# 70 Gold St

Block 0175, lot 016. Page: https://www.permitgraph.org/a/0175/016

- City's use: Commercial Retail
- Built: 1910
- Stories: 2
- Units: 2
- Rooms: 1 bathroom
- Building: 9,700 sq ft
- Lot: 6,250 sq ft
- Zoning: C2
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

25 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202202178215](https://www.permitgraph.org/p/202202178215) | Feb 17, 2022 | Expired or cancelled: cancelled Jan 2026 | [70 Gold St](https://www.permitgraph.org/a/0175/016) |  | minor alteration for commercial offices. ground floor work only. mep scopes are design-build and under separate permit. no change of use of floor area proposed. | $600,000 |
| [M692228](https://www.permitgraph.org/p/M692228) | May 18, 2016 | Never finaled: issued May 2016, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | street space |  |
| [201604114451](https://www.permitgraph.org/p/201604114451) | Apr 11, 2016 | Never finaled: issued Apr 2016, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Magnum Construction Group Inc](https://www.permitgraph.org/contractor/magnum-construction-group-inc-901895) | all 3 fl: extend fire sprinkler head for new ada restroom @ remodel area. ref #2015-1204-4446. n/a maher ordinance | $3,000 |
| [201603182459](https://www.permitgraph.org/p/201603182459) | Mar 18, 2016 | Completed: final sign-off Apr 2016 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Fire Detection Unlimited](https://www.permitgraph.org/contractor/fire-detection-unlimited-803262) | replacing flex with emt for the existing 2nd floor fire alarm devices. ref pa 2015-1208-4446 | $2,390 |
| [201601278109](https://www.permitgraph.org/p/201601278109) | Jan 27, 2016 | Never finaled: issued Jan 2016, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Schmitt Heating Co Inc](https://www.permitgraph.org/contractor/schmitt-heating-co-inc-708941) | replace (2) heat pumps on 2nd floor and reduct as necessary. reduct (3) existing package units to accomodate new floor plans. maher na | $32,000 |
| [M652607](https://www.permitgraph.org/p/M652607) | Jan 7, 2016 | Never finaled: issued Jan 2016, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | street space |  |
| [201512185446](https://www.permitgraph.org/p/201512185446) | Dec 18, 2015 | Completed: final sign-off Feb 2017 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [J A N Environmental Construction](https://www.permitgraph.org/contractor/j-a-n-environmental-construction-983455) | revision to 201512084446. reconfigure 1st fl mens restroom instead of women restroom. remove existing unpermitted signage. add (n) skylight. n/a for maher ordinance 155-13. |  |
| [201512185445](https://www.permitgraph.org/p/201512185445) | Dec 18, 2015 | Never finaled: filed Dec 2015, never issued | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | revision to 201512084446. reconfigure 1st fl mens bath |  |
| [201512084446](https://www.permitgraph.org/p/201512084446) | Dec 8, 2015 | Completed: final sign-off Mar 2017 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [J A N Environmental Construction](https://www.permitgraph.org/contractor/j-a-n-environmental-construction-983455) | new ada bathrooms on 1st & 3rd floors. new ada shower on 2nd floor, new skylight, renovation of existing offices. n/a maher ordinance | $300,000 |
| [201509227664](https://www.permitgraph.org/p/201509227664) | Sep 22, 2015 | Never finaled: issued Sep 2015, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [J A N Environmental Construction](https://www.permitgraph.org/contractor/j-a-n-environmental-construction-983455) | selective demo - all 3 floors: no structural walls removed, all work within tenant space. non bearing walls only. remain vacancy under ab-017. maher na | $10,000 |
| [201204037426](https://www.permitgraph.org/p/201204037426) | Apr 3, 2012 | Never finaled: issued Apr 2012, no final | [90 Gold St](https://www.permitgraph.org/a/0175/016) |  | no work done, change type of construction & stories per building inspector request. type iii-b, 3 stories over basement. ref. to pa#201203125863 & 201203216545 |  |
| [201203216545](https://www.permitgraph.org/p/201203216545) | Mar 21, 2012 | Never finaled: issued Mar 2012, no final | [90 Gold St](https://www.permitgraph.org/a/0175/016) |  | basement - new lighting title-24, ref pa #2012.03.12.5863. | $20,000 |
| [201203196349](https://www.permitgraph.org/p/201203196349) | Mar 19, 2012 | Never finaled: issued Mar 2012, no final | [90 Gold St](https://www.permitgraph.org/a/0175/016) | [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866) | relocate 5 existing heads and add 3 new sprinker heads in basement only, includes 2 flexheads. | $1,500 |
| [201203125863](https://www.permitgraph.org/p/201203125863) | Mar 12, 2012 | Completed: final sign-off Jul 2012 | [90 Gold St](https://www.permitgraph.org/a/0175/016) |  | non load bearing partition walls door/windows, new electrical outlets & fixtures. new hvac system. small kitchen remodel. | $50,000 |
| [201011154896](https://www.permitgraph.org/p/201011154896) | Nov 15, 2010 | Completed: final sign-off Mar 2011 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | revision to pa# 2010*-0908-0452-modification to plan previously approved, alterations to matrix for sequence of operation |  |
| [201009080452](https://www.permitgraph.org/p/201009080452) | Sep 8, 2010 | Completed: final sign-off Mar 2011 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) | fire alarm for elevator recall. demo existing sprinkler monitor and connect to new panel | $5,200 |
| [201008239381](https://www.permitgraph.org/p/201008239381) | Aug 23, 2010 | Completed: final sign-off Mar 2011 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Jim Parr Dba Plumbing](https://www.permitgraph.org/contractor/jim-parr-dba-plumbing-529553) | install 2 fire sprinkler heads top/bottom. elevator shaft | $1,800 |
| [M216546](https://www.permitgraph.org/p/M216546) | Aug 18, 2010 | Never finaled: issued Aug 2010, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | street space |  |
| [201007156730](https://www.permitgraph.org/p/201007156730) | Jul 15, 2010 | Completed: final sign-off Mar 2011 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Trim Fit Constr. - O'reilly Engineering](https://www.permitgraph.org/contractor/trim-fit-constr-o-reilly-engineering-731493) | selective domolition for exploratory purposes on all 3 floors, plus basement. no structural walls removed. 100 sq. ft. of total wall opening per floor. all work within tenant space only and will be o… | $12,000 |
| [201006295537](https://www.permitgraph.org/p/201006295537) | Jun 29, 2010 | Completed: final sign-off Sep 2010 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Qualogy Constrution Inc.](https://www.permitgraph.org/contractor/qualogy-constrution-inc-803521) | new non bearing partition wall on 3rd level, relocation of e door on 2nd level, new rated infill wall and new non rated furred out walls on 1st level | $30,000 |
| [201006285450](https://www.permitgraph.org/p/201006285450) | Jun 28, 2010 | Completed: final sign-off Mar 2011 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | install new elevator in existing building. new elevator will remove accessibility issue between floors. work also includes replacement of some windows, doors in atrium, minor alterations @third floor… | $90,000 |
| [201006225065](https://www.permitgraph.org/p/201006225065) | Jun 22, 2010 | Completed: final sign-off Sep 2010 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Qualogy Constrution Inc.](https://www.permitgraph.org/contractor/qualogy-constrution-inc-803521) | interior demo of non bearing walls only on 1st, 2nd and 3rd floors. ti under separate permit. | $20,000 |
| [M118948](https://www.permitgraph.org/p/M118948) | May 9, 2008 | Never finaled: issued May 2008, no final | [820 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | street space permit only. |  |
| [200407300196](https://www.permitgraph.org/p/200407300196) | Jul 30, 2004 | Never finaled: issued Jul 2004, no final | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) | [Michael Fellman Siding & Roofing](https://www.permitgraph.org/contractor/michael-fellman-siding-roofing-520620) | reroofing | $7,800 |
| [20000128507](https://www.permitgraph.org/p/20000128507) | Jan 28, 2000 | Completed: final sign-off Mar 2000 | [814 Montgomery St](https://www.permitgraph.org/a/0175/016) |  | revise pa#9902756-revise layout for grd floor women bathrm |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [J A N Environmental Construction](https://www.permitgraph.org/contractor/j-a-n-environmental-construction-983455) (3), [B B J Electric, Inc](https://www.permitgraph.org/contractor/b-b-j-electric-inc-670906) (2), [Qualogy Constrution Inc.](https://www.permitgraph.org/contractor/qualogy-constrution-inc-803521) (2), [Fire Detection Unlimited](https://www.permitgraph.org/contractor/fire-detection-unlimited-803262), [Jim Parr Dba Plumbing](https://www.permitgraph.org/contractor/jim-parr-dba-plumbing-529553), [Magnum Construction Group Inc](https://www.permitgraph.org/contractor/magnum-construction-group-inc-901895), [Michael Fellman Siding & Roofing](https://www.permitgraph.org/contractor/michael-fellman-siding-roofing-520620), [O'connor Plumbing & Fire Protection](https://www.permitgraph.org/contractor/o-connor-plumbing-fire-protection-498866), [Schmitt Heating Co Inc](https://www.permitgraph.org/contractor/schmitt-heating-co-inc-708941), [Trim Fit Constr. - O'reilly Engineering](https://www.permitgraph.org/contractor/trim-fit-constr-o-reilly-engineering-731493)
- Architects: [Anthony Pantaleoni](https://www.permitgraph.org/professional/anthony-pantaleoni-C14072) (2), [Paul Tang](https://www.permitgraph.org/professional/paul-tang-C24959), [Ronald Wallace](https://www.permitgraph.org/professional/ronald-wallace-C8300)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0175/016.
