# 600 Battery St

Block 0173, lot 001. Page: https://www.permitgraph.org/a/0173/001

The city's assessor roll has no record for this parcel.

## Permits filed here

41 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202406204855](https://www.permitgraph.org/p/202406204855) | Jun 20, 2024 | Completed: final sign-off Sep 2025 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | basement-2nd floor office ti to inlcude partial demo of non structural partitions. (n) partitions,lighting, and finishes. modify (e) restrooms, break room and coffee bar. mep deferred under separate… | $850,000 |
| [202312192798](https://www.permitgraph.org/p/202312192798) | Dec 19, 2023 | Expired or cancelled: withdrawn Sep 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058) | evacuation map permit for 3 floors. | $1,500 |
| [202312011778](https://www.permitgraph.org/p/202312011778) | Dec 1, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to 202211216981, addendum 2 changing combiined facility restrooms to separate facility restrooms | $100,000 |
| [202312011775](https://www.permitgraph.org/p/202312011775) | Dec 1, 2023 | Completed: final sign-off Jan 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | evacuation signage | $1,000 |
| [202311100584](https://www.permitgraph.org/p/202311100584) | Nov 10, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | dph review missed during s2 review/issued for bpa 202211216981. review for dph only: 1 catering room-no cooking in basement; 7 micro pantries 2 in basement, 3 on level 1,2 on level 2 and 1 coffee bar |  |
| [202311030154](https://www.permitgraph.org/p/202311030154) | Nov 3, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to addendum 1 to site permit 202211216981, this permit revision adds notes of existing foundation information for record. install dayton type 2 mechanical couplers to connect exist. rebars. |  |
| [202310178849](https://www.permitgraph.org/p/202310178849) | Oct 17, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | new ceiling attachment at basement community hall. celing approved in pa#: 202211216981 addendum 2 | $10,000 |
| [202308315663](https://www.permitgraph.org/p/202308315663) | Aug 31, 2023 | Completed: final sign-off Nov 2023 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system ti 96 pendents and 49 uprights. ref pa 202211216981/s2 | $91,000 |
| [202308315664](https://www.permitgraph.org/p/202308315664) | Aug 31, 2023 | Completed: final sign-off Nov 2023 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system ti 72 pendents and 45 uprights. ref pa 202211216981/s2 | $74,000 |
| [202308315661](https://www.permitgraph.org/p/202308315661) | Aug 31, 2023 | Completed: final sign-off Nov 2023 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system ti 93 pendents and 25 uprights. ref pa 202211216981/s2 | $74,000 |
| [202308214855](https://www.permitgraph.org/p/202308214855) | Aug 21, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | install of metal decorative screen at existing opening in the building facade. | $30,000 |
| [202303294590](https://www.permitgraph.org/p/202303294590) | Mar 29, 2023 | Completed: final sign-off Mar 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | interior demo of (e) non structural partitions, doors, millwork, ceilings, flooring & other finishes, hvac, electrical (including lighting), plumbing & equipment. this demo work is in preparation for… | $125,000 |
| [202211216981](https://www.permitgraph.org/p/202211216981) | Nov 21, 2022 | Completed: final sign-off Apr 2024 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | priority process ab-004: tenant improvement: demo of non-structural interior partitions, finishes & associated mep. addition of new non-structural interior partitions, finishes & associated mep. upgr… | $14,250,000 |
| [202107073875](https://www.permitgraph.org/p/202107073875) | Jul 7, 2021 | Completed: final sign-off Mar 2022 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138) | proposed modification to e unmanned telcom facility to include install 2 new radios on new mounts. remove 2 e tmas, all unused equp. in stall 1 new xmu and 1 n bb5216 in e cabinet. install 1 new dipl… | $25,000 |
| [202106293398](https://www.permitgraph.org/p/202106293398) | Jun 29, 2021 | Completed: final sign-off Sep 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Hillhouse Construction Company Inc](https://www.permitgraph.org/contractor/hillhouse-construction-company-inc-593668) | revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications. | $10,000 |
| [202104299549](https://www.permitgraph.org/p/202104299549) | Apr 29, 2021 | Completed: final sign-off Aug 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm ti: adding (1) remote power supply, (1) control module, (6) horn-strobes, (2) strobes, (2) pull stations and (2) heat detectors to existing notifier afp-400 fire alarm system. | $10,312 |
| [202103015547](https://www.permitgraph.org/p/202103015547) | Mar 1, 2021 | Completed: final sign-off Sep 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Hillhouse Construction Company Inc](https://www.permitgraph.org/contractor/hillhouse-construction-company-inc-593668) | add a few accent light fixtures to new lobby finishes | $20,000 |
| [202103015583](https://www.permitgraph.org/p/202103015583) | Mar 1, 2021 | Completed: final sign-off Sep 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Hillhouse Construction Company Inc](https://www.permitgraph.org/contractor/hillhouse-construction-company-inc-593668) | renovate lighting & power & lighting for new roof deck renovation permit #2020-0902-3304. | $65,000 |
| [202011209443](https://www.permitgraph.org/p/202011209443) | Nov 20, 2020 | Completed: final sign-off Aug 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Hillhouse Construction Company Inc](https://www.permitgraph.org/contractor/hillhouse-construction-company-inc-593668) | 1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be… | $239,455 |
| [202009285322](https://www.permitgraph.org/p/202009285322) | Sep 28, 2020 | Completed: final sign-off May 2021 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696) | remove & replace (e) boiler skid w/ new like for like skid. disconnect (e) electric rooms from exhaust system. install new transfer fans to serve (e) electrical rooms | $320,000 |
| [201803194013](https://www.permitgraph.org/p/201803194013) | Mar 19, 2018 | Completed: final sign-off Dec 2018 | [600 Battery St](https://www.permitgraph.org/a/0173/001) |  | fire sprinkler permit: relocate 2 and add 1 pendent, relocate 1 and add 1 upright sprinkler on the 2nd floor - new bracing calculations; ti # 201801319989 | $3,000 |
| [201803123377](https://www.permitgraph.org/p/201803123377) | Mar 12, 2018 | Completed: final sign-off May 2018 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | ref 201801319989. ti to (e) notifer afp-400 fire alarm system. adding 5 horn/strobes, 2 strobes and 1 control relay for security panel interface. | $7,500 |
| [201801319989](https://www.permitgraph.org/p/201801319989) | Jan 31, 2018 | Completed: final sign-off Jun 2018 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | 2nd flr - interior renovation to create a 2nd flr demise making this floor multi tenant. mep & fire life safety under sep permit maher na | $40,000 |
| [201602260579](https://www.permitgraph.org/p/201602260579) | Feb 26, 2016 | Completed: final sign-off Dec 2018 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | fire alarm: add two horns/strobes on the ground floor as part of a ti. ref pa 2015-1214-4919 & 2015-1028-0968. maher na | $1,300 |
| [201512144919](https://www.permitgraph.org/p/201512144919) | Dec 14, 2015 | Completed: final sign-off Jul 2016 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 1st floor - revision to pa #201510280968 - door schedule, wall connection & type, etc. n/a maher ordinance |  |
| [201512114809](https://www.permitgraph.org/p/201512114809) | Dec 11, 2015 | Completed: final sign-off Dec 2018 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | install (8) fire sprinklers in new soffit ref pa 2015-1028-0968 | $4,000 |
| [201510280968](https://www.permitgraph.org/p/201510280968) | Oct 28, 2015 | Completed: final sign-off Jul 2016 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | 1st floor: interior renovation of an (e) open office area making the space a conference room. maher na | $71,995 |
| [201311262936](https://www.permitgraph.org/p/201311262936) | Nov 26, 2013 | Completed: final sign-off Jan 2014 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | ground floor - electrical for t.i. to install new lighting & equipment, ref pa #2013.0918.7114 | $40,000 |
| [201310028271](https://www.permitgraph.org/p/201310028271) | Oct 2, 2013 | Completed: final sign-off Aug 2014 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850) | on roof - replace (e) equipment cabinet at (e) t-mobile site w/new equipment cabinet. also adding 1 cable tray & electrical equipment. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 |
| [201308285501](https://www.permitgraph.org/p/201308285501) | Aug 28, 2013 | Completed: final sign-off Sep 2013 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | ground floor-demolition of non load bearing partitions, doors & finishes on ground level t.i space. space to remain vacant per ab-017 & all ada requirements will be met under seperate t.i | $30,000 |
| [201104123894](https://www.permitgraph.org/p/201104123894) | Apr 12, 2011 | Completed: final sign-off Jun 2011 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | tenant improvement for partial 1st. flr. to construct millwork finishes and non-load bearing partitions. mep sep permit including lighting. | $250,000 |
| [201101269065](https://www.permitgraph.org/p/201101269065) | Jan 26, 2011 | Completed: final sign-off Jun 2011 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) | demo of non-loadbearing partition on 1st floor to createspace for future t.i. no path of travel per ab017; tenant improvement and mechanical/electrical/sprinkler/ life safety on serparate permit. dem… | $15,000 |
| [200901059555](https://www.permitgraph.org/p/200901059555) | Jan 5, 2009 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | revision to appl #200808252619 to add edit bay room. | $5,500 |
| [200812228985](https://www.permitgraph.org/p/200812228985) | Dec 22, 2008 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st fl.mechanical work associated with approved appl #200809252619. | $120,000 |
| [200811106180](https://www.permitgraph.org/p/200811106180) | Nov 10, 2008 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | lighting power and data work associated with app#200809252619. no new panel. | $16,000 |
| [200811055896](https://www.permitgraph.org/p/200811055896) | Nov 5, 2008 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | 1st & 2nd floors-addition of 8 horn/strobes, 10 strobes, 1 smoke detector, relocate 1 (e) strobe, 1 (e) horn/strobe and replace 4 (e) horn/strobes | $21,000 |
| [200810144020](https://www.permitgraph.org/p/200810144020) | Oct 14, 2008 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) |  | tenant improvment to the existing fire sprinkler system. new uprights:14, new pendents: 15, relocated upgrights: 6, relocated pendents: 1 | $9,000 |
| [200809252619](https://www.permitgraph.org/p/200809252619) | Sep 25, 2008 | Completed: final sign-off Jan 2009 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | 1st & 2nd floor tenant improvement to include new non-load bearing partitions, demountable partitions, millwork, fixtures, doors & finishes. mep & l.s. under separate permits. | $1,400,000 |
| [200603237363](https://www.permitgraph.org/p/200603237363) | Mar 23, 2006 | Completed: final sign-off Feb 2007 | [600 Battery St](https://www.permitgraph.org/a/0173/001) | [Alta Communication Construction](https://www.permitgraph.org/contractor/alta-communication-construction-803745) | installation one new microcell panel antenna & associated equipment mounted on (e) penthouse within a concealment cover. installation of coax run from equipment cabinet to antenna | $25,000 |
| [200004127086](https://www.permitgraph.org/p/200004127086) | Apr 12, 2000 | Expired or cancelled: expired May 2001 | [600 Battery St](https://www.permitgraph.org/a/0173/001) |  | oti 2 1st floor el me sp | $130,000 |
| [200004127083](https://www.permitgraph.org/p/200004127083) | Apr 12, 2000 | Expired or cancelled: expired Nov 2000 | [600 Battery St](https://www.permitgraph.org/a/0173/001) |  | construct cable tray across passage way oti 1 & 2 in progress | $10,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (13), [Source Planning And Construction Inc](https://www.permitgraph.org/contractor/source-planning-and-construction-inc-950183) (6), [Hillhouse Construction Company Inc](https://www.permitgraph.org/contractor/hillhouse-construction-company-inc-593668) (4), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) (4), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (3), [Acco Engineered Systems Inc. Dba Acco En](https://www.permitgraph.org/contractor/acco-engineered-systems-inc-dba-acco-en-120696), [Alta Communication Construction](https://www.permitgraph.org/contractor/alta-communication-construction-803745), [Martin Sign Co Inc.](https://www.permitgraph.org/contractor/martin-sign-co-inc-980058), [Mastec Network Solutions Inc](https://www.permitgraph.org/contractor/mastec-network-solutions-inc-984138), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [Park Place Contractors](https://www.permitgraph.org/contractor/park-place-contractors-520850), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830)
- Architects: [Adam Murphy](https://www.permitgraph.org/professional/adam-murphy-C29238) (8), [Michael R. Downey](https://www.permitgraph.org/professional/michael-r-downey-C19329) (5), [Ana Quezada](https://www.permitgraph.org/professional/ana-quezada-C25871), [John L Thiele](https://www.permitgraph.org/professional/john-l-thiele-C18141)
- Engineers: [Alexander Pacheco](https://www.permitgraph.org/professional/alexander-pacheco-E19376) (3), [Rudolfo P Bustos Iii](https://www.permitgraph.org/professional/rudolfo-p-bustos-iii-M37462) (2), [Craig Ristow](https://www.permitgraph.org/professional/craig-ristow-M30828), [Denis Hugh Morgan](https://www.permitgraph.org/professional/denis-hugh-morgan-C35153), [Elizabeth Allen](https://www.permitgraph.org/professional/elizabeth-allen-E17659), [James Spore](https://www.permitgraph.org/professional/james-spore-70937), [John L Thiele](https://www.permitgraph.org/professional/john-l-thiele-C18141), [Marc Andrew Steyer](https://www.permitgraph.org/professional/marc-andrew-steyer-S6022), [Randy Collins](https://www.permitgraph.org/professional/randy-collins-S4802)
- Authorized agents: [Donald Dammen](https://www.permitgraph.org/professional/donald-dammen-294)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.