# 505 Montgomery St

Block 0227, lot 005. Page: https://www.permitgraph.org/a/0227/005

- City's use: Commercial Office
- Lot: 788 sq ft
- Zoning: C3O
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

128 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202605292145](https://www.permitgraph.org/p/202605292145) | May 29, 2026 | In progress: issued Jun 2026 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millwork… | $150,000 |
| [202604280220](https://www.permitgraph.org/p/202604280220) | Apr 28, 2026 | In progress: issued Jun 2026 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, millwork, fixtures and finishes. project shall be compliant… | $100,000 |
| [202603177732](https://www.permitgraph.org/p/202603177732) | Mar 17, 2026 | In progress: issued May 2026 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping) | $20,000 |
| [202510308607](https://www.permitgraph.org/p/202510308607) | Oct 30, 2025 | In progress: issued Nov 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | level 6: defered mep for pa#202508294230 | $58,176 |
| [202508294230](https://www.permitgraph.org/p/202508294230) | Aug 29, 2025 | In progress: issued Oct 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | t.i: removal and construction of non -structural partitions, salvage and relocation of door assembly and new finishes. relocated power outlets and new lightening. 6th floor | $150,000 |
| [202411074622](https://www.permitgraph.org/p/202411074622) | Nov 7, 2024 | Expired or cancelled: withdrawn Jun 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | 13th/f: new card reader & rex device installation at specfied location | $6,000 |
| [202409251604](https://www.permitgraph.org/p/202409251604) | Sep 25, 2024 | In progress: issued Sep 2024 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873) | 13/fl-(n) power and signal devices title 24 |  |
| [202309227180](https://www.permitgraph.org/p/202309227180) | Sep 22, 2023 | Completed: final sign-off Oct 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 6/f: fire alarm modificaation commercial ti 6th fl. 16 new speaker strobes, 14 new speakers. ref 202306301339. | $5,000 |
| [202307071661](https://www.permitgraph.org/p/202307071661) | Jul 7, 2023 | Completed: final sign-off Mar 2024 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | voluntary replacement of fire alarm control panels and smoke detector devices as follows: 1 facp, 3 remote nodes, 287 smoke detectors, 34 duct smoke detectors, 2 rmeodel annunicator. maher n/a. | $48,000 |
| [202306301341](https://www.permitgraph.org/p/202306301341) | Jun 30, 2023 | Completed: final sign-off Feb 2024 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 12th fl restroom upgrade mep deferred | $125,000 |
| [202306301339](https://www.permitgraph.org/p/202306301339) | Jun 30, 2023 | Completed: final sign-off Feb 2024 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | 6th fl: t.i. for suite 600 & 610: non structural partitions, doors, lighting, fixture & finishes, mep deferred | $364,768 |
| [202304044985](https://www.permitgraph.org/p/202304044985) | Apr 4, 2023 | Never finaled: issued May 2023, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Sign Of Light](https://www.permitgraph.org/contractor/sign-of-light-906191) | instll (3) non-electric single face wall signs (bmo) | $7,500 |
| [202304044993](https://www.permitgraph.org/p/202304044993) | Apr 4, 2023 | Completed: final sign-off Jun 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069) | installation of evac maps 7th fl | $2,000 |
| [202303032977](https://www.permitgraph.org/p/202303032977) | Mar 3, 2023 | Completed: final sign-off Mar 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 12/f: f/a modification, t.i., relocate/add new modification devices to conform to new floor plan. ref bpa#202211216947 | $7,000 |
| [202302242544](https://www.permitgraph.org/p/202302242544) | Feb 24, 2023 | Completed: final sign-off May 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 7/f: f/a t.i., new notification to conform w/new floor plan, new smoke detector in i.t. room. ref bpa#202208180781 | $10,000 |
| [202302071511](https://www.permitgraph.org/p/202302071511) | Feb 7, 2023 | Completed: final sign-off May 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | mep for bpa# 20220818-0781 | $397,521 |
| [202212158358](https://www.permitgraph.org/p/202212158358) | Dec 15, 2022 | Completed: final sign-off May 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 7th fl - revision to pa 2022-0818-0781 changing a storage room to a ada compliant restroom |  |
| [202209303506](https://www.permitgraph.org/p/202209303506) | Sep 30, 2022 | Completed: final sign-off May 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 7/f: add 26, relocate 82 fire sprinklers per t.i. 202208180781. | $32,050 |
| [202209192667](https://www.permitgraph.org/p/202209192667) | Sep 19, 2022 | Completed: final sign-off Jul 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 4/f: t.i. provide new notification devices to conform w/new floor plan | $10,000 |
| [202208180781](https://www.permitgraph.org/p/202208180781) | Aug 18, 2022 | Completed: final sign-off May 2023 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) | 7/f: t.i.: demo of non-structural partitions and building new non-structural partitions.mep,fire l/s & f/s will be design buildn and submitted for permits separately. | $848,172 |
| [202205063675](https://www.permitgraph.org/p/202205063675) | May 6, 2022 | Completed: final sign-off Aug 2022 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 7th floor: fire sprinkler only. demo only. replace pendents heads to upright; when extg ceiling 15 removed; total 78 heads | $39,000 |
| [202110291442](https://www.permitgraph.org/p/202110291442) | Oct 29, 2021 | Completed: final sign-off Jan 2022 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | fire sprinkler demo. upturn fire sprinkler heads upright heads: 57 | $19,950 |
| [202110049756](https://www.permitgraph.org/p/202110049756) | Oct 4, 2021 | Completed: final sign-off Dec 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | 5th fl: deferred electrical to pa# 202105251023. installation of power/data devices installation of 2019 title 24 compliant lighting controls |  |
| [202108317515](https://www.permitgraph.org/p/202108317515) | Aug 31, 2021 | Completed: final sign-off Sep 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 14/f: add 2 fire sprinklers, relocate 14, remove 1 sprinkler. ref t.i. pa202108136421. | $3,400 |
| [202108136421](https://www.permitgraph.org/p/202108136421) | Aug 13, 2021 | Completed: final sign-off Mar 2022 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen. |  |
| [202107275148](https://www.permitgraph.org/p/202107275148) | Jul 27, 2021 | Completed: final sign-off Feb 2022 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363) | 13/f: install 5 evacuation plan maps for fire review only. | $2,000 |
| [202107154426](https://www.permitgraph.org/p/202107154426) | Jul 15, 2021 | Completed: final sign-off Sep 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm system for office ti 202105251023. 7 new speaker strobes, 1 new strobe | $15,000 |
| [202107144369](https://www.permitgraph.org/p/202107144369) | Jul 14, 2021 | Completed: final sign-off Nov 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | 5th floor: deferred mep submittal ref bpa#2021-0525-1023.demo & install new duct & hvac system. |  |
| [202107013657](https://www.permitgraph.org/p/202107013657) | Jul 1, 2021 | Completed: final sign-off Mar 2022 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | demo of (e) non structural interior partitions, doors, frames, hardware. and contruction (n) interior partitions, doors, frames, hardwares, millwork, ceilings, lightings & finishes. ref to t.i. 2019… | $533,000 |
| [202105251023](https://www.permitgraph.org/p/202105251023) | May 25, 2021 | Completed: final sign-off Dec 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | suite 550 t.i. install non structural gyp board office partitions w/ sidelite,door frames, hardware, electrical,millwork,finishes, light fixtures & acoustical ceiling system where indicated - mep def… | $731,753 |
| [202103196947](https://www.permitgraph.org/p/202103196947) | Mar 19, 2021 | Completed: final sign-off Sep 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 13-fl: deferred submittal to pa 202011138879. mechanical work: install new ducts and grills. relocate (e) thermostats. relocate and rebalance exhaust fans, vav termnal boxes. upgrade 3 pneumatic vav… | $110,000 |
| [202103045919](https://www.permitgraph.org/p/202103045919) | Mar 4, 2021 | Completed: final sign-off Jun 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm t.i. provide (4) control relays for security, a/v shutdown add (12) speaker/strobes to existing circuit add (9) speakers to existing circuit | $9,000 |
| [202102184950](https://www.permitgraph.org/p/202102184950) | Feb 18, 2021 | Completed: final sign-off Jun 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | replace existing electric fire pump, controller with like in kind. | $95,000 |
| [202012100783](https://www.permitgraph.org/p/202012100783) | Dec 10, 2020 | Completed: final sign-off Aug 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | #620: electrical,lighting, power & signal. deferred mep. ref pa# 201909272902 |  |
| [202011209421](https://www.permitgraph.org/p/202011209421) | Nov 20, 2020 | Completed: final sign-off Mar 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | tenant improvements - demo permit. exising fire sprinkler system. 87 relocated sprinklers. | $44,000 |
| [202011138879](https://www.permitgraph.org/p/202011138879) | Nov 13, 2020 | Completed: final sign-off Aug 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 13/f: tenant improvement - construction includes non-structural partitions, millwork, and finishes. mep, f/a and sprinklers will be under separate permit | $1,132,800 |
| [202011058330](https://www.permitgraph.org/p/202011058330) | Nov 5, 2020 | Completed: final sign-off Sep 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 13th fl: demo of existing non structural, partitions, doors & frames, millwork, finishes, electrical and portion of ceiling and lighting. accessibility per ab-017 deferral. sprinkler permit under pa#… | $100,000 |
| [202010287616](https://www.permitgraph.org/p/202010287616) | Oct 28, 2020 | Never finaled: issued Feb 2021, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Performance Air Service Inc](https://www.permitgraph.org/contractor/performance-air-service-inc-861331) | 11/f: remove 1 (e) 1.5 ton water source heat pump and replace with 1 (n) carrier 1.5 ton water source heat pump. direct replacement, reconnect water, drain, duct and electrion. | $12,500 |
| [202010136360](https://www.permitgraph.org/p/202010136360) | Oct 13, 2020 | Completed: final sign-off Apr 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) | interior t.i. of restrooms at floors 14,15,16,17,18,19,20. work includes: demo and construction of partitions, millwork, finishes, electrical and plumbing fixtures. | $341,930 |
| [202009214664](https://www.permitgraph.org/p/202009214664) | Sep 21, 2020 | Completed: final sign-off Dec 2020 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 23rd fl: no new fire alarm equipment - testing with secutiry card access system only. existing control relay. ref electrical pa# ew202007148971. | $1,200 |
| [M1216755](https://www.permitgraph.org/p/M1216755) | Jul 17, 2020 | Never finaled: filed Jul 2020, never issued | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [M1214967](https://www.permitgraph.org/p/M1214967) | Jul 6, 2020 | Never finaled: issued Jul 2020, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [M1197847](https://www.permitgraph.org/p/M1197847) | Feb 21, 2020 | Never finaled: issued Feb 2020, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [202001141787](https://www.permitgraph.org/p/202001141787) | Jan 14, 2020 | Completed: final sign-off Feb 2020 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti add 2 new speakers to suite 620 connect to existing speaker circuit | $5,000 |
| [M1177507](https://www.permitgraph.org/p/M1177507) | Dec 20, 2019 | Never finaled: issued Dec 2019, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [M1169327](https://www.permitgraph.org/p/M1169327) | Nov 21, 2019 | Never finaled: issued Nov 2019, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [201909272902](https://www.permitgraph.org/p/201909272902) | Sep 27, 2019 | Completed: final sign-off Aug 2021 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | ti suite 620 on 6th fl: demo cabinets, partitions and finishes, new millwork, elec/data receptacles, light fixtures. existing ceiling system, devices and light fixtures to remain. mep & electrical un… | $100,000 |
| [201909101163](https://www.permitgraph.org/p/201909101163) | Sep 10, 2019 | Completed: final sign-off Sep 2020 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Rainbow Waterproofing & Restor](https://www.permitgraph.org/contractor/rainbow-waterproofing-restor-148753) | remoeve 1-2 ft of sidewalk adjacent to building to install waterproofing system where building walls meets structural slab. reinstall sidewalk to match existing. remove reinstall fire exit doors. rem… | $457,355 |
| [201905019488](https://www.permitgraph.org/p/201905019488) | May 1, 2019 | Completed: final sign-off Oct 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | replace existing diesel fire pump, controller, and pressure relief valve | $10,000 |
| [201904309261](https://www.permitgraph.org/p/201904309261) | Apr 30, 2019 | Never finaled: issued Apr 2019, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [A S F Electric Inc](https://www.permitgraph.org/contractor/a-s-f-electric-inc-720540) | title 24 electrical, ref pa 201902223610. | $1,000 |
| [201904188309](https://www.permitgraph.org/p/201904188309) | Apr 18, 2019 | Completed: final sign-off May 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 5th fl ref 201902223610 including 11 speaker strobes | $5,000 |
| [201904026829](https://www.permitgraph.org/p/201904026829) | Apr 2, 2019 | Completed: final sign-off May 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | 12th flr fire alarm to 8 speakers 9 speaker/strobes ref 201902223610 | $5,000 |
| [201903145179](https://www.permitgraph.org/p/201903145179) | Mar 14, 2019 | Completed: final sign-off May 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5/f:existing fire sprinkler system - ti. 2 added, 52 relocated, 19 removed, change out 47.. ar&b 18.124. ref arch #201902213523. | $30,000 |
| [201902223610](https://www.permitgraph.org/p/201902223610) | Feb 22, 2019 | Completed: final sign-off Jun 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | suite 1250: t.i incl demo interior, paritions, doors, sidelights. replace light fixtures w/led, t24 fixtures. (n) non-structural partitions, door assemblies, cabs, recepts & finishes. mep, fls & spri… | $180,000 |
| [201902213523](https://www.permitgraph.org/p/201902213523) | Feb 21, 2019 | Completed: final sign-off Jul 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | unoccupied spec suite 500 ab-017" partitions w/sidelites, non-structural partitions, electrical, millwork, finishes, light fixtures & accoustical ceiling ystem, elevator lobby finishes, seating, gyp.… | $731,753 |
| [201901150347](https://www.permitgraph.org/p/201901150347) | Jan 15, 2019 | Completed: final sign-off May 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti 5th fl ref 201811286832 including 5 speaker strobes, 3 smoke detectors | $5,000 |
| [201811286832](https://www.permitgraph.org/p/201811286832) | Nov 28, 2018 | Completed: final sign-off Jul 2019 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) | demo of non-structual portition ceiling, floor finishes to warm shell condition. suite to remain unoccupied until tenant improvement permited to be filed ab-017. new lights. all work on 5th floor. sp… | $500,000 |
| [201808167481](https://www.permitgraph.org/p/201808167481) | Aug 16, 2018 | Completed: final sign-off Sep 2018 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) | fire alarm ti on 12th floor ref 201806262942 including 3 speakers, 2 speaker/strobes maher na | $5,000 |
| [201808076714](https://www.permitgraph.org/p/201808076714) | Aug 7, 2018 | Completed: final sign-off Dec 2018 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 12th fl - title 24 electrical for work under pa 2018-0626-2942 | $14,000 |
| [201807245326](https://www.permitgraph.org/p/201807245326) | Jul 24, 2018 | Completed: final sign-off May 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 12/f: existing sprinkler system t.i. add 2 sprinkler, relocate 2 sprinkler. maher n/a. | $2,000 |
| [201710100738](https://www.permitgraph.org/p/201710100738) | Oct 10, 2017 | Completed: final sign-off Oct 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | fire sprinkler permit add 1 pendent sprinkler on the 6th fl ti 201707172018. n/a for maher. | $1,000 |
| [201707172018](https://www.permitgraph.org/p/201707172018) | Jul 17, 2017 | Completed: final sign-off Oct 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | #600 6/f- demo partial (e) ceiling, 2 lights & flooring/finishes. new scope new rated 20 min entry door & side light assembly ceiling, light fixtures & rated full height gyp. board partition, new non… | $115,000 |
| [201705237327](https://www.permitgraph.org/p/201705237327) | May 23, 2017 | Completed: final sign-off Jul 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd floor - fire alarm ti - add 1 control relay for security door release & 1 smoke detector. maher na | $1,200 |
| [201703232217](https://www.permitgraph.org/p/201703232217) | Mar 23, 2017 | Completed: final sign-off Jun 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 6th/8th/9th flr: fire alarm ti - add 6 ceiling speaker strobes. 6 control relays for av shutdown and 1 relay for security access. relocated six, remove 4 existing. ref 201609147675 maher na | $7,000 |
| [201612215541](https://www.permitgraph.org/p/201612215541) | Dec 21, 2016 | Never finaled: issued Jan 2017, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | 23/f- t.i., new doors, hardware, card readers and ceiling height gyp. board partition. n/a ordinance #155-13 | $50,000 |
| [201610120094](https://www.permitgraph.org/p/201610120094) | Oct 12, 2016 | Completed: final sign-off Mar 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | flrs: 6/8/9: fire sprinkler t.i. under pa#201609147675; relocate 41 sprinklers. maher n/a | $21,210 |
| [201609147675](https://www.permitgraph.org/p/201609147675) | Sep 14, 2016 | Completed: final sign-off Jun 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6/f, 8/f, 9/f- t.i. including minor demolition and new non-structural partitions, bathroom upgrades, new lighting & finishes and associated mechanical & electrical work. fire, life safety under seper… | $1,399,750 |
| [201608306372](https://www.permitgraph.org/p/201608306372) | Aug 30, 2016 | Completed: final sign-off Jun 2017 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) | 6th floor - remove & replace upgrades, barrier removal, remvoe exisitng fixtures & finishes & provide new fixtures & finishes, new led light fixtures. | $50,000 |
| [201507212067](https://www.permitgraph.org/p/201507212067) | Jul 21, 2015 | Completed: final sign-off Dec 2016 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | work includes new floor and finishes, new partitions3 and finishes. work also includes connection & extension of the base building utilities and services. | $325,000 |
| [201507212079](https://www.permitgraph.org/p/201507212079) | Jul 21, 2015 | Completed: final sign-off Mar 2016 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) | new floor and wall finishes, new partitions, and finishes. includes connection to and extension of base building utiliies and services. electrical, mech, plumbing. no change to abase building washroo… | $325,000 |
| [201504274709](https://www.permitgraph.org/p/201504274709) | Apr 27, 2015 | Never finaled: issued Jun 2015, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Thyssenkrupp Elevator Corp.](https://www.permitgraph.org/contractor/thyssenkrupp-elevator-corp-651371) | floors 1, 3 thru 12 : upgrade three elevators w/ destination dispatch low rise 1-12 elevators. n/a maher ordinance | $50,000 |
| [201412012753](https://www.permitgraph.org/p/201412012753) | Dec 1, 2014 | Completed: final sign-off Jan 2015 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | 24th flr: fire alarm tenant improvement, install 3 ceiling mount speaker-strobes, t.i. 201406279859; maher n/a | $1,200 |
| [201409156279](https://www.permitgraph.org/p/201409156279) | Sep 15, 2014 | Completed: final sign-off Aug 2025 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568) | revision to 201405024807. remove partition elevation keys to provide assited listening devices in all conference rooms per 118-219, n/a ordinance #155-13. |  |
| [201402259216](https://www.permitgraph.org/p/201402259216) | Feb 25, 2014 | Completed: final sign-off Apr 2014 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Airco Mechanical Inc](https://www.permitgraph.org/contractor/airco-mechanical-inc-311454) | remove & replace the air handing systems outside air & return air dampers have been removed & replaced under the emcs (energy management control system) retrofit.n/a for the maher ordinance #155-13 | $60,000 |
| [201309237481](https://www.permitgraph.org/p/201309237481) | Sep 23, 2013 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | sprinkler t.i. on 23rd floor: relocate 10 pendents, add 5, delete 3 | $6,180 |
| [201210031216](https://www.permitgraph.org/p/201210031216) | Oct 3, 2012 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | revision to 201009090492. to add 2 new card readers at stairwells at 4th floor only. floors 15th, 16th, 17th, 18th, 19th, 20th showing all existing card readers. ref. arch 201009090492. |  |
| [M342434](https://www.permitgraph.org/p/M342434) | Aug 13, 2012 | Never finaled: issued Aug 2012, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space permit. |  |
| [201208107102](https://www.permitgraph.org/p/201208107102) | Aug 10, 2012 | Completed: final sign-off Aug 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | 3rd floor suite 300 fire alarm t.i. adding 8-speakers to existing f/a system | $7,500 |
| [201208096995](https://www.permitgraph.org/p/201208096995) | Aug 9, 2012 | Completed: final sign-off Nov 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm ti- added 1 strobe and reset candella on other | $2,500 |
| [201202154241](https://www.permitgraph.org/p/201202154241) | Feb 15, 2012 | Completed: final sign-off Mar 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | 23rd floor: light and power work on the 23rd floor. ref arch. 201202093881 | $50,000 |
| [201202093881](https://www.permitgraph.org/p/201202093881) | Feb 9, 2012 | Completed: final sign-off Mar 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | interior demo, new partitions in elevator lobby. new ceiling grid and lighting in unoccupied tenant space per ab-017. mep under separate permit | $60,000 |
| [201201112075](https://www.permitgraph.org/p/201201112075) | Jan 11, 2012 | Completed: final sign-off Feb 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | relocate & remove fire sprinkler heads per tenant improvement. 1 add, 65 relocate and 7 remove | $33,924 |
| [201109094186](https://www.permitgraph.org/p/201109094186) | Sep 9, 2011 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t.i. @ 505 montgomery 18th floor 1 mcr control relay 20 ceiling speaker/strobes, 4 ct2 monitoring modules , 48 ceiling speakers 2 cr control relays , 4 smoke detectors. | $43,092 |
| [201109094189](https://www.permitgraph.org/p/201109094189) | Sep 9, 2011 | Completed: final sign-off Oct 2011 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) | fire alarm t.i. @ 505 montgomery 10th & 11th floor 56 wall strobes & 15 ceiling speakers. | $39,857 |
| [M260806](https://www.permitgraph.org/p/M260806) | May 12, 2011 | Never finaled: issued May 2011, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space |  |
| [201101067929](https://www.permitgraph.org/p/201101067929) | Jan 6, 2011 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | 15th floor - fire alarm t.i.:1 control relay, 2 dual monitor modules,1 smoke detector,2 ceiling mounted strobes,16 ceiling mounted speaker/strobes,42 ceiling mounted speakers. | $5,100 |
| [201101067930](https://www.permitgraph.org/p/201101067930) | Jan 6, 2011 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm t.i.:4 dual monitor modules,4 control, relays,6 smoke detectors, 1 ceiling mounted strobes,2 wp wall strobes, 26 ceiling speaker/strobes,3 wp wall speaker/strobes,11 ceiling speakers. | $8,526 |
| [201010203410](https://www.permitgraph.org/p/201010203410) | Oct 20, 2010 | Completed: final sign-off Apr 2012 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Thyssenkrupp Elevator Corp.](https://www.permitgraph.org/contractor/thyssenkrupp-elevator-corp-651371) | upgrade from conventional elevator all technology to destination dispatch per ab-090; floors 1,4,12 though 24, only. | $90,640 |
| [201009090492](https://www.permitgraph.org/p/201009090492) | Sep 9, 2010 | Completed: final sign-off Oct 2013 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | select demolition of walls and ceilings. new construction for tenant improvement of floor 4. partial build out on floor 14-20. new load bearings partitions, ceilings and finishes. fire sprinkler and… | $8,500,000 |
| [M195686](https://www.permitgraph.org/p/M195686) | Mar 31, 2010 | Never finaled: issued Mar 2010, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space & mta parking |  |
| [200912022450](https://www.permitgraph.org/p/200912022450) | Dec 2, 2009 | Completed: final sign-off Jan 2010 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to appl #200909257644 room 615 walls to remain in original wall types. | $500 |
| [200911191715](https://www.permitgraph.org/p/200911191715) | Nov 19, 2009 | Completed: final sign-off Jan 2010 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th floor. revision to application 200911020354. to delete installation of fsd's. |  |
| [200911020354](https://www.permitgraph.org/p/200911020354) | Nov 2, 2009 | Completed: final sign-off Jan 2010 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 6th floor. mechanical & lighting work including ductwork, difusers, 1 heat pump, 1 new vav box & 2 fire smoke dampers, new lighting, power & signal work. | $150,000 |
| [200910159064](https://www.permitgraph.org/p/200910159064) | Oct 15, 2009 | Expired or cancelled: cancelled Jan 2026 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | corridor extension to existing permit #2009/0915/6870. | $2,000 |
| [200909156870](https://www.permitgraph.org/p/200909156870) | Sep 15, 2009 | Completed: final sign-off Feb 2010 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) | 6th floor - finish improvements to existing elevator lobby,tenant corridor & restroom. mechanical & electrical under separate permit. | $117,000 |
| [200901069631](https://www.permitgraph.org/p/200901069631) | Jan 6, 2009 | Completed: final sign-off Feb 2009 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 20th floor tenant improvements. demolish doors and partitions of 2 document rooms. construct new partitions and door assembley for 1 new telepresence room. m e p fire sprinkler as seperate permit. | $188,530 |
| [M133111](https://www.permitgraph.org/p/M133111) | Sep 3, 2008 | Never finaled: issued Sep 2008, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | street space & sidewalk repair. |  |
| [200808219681](https://www.permitgraph.org/p/200808219681) | Aug 21, 2008 | Never finaled: issued Aug 2008, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | at 2nd, 4th & 14th fl: t.i. for fire alarm additions per highrise inspection. 1 smoke, 4 strobes. | $10,298 |
| [200807086222](https://www.permitgraph.org/p/200807086222) | Jul 8, 2008 | Completed: final sign-off Sep 2008 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | tenant improvement at 5th fl, remove partitions & doors, provide new gyp bd partitions, provide new elect receptacles. no change to mech and fire life safety. | $35,000 |
| [200807025842](https://www.permitgraph.org/p/200807025842) | Jul 2, 2008 | Completed: final sign-off Nov 2008 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | mechanical, install 1 new vav box and replace existing supply and return grills | $24,000 |
| [200805021156](https://www.permitgraph.org/p/200805021156) | May 2, 2008 | Completed: final sign-off Apr 2009 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 23rd floor - relocate and remove fire sprinkler heads per tenant improvments. 5 relocates, 1 removed. | $1,200 |
| [200804290891](https://www.permitgraph.org/p/200804290891) | Apr 29, 2008 | Never finaled: issued Apr 2008, no final | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | revision to application 200802295951 , new wall at tenant corridor to match with existing adjacent wall type which is non-rated. |  |
| [200804109299](https://www.permitgraph.org/p/200804109299) | Apr 10, 2008 | Completed: final sign-off Jul 2009 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) | fire alarm t.i. 12th floor, ada upgrade 3 strobes, 5 speakers/strobes. | $9,615 |
| [200804048888](https://www.permitgraph.org/p/200804048888) | Apr 4, 2008 | Completed: final sign-off Nov 2008 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) | ti on the 23rd floor. add glass partitions in ex. office | $60,000 |
| [200802295951](https://www.permitgraph.org/p/200802295951) | Feb 29, 2008 | Completed: final sign-off Sep 2008 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | tenant improvement on 12th floor, in suite #1200. upgrade existing partitions, and install new partitions, new finish. | $40,000 |
| [200707277992](https://www.permitgraph.org/p/200707277992) | Jul 27, 2007 | Completed: final sign-off Oct 2007 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Merrcon Inc.](https://www.permitgraph.org/contractor/merrcon-inc-851788) | work consists of removal of low work station partitions & removal of 2 ceiling high walls to create more open space, patch,paint & carpet.no changes in existing. no changes to existing ceiling plan.l… | $85,000 |
| [200702154204](https://www.permitgraph.org/p/200702154204) | Feb 15, 2007 | Completed: final sign-off Mar 2007 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Merrcon Inc.](https://www.permitgraph.org/contractor/merrcon-inc-851788) | oti-2 3rd/ fl, el, me. | $36,162 |
| [200702133982](https://www.permitgraph.org/p/200702133982) | Feb 13, 2007 | Completed: final sign-off Mar 2007 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [A S F Electric Inc](https://www.permitgraph.org/contractor/a-s-f-electric-inc-720540) | latham & watkins, 3rd floor: fire alarm upgrade, 7 speakers, 9 strobes | $4,800 |
| [200702023213](https://www.permitgraph.org/p/200702023213) | Feb 2, 2007 | Completed: final sign-off Mar 2007 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | latham & watkins, 3rd floor: oti-1 3rd floor el ,e, l/s, sp | $65,000 |
| [200403189054](https://www.permitgraph.org/p/200403189054) | Mar 18, 2004 | Expired or cancelled: expired Jul 2008 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | demolition and removal from site of exist construction | $40,000 |
| [200305073955](https://www.permitgraph.org/p/200305073955) | May 7, 2003 | Completed: final sign-off Aug 2003 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779) | life safety divices- 19 speakers, 17 strobes, 5 smokes at 15th floor. | $17,000 |
| [200303250566](https://www.permitgraph.org/p/200303250566) | Mar 25, 2003 | Completed: final sign-off Aug 2003 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) | oti-1 15th fl, el, me, ls, sp. | $200,000 |
| [200303058850](https://www.permitgraph.org/p/200303058850) | Mar 5, 2003 | Completed: final sign-off Apr 2003 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | oti-3 7th fl. ls,sp | $14,000 |
| [200212234035](https://www.permitgraph.org/p/200212234035) | Dec 23, 2002 | Completed: final sign-off Jun 2003 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | infill of e stair opening w/ concrete,fill and metal deck oti-1 200212/18/3791 for remodel, this is | $15,000 |
| [200212183791](https://www.permitgraph.org/p/200212183791) | Dec 18, 2002 | Completed: final sign-off Apr 2003 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | oti-1 7th fl, el, me, ls, sp | $234,000 |
| [200205237340](https://www.permitgraph.org/p/200205237340) | May 23, 2002 | Completed: final sign-off Oct 2002 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | oti-2, 5th flr, el, me | $60,000 |
| [200205206983](https://www.permitgraph.org/p/200205206983) | May 20, 2002 | Expired or cancelled: expired Jan 2004 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | oti-1 5th flr el, me ls,sp | $200,000 |
| [200104126666](https://www.permitgraph.org/p/200104126666) | Apr 12, 2001 | Completed: final sign-off Jul 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | renew appl#200003093938 for final inspection |  |
| [200101169878](https://www.permitgraph.org/p/200101169878) | Jan 16, 2001 | Completed: final sign-off May 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-2 3rd floor, el & me & sp | $12,000 |
| [200012158018](https://www.permitgraph.org/p/200012158018) | Dec 15, 2000 | Completed: final sign-off Apr 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | oti-2 24th fl, el | $150,000 |
| [200012158076](https://www.permitgraph.org/p/200012158076) | Dec 15, 2000 | Completed: final sign-off Apr 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | fire alarm shop drawings for work on 24th floor | $12,000 |
| [200012117658](https://www.permitgraph.org/p/200012117658) | Dec 11, 2000 | Completed: final sign-off May 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) | oti-1 34d floor el,me,ls | $80,000 |
| [200011085221](https://www.permitgraph.org/p/200011085221) | Nov 8, 2000 | Expired or cancelled: expired Jun 2004 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | for alarm shop drawing & submittal for work on the 4th floor | $12,000 |
| [200009271680](https://www.permitgraph.org/p/200009271680) | Sep 27, 2000 | Expired or cancelled: expired Jun 2004 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | oti-1 4th floor, el, me, ls, sp | $600,000 |
| [200008047068](https://www.permitgraph.org/p/200008047068) | Aug 4, 2000 | Completed: final sign-off Feb 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | 3rd fl tenant improvement approved under 2000/06/23/3485 for fire protect,light,mech t-24 comp | $30,000 |
| [200004258167](https://www.permitgraph.org/p/200004258167) | Apr 25, 2000 | Completed: final sign-off Feb 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) |  | oti-2 me, sp 3rd floor | $49,500 |
| [200003093938](https://www.permitgraph.org/p/200003093938) | Mar 9, 2000 | Completed: final sign-off Jul 2001 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | in and fill of dumbwater hole thru concrete slab at 24/f | $4,000 |
| [200002162026](https://www.permitgraph.org/p/200002162026) | Feb 16, 2000 | Completed: final sign-off Mar 2000 | [505 Montgomery St](https://www.permitgraph.org/a/0227/005) | [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190) | oti-1 el, me, sp 17th floor | $20,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Convergint Technologies Llc](https://www.permitgraph.org/contractor/convergint-technologies-llc-986407) (13), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (11), [Bach Construction, Inc.](https://www.permitgraph.org/contractor/bach-construction-inc-229727) (7), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (6), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (6), [Red Hawk Fire & Security Ca Llc](https://www.permitgraph.org/contractor/red-hawk-fire-security-ca-llc-713099) (6), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (5), [Principal Builders Inc.](https://www.permitgraph.org/contractor/principal-builders-inc-829808) (5), [Diversified Fire Products](https://www.permitgraph.org/contractor/diversified-fire-products-627565) (4), [Gci, Inc](https://www.permitgraph.org/contractor/gci-inc-689958) (4), [Peacock Construction](https://www.permitgraph.org/contractor/peacock-construction-423901) (4), [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) (3), [Hathaway Dinwiddie Co.](https://www.permitgraph.org/contractor/hathaway-dinwiddie-co-729664) (3), [A S F Electric Inc](https://www.permitgraph.org/contractor/a-s-f-electric-inc-720540) (2), [Dpr Construction Inc](https://www.permitgraph.org/contractor/dpr-construction-inc-599846) (2), [Merrcon Inc.](https://www.permitgraph.org/contractor/merrcon-inc-851788) (2), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) (2), [Peacock Construction Inc](https://www.permitgraph.org/contractor/peacock-construction-inc-656817) (2), [Richlen Construction](https://www.permitgraph.org/contractor/richlen-construction-570031) (2), [Swinerton Builders](https://www.permitgraph.org/contractor/swinerton-builders-92) (2), [Thyssenkrupp Elevator Corp.](https://www.permitgraph.org/contractor/thyssenkrupp-elevator-corp-651371) (2), [Airco Mechanical Inc](https://www.permitgraph.org/contractor/airco-mechanical-inc-311454), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772), [C B F Inc](https://www.permitgraph.org/contractor/c-b-f-inc-335873), [Cic Associates, Inc](https://www.permitgraph.org/contractor/cic-associates-inc-392190), [Decker Electric Co Inc Electrical Contra](https://www.permitgraph.org/contractor/decker-electric-co-inc-electrical-contra-3779), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198), [Golden Gate Sign Company Inc.](https://www.permitgraph.org/contractor/golden-gate-sign-company-inc-665363), [Performance Air Service Inc](https://www.permitgraph.org/contractor/performance-air-service-inc-861331), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241), [Rainbow Waterproofing & Restor](https://www.permitgraph.org/contractor/rainbow-waterproofing-restor-148753), [Rossi Builders Inc.](https://www.permitgraph.org/contractor/rossi-builders-inc-229568), [Sign Of Light](https://www.permitgraph.org/contractor/sign-of-light-906191), [Thomas Swan Sign Co Inc](https://www.permitgraph.org/contractor/thomas-swan-sign-co-inc-269069)
- Architects: [Stanley Lew](https://www.permitgraph.org/professional/stanley-lew-C29609) (11), [Douglas Zucker](https://www.permitgraph.org/professional/douglas-zucker-C12821) (3), [Lisa Bieringer](https://www.permitgraph.org/professional/lisa-bieringer-C34984) (3), [Eric Ibsen](https://www.permitgraph.org/professional/eric-ibsen-C25185) (2), [Jennifer Harding](https://www.permitgraph.org/professional/jennifer-harding-C38991) (2), [Sashikala Murthy](https://www.permitgraph.org/professional/sashikala-murthy-C39484) (2), [Charles Blank](https://www.permitgraph.org/professional/charles-blank-C27353), [Jeffrey Galbraith](https://www.permitgraph.org/professional/jeffrey-galbraith-C33755), [Julia Nelson](https://www.permitgraph.org/professional/julia-nelson-C31838), [Michael Garcia](https://www.permitgraph.org/professional/michael-garcia-C24690), [Rmw](https://www.permitgraph.org/professional/rmw-C15157), [Teresa Emery](https://www.permitgraph.org/professional/teresa-emery-C14087)
- Engineers: [Stephen Shaffer](https://www.permitgraph.org/professional/stephen-shaffer-E21097) (3), [Acco Engineering](https://www.permitgraph.org/professional/acco-engineering-M38284) (2), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Amit Wadhwa](https://www.permitgraph.org/professional/amit-wadhwa-M30894), [Donald Dammen](https://www.permitgraph.org/professional/donald-dammen-294), [Edward Rivera](https://www.permitgraph.org/professional/edward-rivera-2835), [Kerry Kirchenbauer](https://www.permitgraph.org/professional/kerry-kirchenbauer-29847), [Levi G. Abarte](https://www.permitgraph.org/professional/levi-g-abarte-E17622), [Levi Malabuyo](https://www.permitgraph.org/professional/levi-malabuyo-26141), [Michael Murray](https://www.permitgraph.org/professional/michael-murray-37032), [Stanley H Lew](https://www.permitgraph.org/professional/stanley-h-lew-C29609)
- Authorized agents: [Greg Carr](https://www.permitgraph.org/professional/greg-carr-986407) (3)
- Pmt consultant/expediters: [Donald Dammen](https://www.permitgraph.org/professional/donald-dammen-294), [Greg Carr](https://www.permitgraph.org/professional/greg-carr-986407)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.