty system basement/1st floor/8th floor/21st floor/penthouse | $100,000 |
| [200206078460](https://www.permitgraph.org/p/200206078460) | Jun 7, 2002 | Completed: final sign-off Oct 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | oti-1 19th fl el,me,ls,sp | $225,000 |
| [200202280293](https://www.permitgraph.org/p/200202280293) | Feb 28, 2002 | Completed: final sign-off May 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-3,3rd flr, mech only | $5,500 |
| [200202270155](https://www.permitgraph.org/p/200202270155) | Feb 27, 2002 | Completed: final sign-off May 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-2, 3rd floor ltg, spr | $28,000 |
| [200202048358](https://www.permitgraph.org/p/200202048358) | Feb 4, 2002 | Completed: final sign-off May 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | oti-1 3rd floor ltg mech ls | $60,000 |
| [200012147899](https://www.permitgraph.org/p/200012147899) | Dec 14, 2000 | Expired or cancelled: cancelled Aug 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-2 23rd floor sp | $2,300 |
| [200011306827](https://www.permitgraph.org/p/200011306827) | Nov 30, 2000 | Expired or cancelled: expired Mar 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) | replace 11 ex strobes with new sync strobes add new power booster at 8th floor location | $3,500 |
| [200011105422](https://www.permitgraph.org/p/200011105422) | Nov 10, 2000 | Expired or cancelled: cancelled Jul 2001 | [383 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Hok Construction Inc](https://www.permitgraph.org/contractor/hok-construction-inc-606570) | relocte fire alarm devices, add new fire alarm devices | $7,661 |
| [200010254014](https://www.permitgraph.org/p/200010254014) | Oct 25, 2000 | Expired or cancelled: expired Oct 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | barrier removal project to upgrade restrooms to meet accessbility requrements, work involves demolit | $80,000 |
| [200010254012](https://www.permitgraph.org/p/200010254012) | Oct 25, 2000 | Expired or cancelled: withdrawn Jan 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1, 11th floor, el, me, ls | $25,000 |
| [200010112671](https://www.permitgraph.org/p/200010112671) | Oct 11, 2000 | Completed: final sign-off Dec 2000 | [383 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate fire sprinkler heads per tenant imprvement @ 1st floor only | $2,500 |
| [200009271688](https://www.permitgraph.org/p/200009271688) | Sep 27, 2000 | Expired or cancelled: expired Mar 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Corporate Builders Inc](https://www.permitgraph.org/contractor/corporate-builders-inc-699620) | oti-1 23/f | $5,000 |
| [200008248733](https://www.permitgraph.org/p/200008248733) | Aug 24, 2000 | Expired or cancelled: cancelled Aug 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1 el me l/s 23rd floor | $75,000 |
| [200008188230](https://www.permitgraph.org/p/200008188230) | Aug 18, 2000 | Completed: final sign-off Dec 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-2,1st floor, el,me,sp | $1,000 |
| [200008147799](https://www.permitgraph.org/p/200008147799) | Aug 14, 2000 | Completed: final sign-off Dec 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1, ground floor, el, me, ls, sp. | $105,000 |
| [200007104636](https://www.permitgraph.org/p/200007104636) | Jul 10, 2000 | Expired or cancelled: expired Mar 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 el me me ls 4th floor | $45,000 |
| [200006283877](https://www.permitgraph.org/p/200006283877) | Jun 28, 2000 | Expired or cancelled: cancelled May 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | installation of fiber optic communication cables | $50,000 |
| [200004288607](https://www.permitgraph.org/p/200004288607) | Apr 28, 2000 | Completed: final sign-off Jul 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-4 ls, 9th floor | $25,000 |
| [200004207748](https://www.permitgraph.org/p/200004207748) | Apr 20, 2000 | Completed: final sign-off Jul 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti--2: el, me9th floor | $70,000 |
| [200004207721](https://www.permitgraph.org/p/200004207721) | Apr 20, 2000 | Expired or cancelled: expired Mar 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2 4th floor sp | $2,150 |
| [200004116877](https://www.permitgraph.org/p/200004116877) | Apr 11, 2000 | Expired or cancelled: expired Oct 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-2, 6th floor, ls, sp. | $20,000 |
| [200003285607](https://www.permitgraph.org/p/200003285607) | Mar 28, 2000 | Completed: final sign-off Jul 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1 9/f el me ls sp | $200,000 |
| [200003275439](https://www.permitgraph.org/p/200003275439) | Mar 27, 2000 | Expired or cancelled: expired Apr 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | oti-1 el me ls sp 6th floor | $90,000 |
| [200003174649](https://www.permitgraph.org/p/200003174649) | Mar 17, 2000 | Expired or cancelled: expired Mar 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti 1 4th floor, el,me,ls & sp | $90,000 |
| [200003174651](https://www.permitgraph.org/p/200003174651) | Mar 17, 2000 | Expired or cancelled: expired Mar 2001 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | barrier removal,water closets,hardship application | $45,000 |
| [200002081316](https://www.permitgraph.org/p/200002081316) | Feb 8, 2000 | Expired or cancelled: cancelled Jun 2002 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-1: 15th floor- minor demolition, const. of new partitions, minor elec. & lightning rev. | $90,000 |
| [20000126275](https://www.permitgraph.org/p/20000126275) | Jan 26, 2000 | Expired or cancelled: expired Aug 2000 | [353 Sacramento St](https://www.permitgraph.org/a/0237/016) |  | oti-2, 18th fl, ls, sp | $20,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Tri-Signal Integration Inc.](https://www.permitgraph.org/contractor/tri-signal-integration-inc-758792) (25), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) (18), [Dome Construction Corp](https://www.permitgraph.org/contractor/dome-construction-corp-464986) (14), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (6), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (6), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (3), [Metropolitan Electrical Construction](https://www.permitgraph.org/contractor/metropolitan-electrical-construction-401047) (3), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) (3), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (3), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (3), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (2), [Taslimi Construction Co Inc](https://www.permitgraph.org/contractor/taslimi-construction-co-inc-475159) (2), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944), [C C I Commercial Construction & Improv](https://www.permitgraph.org/contractor/c-c-i-commercial-construction-improv-985808), [Centimark Corporation](https://www.permitgraph.org/contractor/centimark-corporation-497859), [Corporate Builders Inc](https://www.permitgraph.org/contractor/corporate-builders-inc-699620), [Cosco Fire Protection Inc.](https://www.permitgraph.org/contractor/cosco-fire-protection-inc-577621), [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846), [Hawk Mechanical Inc](https://www.permitgraph.org/contractor/hawk-mechanical-inc-822098), [Hok Construction Inc](https://www.permitgraph.org/contractor/hok-construction-inc-606570), [Intellisec](https://www.permitgraph.org/contractor/intellisec-730926), [The Electrical Testing Company Llc](https://www.permitgraph.org/contractor/the-electrical-testing-company-llc-833167), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590), [Western Machinery Electric](https://www.permitgraph.org/contractor/western-machinery-electric-715278)
- Architects: [Frederick Cote](https://www.permitgraph.org/professional/frederick-cote-C9255) (7), [Ariane Lebrella](https://www.permitgraph.org/professional/ariane-lebrella-C38312), [George S Soskin](https://www.permitgraph.org/professional/george-s-soskin-C9223), [Joyce Mizuhara](https://www.permitgraph.org/professional/joyce-mizuhara-9255), [Wesley Herr](https://www.permitgraph.org/professional/wesley-herr-C40025), [Westley Her](https://www.permitgraph.org/professional/westley-her-C48025)
- Engineers: [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828), [Henry Holbrook Hyde Iii](https://www.permitgraph.org/professional/henry-holbrook-hyde-iii-C21290), [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278), [Lars P. Mortensen](https://www.permitgraph.org/professional/lars-p-mortensen-M38284), [Seung Kun Oh](https://www.permitgraph.org/professional/seung-kun-oh-C84365)
- Authorized agents: [Andrew Volckens](https://www.permitgraph.org/professional/andrew-volckens-C9255)
- Designers: [Michael Joseph Donahue](https://www.permitgraph.org/professional/michael-joseph-donahue-612153) (3), [Robert Buckley](https://www.permitgraph.org/professional/robert-buckley-91594) (2)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0237/016.