# 1225 Taylor St

Block 0214, lot 005. Page: https://www.permitgraph.org/a/0214/005

- City's use: Multi-Family Residential
- Built: 1913
- Stories: 5
- Units: 25
- Rooms: 25 bathrooms
- Building: 17,555 sq ft
- Lot: 5,771 sq ft
- Zoning: RM3
- Construction type: D

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

43 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202109017633](https://www.permitgraph.org/p/202109017633) | Sep 1, 2021 | Completed: final sign-off Mar 2022 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 504 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural walls | $32,000 |
| [202109017631](https://www.permitgraph.org/p/202109017631) | Sep 1, 2021 | Completed: final sign-off Mar 2022 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 302 - rehabilitate (e) kitchen & bathroom; install washer & dryer. no removal of structural walls | $32,000 |
| [202107214810](https://www.permitgraph.org/p/202107214810) | Jul 21, 2021 | Expired or cancelled: cancelled Oct 2021 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 504- remodeling 1 kitchen and 1 bathroom. no fixture relocation, no wall removal/relocation, lighting to compy w/ cec 150(k) | $30,000 |
| [202107214811](https://www.permitgraph.org/p/202107214811) | Jul 21, 2021 | Expired or cancelled: cancelled Oct 2021 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 302- remodeling 1 kitchen and 1 bathroom. same location, no fixture relocation, no wall removal/relocation, lighting to comply w/cec 150(k) | $30,000 |
| [202107023674](https://www.permitgraph.org/p/202107023674) | Jul 2, 2021 | Completed: final sign-off Sep 2021 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | revision to pa# 202106233012. reduce scope of work in kitchen. replace counter. replace (e) bath tub with new at same location inside bathroom. unit 201 |  |
| [202106233012](https://www.permitgraph.org/p/202106233012) | Jun 23, 2021 | Completed: final sign-off Sep 2021 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit #201: remodeling kitchen remodeling bathroom | $25,000 |
| [202012030164](https://www.permitgraph.org/p/202012030164) | Dec 3, 2020 | Never finaled: issued Dec 2020, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit#305: rehab bathroom, rehab kitchen. replace washer/dryer in kind. upgrade like. no structural work, no moving walls. | $20,000 |
| [202010217025](https://www.permitgraph.org/p/202010217025) | Oct 21, 2020 | Completed: final sign-off Oct 2021 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587) | voluntary upgrade of fire alarm like for like with additions of low frequency sounders in all sleeping areas to meet code 1103.7.6.1. | $59,360 |
| [M1197347](https://www.permitgraph.org/p/M1197347) | Feb 20, 2020 | Never finaled: issued Feb 2020, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [202002184733](https://www.permitgraph.org/p/202002184733) | Feb 18, 2020 | Completed: final sign-off May 2020 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 303: replace washer/dryer upgrade like. no structural work, no moving walls. ventless unit. | $5,000 |
| [M1184127](https://www.permitgraph.org/p/M1184127) | Jan 10, 2020 | Never finaled: issued Jan 2020, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201912200223](https://www.permitgraph.org/p/201912200223) | Dec 20, 2019 | Completed: final sign-off Jan 2020 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 304. washer/dryer in a closet upgrade, no moving walls, no structural work. | $5,000 |
| [M1135287](https://www.permitgraph.org/p/M1135287) | Sep 9, 2019 | Never finaled: issued Sep 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [M1125207](https://www.permitgraph.org/p/M1125207) | Aug 16, 2019 | Never finaled: issued Aug 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201908169043](https://www.permitgraph.org/p/201908169043) | Aug 16, 2019 | Never finaled: issued Aug 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | #301: install washer/dryer (e) closet. ventless combo unit. no alteration to walls. maintain fire rating. | $5,000 |
| [201907297177](https://www.permitgraph.org/p/201907297177) | Jul 29, 2019 | Completed: final sign-off Sep 2019 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit # 403: install ventless combo washer/dryer in kitchen. no alteration to walls. all plumbinhg work within the unit. | $5,000 |
| [M1106987](https://www.permitgraph.org/p/M1106987) | Jul 10, 2019 | Never finaled: issued Jul 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201907095402](https://www.permitgraph.org/p/201907095402) | Jul 9, 2019 | Never finaled: issued Jul 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | unit 204: install hook up for new washer and dryer in unit 204. no structural | $5,000 |
| [M1059887](https://www.permitgraph.org/p/M1059887) | Apr 2, 2019 | Never finaled: issued Apr 2019, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201903296615](https://www.permitgraph.org/p/201903296615) | Mar 29, 2019 | Completed: final sign-off Apr 2019 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | unit 405. install ventless washer / dryer in (e) closet. | $4,000 |
| [201903226057](https://www.permitgraph.org/p/201903226057) | Mar 22, 2019 | Completed: final sign-off Apr 2019 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) | uni t#401: install ventless washer/dryer in existing closet. maher n/a | $4,000 |
| [201802272301](https://www.permitgraph.org/p/201802272301) | Feb 27, 2018 | Completed: final sign-off Mar 2019 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | unit 401: remodel (e) kitchen & bathroom, upgrade electrical & plumbing, paint & refinish floors, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $29,000 |
| [M894427](https://www.permitgraph.org/p/M894427) | Feb 27, 2018 | Never finaled: issued Feb 2018, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201711204384](https://www.permitgraph.org/p/201711204384) | Nov 20, 2017 | Completed: final sign-off Feb 2018 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | work in unit #404: remodel (e) kitchen and bathroom. re-wire unit. sheetrock, paint, and refinish floors. | $25,000 |
| [201708185268](https://www.permitgraph.org/p/201708185268) | Aug 18, 2017 | Completed: final sign-off Sep 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | as builts to pa #201708043916 - convert existing dact to a new rf communicator. all existing alarm system components & sequence of operation shall remain unchanged. n/a maher ordinance |  |
| [201708043916](https://www.permitgraph.org/p/201708043916) | Aug 4, 2017 | Completed: final sign-off Sep 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | replace existing facp to accommodate new sprinkler system for the 1st floor. ref pa 2017-0607-8721. maher na | $4,000 |
| [M809867](https://www.permitgraph.org/p/M809867) | Jul 17, 2017 | Never finaled: issued Jul 2017, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201706078721](https://www.permitgraph.org/p/201706078721) | Jun 7, 2017 | Completed: final sign-off Sep 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Liberty Fire Systems Inc](https://www.permitgraph.org/contractor/liberty-fire-systems-inc-963431) | 1st flr: add fire sprinklers at new dwelling unit and path of egress ref 201508063557 r1 | $8,000 |
| [M783428](https://www.permitgraph.org/p/M783428) | May 5, 2017 | Never finaled: issued May 2017, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |
| [201703141388](https://www.permitgraph.org/p/201703141388) | Mar 14, 2017 | Completed: final sign-off May 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | unit 403: kitchen and bath remodel, upgrade electrical, paint, floor refinish. | $23,000 |
| [201702109178](https://www.permitgraph.org/p/201702109178) | Feb 10, 2017 | Completed: final sign-off Jun 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [S L M Development Inc.](https://www.permitgraph.org/contractor/s-l-m-development-inc-841898) | revision to original pa#201608225631, strong wall layout, shear wall, holdown. n/a ordinance #155-13 |  |
| [201608225631](https://www.permitgraph.org/p/201608225631) | Aug 22, 2016 | Completed: final sign-off May 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 n/a for maher | $50,000 |
| [201602048875](https://www.permitgraph.org/p/201602048875) | Feb 4, 2016 | Completed: final sign-off Mar 2016 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [21st Century Home Improvt](https://www.permitgraph.org/contractor/21st-century-home-improvt-682929) | unit #407 remodel kitchen & bathroom. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| [201508063557](https://www.permitgraph.org/p/201508063557) | Aug 6, 2015 | Completed: final sign-off Sep 2017 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [S L M Development Inc.](https://www.permitgraph.org/contractor/s-l-m-development-inc-841898) | unit legalization ordinance 43-14. legalization of unwarranted unit. for a total of 25 units. unit to be fully remodeled. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| [201504133466](https://www.permitgraph.org/p/201504133466) | Apr 13, 2015 | Completed: final sign-off May 2015 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [21st Century Home Improvt](https://www.permitgraph.org/contractor/21st-century-home-improvt-682929) | unit# 204. remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| [201504133463](https://www.permitgraph.org/p/201504133463) | Apr 13, 2015 | Completed: final sign-off May 2015 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [21st Century Home Improvt](https://www.permitgraph.org/contractor/21st-century-home-improvt-682929) | unit# 304 remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| [201406067751](https://www.permitgraph.org/p/201406067751) | Jun 6, 2014 | Completed: final sign-off Jun 2014 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | revision to 201405054928. install 3x3 landing on exterior deck. compliance with ord 155-13 not required | $200 |
| [201405054928](https://www.permitgraph.org/p/201405054928) | May 5, 2014 | Completed: final sign-off Jun 2014 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | change to a window to an exterior door at the back of the house of studio #307. construct a rear deck about 29" from grade. to comply with complaint 201468524. maher n/a. | $5,000 |
| [201404082743](https://www.permitgraph.org/p/201404082743) | Apr 8, 2014 | Completed: final sign-off Jun 2014 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) | kitchen and bathroom remodel, unit #301 and 307; no walls to be removed, work to only be done in units 301 and 307, no changes to windows or doors; compliance with ord 155-13 not required | $20,000 |
| [201311081479](https://www.permitgraph.org/p/201311081479) | Nov 8, 2013 | Completed: final sign-off Dec 2013 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) | kitchen & bathroom remodel, electrical upgrade, paint, floor refinish. no change in wall configuration or windows | $17,500 |
| [201309187131](https://www.permitgraph.org/p/201309187131) | Sep 18, 2013 | Completed: final sign-off Oct 2013 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [Gaitan Construction](https://www.permitgraph.org/contractor/gaitan-construction-808399) | basic like for like bathroom & kitchen remodel, paint, floor refinish | $18,000 |
| [200410156981](https://www.permitgraph.org/p/200410156981) | Oct 15, 2004 | Completed: final sign-off Nov 2004 | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) | [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053) | reroofing | $19,711 |
| [M29086](https://www.permitgraph.org/p/M29086) | Sep 3, 2004 | Never finaled: issued Sep 2004, no final | [1225 Taylor St](https://www.permitgraph.org/a/0214/005) |  | street space |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [B-Side Inc.](https://www.permitgraph.org/contractor/b-side-inc-821091) (13), [Flores General Building](https://www.permitgraph.org/contractor/flores-general-building-976557) (4), [21st Century Home Improvt](https://www.permitgraph.org/contractor/21st-century-home-improvt-682929) (3), [Make Ready Maintenance Inc](https://www.permitgraph.org/contractor/make-ready-maintenance-inc-871833) (3), [S L M Development Inc.](https://www.permitgraph.org/contractor/s-l-m-development-inc-841898) (2), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) (2), [Gaitan Construction](https://www.permitgraph.org/contractor/gaitan-construction-808399), [Hue & Cry Security System](https://www.permitgraph.org/contractor/hue-cry-security-system-620587), [Liberty Fire Systems Inc](https://www.permitgraph.org/contractor/liberty-fire-systems-inc-963431), [The Lawson Roofing Co Inc.](https://www.permitgraph.org/contractor/the-lawson-roofing-co-inc-339053)
- Engineers: [Ali Afrasiabi](https://www.permitgraph.org/professional/ali-afrasiabi-S5413) (2), [Joe Win Kon](https://www.permitgraph.org/professional/joe-win-kon-S5425) (2)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0214/005.
