# 750 Battery St

Block 0166, lot 008. Page: https://www.permitgraph.org/a/0166/008

- City's use: Commercial Office
- Built: 1986
- Stories: 7
- Units: 1
- Building: 102,343 sq ft
- Lot: 18,906 sq ft
- Zoning: C2
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

98 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202611170890](https://www.permitgraph.org/p/202611170890) | Nov 17, 2026 | In progress: issued Nov 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 4/f: rev 202608066202: adding 5 new private offices at south permite of suite 450. clarification of inishes at restroom and locations of power door operators at tenant suites. |  |
| [202610269861](https://www.permitgraph.org/p/202610269861) | Oct 26, 2026 | In progress: filed Oct 2026, not yet issued | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | deferred electrical work for bpa#2026-0806-6202. | $470,000 |
| [202609298775](https://www.permitgraph.org/p/202609298775) | Sep 29, 2026 | In progress: issued Nov 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | demo existing mains, ductowrk, vav boxes, fan coil, fsds; install new mains, ductwork vav boxes, fsd, fds & mechanical piping; ref# 202608066202 |  |
| [202608066202](https://www.permitgraph.org/p/202608066202) | Aug 6, 2026 | In progress: issued Aug 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the comm… | $2,509,029 |
| [202606173407](https://www.permitgraph.org/p/202606173407) | Jun 17, 2026 | In progress: issued Jul 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lighting | $15,000 |
| [202605221763](https://www.permitgraph.org/p/202605221763) | May 22, 2026 | In progress: issued Jun 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixtu… |  |
| [202605211692](https://www.permitgraph.org/p/202605211692) | May 21, 2026 | Completed: final sign-off Jun 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. ori… |  |
| [202605141277](https://www.permitgraph.org/p/202605141277) | May 14, 2026 | In progress: issued Jul 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | foundation wall, crack damage repair. structural only. no exterior work. | $150,000 |
| [202605141256](https://www.permitgraph.org/p/202605141256) | May 14, 2026 | Completed: final sign-off Jun 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064) | 7th floor (3) evac. signs, fire only permit. |  |
| [202604239929](https://www.permitgraph.org/p/202604239929) | Apr 23, 2026 | Completed: final sign-off Jun 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 7th floor provide new lighting and branch circuiting to existing panel. ref pa#: 202601234385 | $10,000 |
| [202602266563](https://www.permitgraph.org/p/202602266563) | Feb 26, 2026 | In progress: issued Mar 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered. | $199,000 |
| [202601234385](https://www.permitgraph.org/p/202601234385) | Jan 23, 2026 | Completed: final sign-off Jun 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | 7/f: bathroom full remodel. full removal of existing fixtures and finishes new fixtures and finishes and lightening and devices signage. deferred fire & mep. | $27,350 |
| [202601143820](https://www.permitgraph.org/p/202601143820) | Jan 14, 2026 | Completed: final sign-off Aug 2026 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | tenant improvement on the 7th floor to include new non-structural partitions, acoustical ceiling, finishes, millwork, single user restroom. mep included. | $1,500,000 |
| [202410304035](https://www.permitgraph.org/p/202410304035) | Oct 30, 2024 | Completed: final sign-off Feb 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | ref pa 202407237032 structural lobby framing |  |
| [202409201253](https://www.permitgraph.org/p/202409201253) | Sep 20, 2024 | Completed: final sign-off Jan 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772) | install (8) ceiling mount speaker strobes. ref#: 202407237032 | $5,328 |
| [202409040024](https://www.permitgraph.org/p/202409040024) | Sep 4, 2024 | Completed: final sign-off Oct 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Lynn Safety Inc.](https://www.permitgraph.org/contractor/lynn-safety-inc-823787) | installing guardrails to the top of parapet to maintain 42" parapet height in order for scheduled maintenance to occur from the rooftop | $46,173 |
| [202408209015](https://www.permitgraph.org/p/202408209015) | Aug 20, 2024 | Completed: final sign-off Feb 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 1st fl - add 4 relocate 15 fire sprinklers per ti 202407237032 | $11,801 |
| [202407237032](https://www.permitgraph.org/p/202407237032) | Jul 23, 2024 | Completed: final sign-off Feb 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) | interior tenant improvements to existing office building. finish updates to lobby area. entry door replacement. level 1 restroom renovation. no mech work. | $650,000 |
| [202403278715](https://www.permitgraph.org/p/202403278715) | Mar 27, 2024 | In progress: issued Apr 2024 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fire alarm elevator work-modernization. add (1) relay for elevator emr | $5,000 |
| [202211166599](https://www.permitgraph.org/p/202211166599) | Nov 16, 2022 | Never finaled: issued Nov 2022, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | ref pa# 202210204763. fls modification on 7th fl: demo fls devices in the tenant space. the floor will remain unoccupied after the demo. any t.i. work will be under a seperate permit. install (4) spr… | $2,800 |
| [202210204763](https://www.permitgraph.org/p/202210204763) | Oct 20, 2022 | Completed: final sign-off Jan 2023 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Vanek Construction](https://www.permitgraph.org/contractor/vanek-construction-1080193) | 7/f: demo (e) office, drywall partitions & ceiling; ab-017 applies | $150,000 |
| [202206106057](https://www.permitgraph.org/p/202206106057) | Jun 10, 2022 | Completed: final sign-off Jun 2022 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 2/f: fire sprinkler: relocate 14 pendent flex heads and 4 uprights. ref ti permit 202112174605. | $9,450 |
| [202205164305](https://www.permitgraph.org/p/202205164305) | May 16, 2022 | Never finaled: issued May 2022, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Vanek Construction](https://www.permitgraph.org/contractor/vanek-construction-1080193) | ste 350: interior tenant improvement only including new partitions, doors, flooring. | $200,000 |
| [202204111939](https://www.permitgraph.org/p/202204111939) | Apr 11, 2022 | Completed: final sign-off Aug 2022 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | f/a modifiation on 2/f. relocate (7) spks/strobes. | $4,000 |
| [202112174605](https://www.permitgraph.org/p/202112174605) | Dec 17, 2021 | Completed: final sign-off Sep 2022 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022) | minor demo & construction on non-load bearing walls for reconfiguration of private offices, new finishes, elec & mech | $482,000 |
| [201909181909](https://www.permitgraph.org/p/201909181909) | Sep 18, 2019 | Completed: final sign-off Sep 2019 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 5/f: existing fire sprinkler system ti add 2, relocate 8 fire sprinklers. ref pa#201702078844 | $5,000 |
| [201906254312](https://www.permitgraph.org/p/201906254312) | Jun 25, 2019 | Completed: final sign-off Jan 2021 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | f/a modifications on the 5th fl: install 2 smoke detectors; 8 speakers/strobes; 3 speakers; 2 strobes; 1 strobe power supply; 1 control relay; 2 door holders. remove 9 speakers & 9 strobes/replace 10… | $17,060 |
| [201708286049](https://www.permitgraph.org/p/201708286049) | Aug 28, 2017 | Never finaled: issued Aug 2017, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 5th fl: fa as builts for pa #201707121606. incorporation of redlines, no net changes. maher na |  |
| [201707121606](https://www.permitgraph.org/p/201707121606) | Jul 12, 2017 | Completed: final sign-off Aug 2017 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 5th floor fire alarm modification - install (3) speakers/strobes. ref pa #201702078844. n/a maher ordinance | $1,542 |
| [201707101352](https://www.permitgraph.org/p/201707101352) | Jul 10, 2017 | Completed: final sign-off Aug 2017 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | existing fire sprinkler system - tenant improvements, 2 added sprinklers, 6 relocated sprinklers, apn #201702078844. maher na | $3,500 |
| [201702078844](https://www.permitgraph.org/p/201702078844) | Feb 7, 2017 | Never finaled: issued Jun 2017, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107) | 5th floor #500 - tenant remodel (e) restrooms to meet ada & local codes. removal of (e0 millwork open office work stations & reinstall systems. remodel tenant breakroom & copy room, new carpet & pain… | $600,000 |
| [201702068694](https://www.permitgraph.org/p/201702068694) | Feb 6, 2017 | Never finaled: issued Feb 2017, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) | 1st flr: fire sprinklers ref pa 201611082282 relocate 1 pendent in pantry storage area. maher na | $300 |
| [201611082282](https://www.permitgraph.org/p/201611082282) | Nov 8, 2016 | Completed: final sign-off Mar 2017 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | tenant improvement of suite 150 including minor demo, new finishes, and new millwork. fire ls under separate permit. , existing hvac systems to remain | $155,000 |
| [201608165065](https://www.permitgraph.org/p/201608165065) | Aug 16, 2016 | Completed: final sign-off Nov 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | 4th flor, suite 420: revision to ref pa 201605248192 to eliminate conf. rm demo add millwork, plumbing & elec maher na |  |
| [201605248192](https://www.permitgraph.org/p/201605248192) | May 24, 2016 | Never finaled: issued May 2016, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | ste #420: landlord alterations, demise tenant suite, demolish glass conference room, life safety deferred; maher n/a | $3,850 |
| [201603303427](https://www.permitgraph.org/p/201603303427) | Mar 30, 2016 | Completed: final sign-off Oct 2017 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | #101- demolish exterior existing non-accessible doors, install new accessible doors, window, sidelight and hardware. not visable from street. n/a ordinance #155-13 maher not req | $45,312 |
| [201601136947](https://www.permitgraph.org/p/201601136947) | Jan 13, 2016 | Never finaled: issued Jan 2016, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147) | 3rd floor - performance room lighting retrofit & title 24 installation. ref #201511172878. n/a maher ordinance | $41,000 |
| [201512235825](https://www.permitgraph.org/p/201512235825) | Dec 23, 2015 | Completed: final sign-off May 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | sprinklers ti- 3rd floor add & relocate fire sprinklers per ti (2 add) (12 relocate) ref pa 2015-1117-2878 | $3,600 |
| [201512225731](https://www.permitgraph.org/p/201512225731) | Dec 22, 2015 | Completed: final sign-off Mar 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 6th floor f/a modification: install 7 wall strobes, install 10 speakers, replace 7 wall strobe with new. n/a for maher. | $12,336 |
| [201512175328](https://www.permitgraph.org/p/201512175328) | Dec 17, 2015 | Completed: final sign-off Jan 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | ti add (3) relocate (2) and plug one sprinkler to conform to the new wall ceiling layout. ref 2015-1207-4264. maher na | $2,200 |
| [201512114833](https://www.permitgraph.org/p/201512114833) | Dec 11, 2015 | Never finaled: issued Dec 2015, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | as built submission to 201506169085 |  |
| [201512074264](https://www.permitgraph.org/p/201512074264) | Dec 7, 2015 | Completed: final sign-off Jun 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | full floor tenant improvement. barrier removal at 6th fl toilet rm. n/a ordinance #155-13 | $353,258 |
| [201511172878](https://www.permitgraph.org/p/201511172878) | Nov 17, 2015 | Never finaled: issued Dec 2015, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | 3/f -remodel & new finishes to training room, green room and chair room. n/a for maher. life safety deferred. | $200,000 |
| [201511172770](https://www.permitgraph.org/p/201511172770) | Nov 17, 2015 | Completed: final sign-off Nov 2015 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | interior demolition for 6th floor only | $43,500 |
| [201506169085](https://www.permitgraph.org/p/201506169085) | Jun 16, 2015 | Completed: final sign-off Dec 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | fa ti 3rd fl: add 1 duct detector, add 1 control relay, add 1 rib relay. reference ti 2014.1024.9801 | $1,600 |
| [201502208822](https://www.permitgraph.org/p/201502208822) | Feb 20, 2015 | Completed: final sign-off Aug 2015 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | barrier removal at 3rd floor toilet rooms to meet new 2013 ca. bld. code req.s for assessible low energy automatic door operator. maher not required | $790 |
| [201412234334](https://www.permitgraph.org/p/201412234334) | Dec 23, 2014 | Completed: final sign-off Mar 2015 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 2nd floor t.i. for fire alarm: install (41) ceiling speaker/strobes, (1) strobe power supply, (1) smoke det, (10) duct det, (3) control relays, (3) pilot relays, remove (4) wall strobes, remove (1) s… | $32,400 |
| [201412123611](https://www.permitgraph.org/p/201412123611) | Dec 12, 2014 | Completed: final sign-off Apr 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 2nd floor - electrical for pa #2014.1024.9800. n/a maher ordinance |  |
| [201411252430](https://www.permitgraph.org/p/201411252430) | Nov 25, 2014 | Never finaled: issued Nov 2014, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 3rd fl: install 21 ceiling speakers/strobes, 1 smoke detector, 1 duct detector, 1 control relay, remove 1 old smoke detectors, 2 old duct detectors and 4 old control relays. ref. pa. #2014.1024.9801.… | $13,000 |
| [201411181760](https://www.permitgraph.org/p/201411181760) | Nov 18, 2014 | Never finaled: issued Jan 2015, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700) | cumulus media -t.i., lev 2- fire sprinklers (130) added hds, apn. 201410249800, lev 3- fire sprinklers (103) added hds, apn. 201410249801; maher n/a | $115,000 |
| [201411131382](https://www.permitgraph.org/p/201411131382) | Nov 13, 2014 | Completed: final sign-off Apr 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 3rd flr: electrical to pa 201410249801; maher n/a |  |
| [201411030545](https://www.permitgraph.org/p/201411030545) | Nov 3, 2014 | Never finaled: issued Nov 2014, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | 2nd floor : mechanical & plumbing for t.i. appl. 2014.1024.9800; 3rd flr: mechanical and plumbing for 201410249801; maher n/a |  |
| [201410249801](https://www.permitgraph.org/p/201410249801) | Oct 24, 2014 | Completed: final sign-off Apr 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | tenant improvement new rooms studios breakroom, reception area training rm mep sep permit | $400,000 |
| [201410249800](https://www.permitgraph.org/p/201410249800) | Oct 24, 2014 | Completed: final sign-off Apr 2016 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | tenant improvement, new rooms studios breakroom, 2 handicap bathrooms, reception area mep under sep permit | $100,000 |
| [201409186639](https://www.permitgraph.org/p/201409186639) | Sep 18, 2014 | Never finaled: issued Oct 2014, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) | demo of partitions, doors, etc. on 2/f & 3/f. disabled access improvements will be delayed until t.i. are submitted as per ab-017. n/a ordinance #155-13. | $70,000 |
| [201307303058](https://www.permitgraph.org/p/201307303058) | Jul 30, 2013 | Completed: final sign-off Sep 2013 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | 1st floor-addition of 1 ceiling speaker & 3 wall strobes. relocation of 1 wall strobe | $2,500 |
| [201307161955](https://www.permitgraph.org/p/201307161955) | Jul 16, 2013 | Completed: final sign-off May 2025 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | 10th floor-tenant improvement-add 1 sprinkler head. ref permit #2013-0711-1552 | $514 |
| [201307111552](https://www.permitgraph.org/p/201307111552) | Jul 11, 2013 | Completed: final sign-off Jan 2014 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) | suite #100:not a high rise. t.i. demolish offices ceiling tile and flooring, provide new ceiling, lighting and break room configuration. fire sprinklers and alarm under seperate permit. | $196,738 |
| [201105256753](https://www.permitgraph.org/p/201105256753) | May 25, 2011 | Completed: final sign-off Aug 2011 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | reinstall pipe and heads per title 19. deficiency list. total 19 heads | $9,500 |
| [200911191655](https://www.permitgraph.org/p/200911191655) | Nov 19, 2009 | Completed: final sign-off Feb 2010 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | to obtain final inspection for work approved under app #200809292858. all work complete. |  |
| [200907213081](https://www.permitgraph.org/p/200907213081) | Jul 21, 2009 | Completed: final sign-off Feb 2010 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | 3rd floor - to obtain final inspection for work approved under pa #200804089088. all work is complete. |  |
| [200902232563](https://www.permitgraph.org/p/200902232563) | Feb 23, 2009 | Never finaled: issued Feb 2009, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | to obtain final inspection for work approved under pa 200712100112 all work has been completed. |  |
| [200809292858](https://www.permitgraph.org/p/200809292858) | Sep 29, 2008 | Expired or cancelled: expired Mar 2010 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | 3rd floor-barrier removal at 3rd floor public toilet rooms to meet new 2007 california building code requirements for ada accessible stalls | $55,000 |
| [200805121814](https://www.permitgraph.org/p/200805121814) | May 12, 2008 | Completed: final sign-off Feb 2010 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Roberts And Sons Builders](https://www.permitgraph.org/contractor/roberts-and-sons-builders-691789) | update life safety system, including adding 4 new strobes to space. | $6,325 |
| [200804180135](https://www.permitgraph.org/p/200804180135) | Apr 18, 2008 | Completed: final sign-off Feb 2010 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | inter tenant improvement w/ (e) tenant ste, remove open office 1/2 hgt walls w/ glazing, add 4 (n) offices, carpet, vct flring, (n) refrg & dishwasher by tenant, ceilings to remain, (n) allent down l… | $74,650 |
| [200804089088](https://www.permitgraph.org/p/200804089088) | Apr 8, 2008 | Expired or cancelled: expired Jul 2009 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830) | relocate (6) and plug (1) fire sprinklers on the 3rd floor | $1,800 |
| [200712100112](https://www.permitgraph.org/p/200712100112) | Dec 10, 2007 | Never finaled: issued Feb 2008, no final | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) | scope of fire alarm work. replace extg fire alarm in system with new fire alarm system per sffd. corective plan of action | $100,000 |
| [200601303299](https://www.permitgraph.org/p/200601303299) | Jan 30, 2006 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | life safety and minor mech. woprk on the 5th floor | $12,000 |
| [200512120104](https://www.permitgraph.org/p/200512120104) | Dec 12, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | lighting work on floor 5 | $4,500 |
| [200511147945](https://www.permitgraph.org/p/200511147945) | Nov 14, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | fix sprinkler 13 relocated heads. | $1,800 |
| [200510216200](https://www.permitgraph.org/p/200510216200) | Oct 21, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-1 5th floor light/l/s/mech | $58,780 |
| [200509092449](https://www.permitgraph.org/p/200509092449) | Sep 9, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | life safety work including 3 strobes & 5 speaker/strobe units. | $4,500 |
| [200508190761](https://www.permitgraph.org/p/200508190761) | Aug 19, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | machancial work on the 3rd floor. | $16,000 |
| [200508180677](https://www.permitgraph.org/p/200508180677) | Aug 18, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | lighting & electrical work on floor 3. | $6,500 |
| [200508019074](https://www.permitgraph.org/p/200508019074) | Aug 1, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) | fire sprinkler work on 3/f scop of work includes 15 relocates and 1 added head. | $3,200 |
| [200507076982](https://www.permitgraph.org/p/200507076982) | Jul 7, 2005 | Completed: final sign-off Feb 2006 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-1, 3rd floor, el, ls, sp, me. | $58,970 |
| [200401133880](https://www.permitgraph.org/p/200401133880) | Jan 13, 2004 | Completed: final sign-off Feb 2004 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | lighting for tenant improvement expansion and alteration to (e) tenant space bldg is not a highrise | $17,300 |
| [200401063371](https://www.permitgraph.org/p/200401063371) | Jan 6, 2004 | Completed: final sign-off Feb 2004 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-2 1st fl. el, me, ls | $32,350 |
| [200312232862](https://www.permitgraph.org/p/200312232862) | Dec 23, 2003 | Completed: final sign-off Feb 2004 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | 1/f- office t.i., life safety work.rev.to appl#200308061318 | $10,300 |
| [200310319086](https://www.permitgraph.org/p/200310319086) | Oct 31, 2003 | Completed: final sign-off Feb 2004 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-1 1st fl.- el, me, ls, sp | $59,150 |
| [200308061318](https://www.permitgraph.org/p/200308061318) | Aug 6, 2003 | Completed: final sign-off Feb 2004 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | office tenant improvement, expansion & alteration to (e) tenant space mech.& elect. fire sprinkler & | $95,216 |
| [200307078816](https://www.permitgraph.org/p/200307078816) | Jul 7, 2003 | Completed: final sign-off Aug 2003 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-2 electric,mech, & l/s/ for oti-1pa #200304182311 | $8,400 |
| [200305225275](https://www.permitgraph.org/p/200305225275) | May 22, 2003 | Completed: final sign-off Aug 2003 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | fire sprinkler ti relocate 5 ex sprkr heads on 3rd floor. bldg management office as13084 3 flr | $1,500 |
| [200304182611](https://www.permitgraph.org/p/200304182611) | Apr 18, 2003 | Completed: final sign-off Aug 2003 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-1 3rd floor, el, ls, sp | $39,450 |
| [200207020564](https://www.permitgraph.org/p/200207020564) | Jul 2, 2002 | Completed: final sign-off Jul 2002 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | renew 200104207308 for final completion |  |
| [200207020567](https://www.permitgraph.org/p/200207020567) | Jul 2, 2002 | Completed: final sign-off Jul 2002 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) | renew for final 200102222681 |  |
| [200110181137](https://www.permitgraph.org/p/200110181137) | Oct 18, 2001 | Expired or cancelled: expired Apr 2002 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | fire sprinkler add and relocate per tenant improvement at 4th floor only | $1,500 |
| [200109269281](https://www.permitgraph.org/p/200109269281) | Sep 26, 2001 | Completed: final sign-off Nov 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) | 4/f oti-1 4th floor, el, l/s, sp | $45,000 |
| [200108206423](https://www.permitgraph.org/p/200108206423) | Aug 20, 2001 | Expired or cancelled: expired Dec 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | fire sprinkler tenant improvements add& relocate sprinkler heads 1st floor only | $1,100 |
| [200107264590](https://www.permitgraph.org/p/200107264590) | Jul 26, 2001 | Completed: final sign-off Sep 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) | oti-1, grd floor, ltg mech, ls, spr | $60,000 |
| [200104207308](https://www.permitgraph.org/p/200104207308) | Apr 20, 2001 | Expired or cancelled: expired Apr 2002 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) | oti-3, 2nd floor, spr | $2,550 |
| [200103083808](https://www.permitgraph.org/p/200103083808) | Mar 8, 2001 | Completed: final sign-off Apr 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | sprinkler and fire alarm 4/f | $30,000 |
| [200102222681](https://www.permitgraph.org/p/200102222681) | Feb 22, 2001 | Expired or cancelled: expired Apr 2002 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755) | oti-1 2nd floor, el, me, ls, sp | $67,000 |
| [200102021300](https://www.permitgraph.org/p/200102021300) | Feb 2, 2001 | Completed: final sign-off Apr 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | one-stop:m.tjoe:demo of some walls on 14th fl, replace walls to make new offices | $60,000 |
| [200101099433](https://www.permitgraph.org/p/200101099433) | Jan 9, 2001 | Completed: final sign-off Mar 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) | interior demolition only | $15,000 |
| [200003235165](https://www.permitgraph.org/p/200003235165) | Mar 23, 2000 | Expired or cancelled: expired Jul 2000 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ratto Construction Company](https://www.permitgraph.org/contractor/ratto-construction-company-489953) | oti-2: l/s, sp-heads(revision to 20000223576) 4th fl |  |
| [200002282933](https://www.permitgraph.org/p/200002282933) | Feb 28, 2000 | Completed: final sign-off Mar 2000 | [750 Battery St](https://www.permitgraph.org/a/0166/008) | [Ratto Construction Company](https://www.permitgraph.org/contractor/ratto-construction-company-489953) | oti-3 me 4th floor | $7,000 |
| [200002232576](https://www.permitgraph.org/p/200002232576) | Feb 23, 2000 | Expired or cancelled: expired Mar 2001 | [750 Battery St](https://www.permitgraph.org/a/0166/008) |  | oti-2 l/s &sp | $75,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Honeywell International, Inc](https://www.permitgraph.org/contractor/honeywell-international-inc-809777) (14), [Field Construction Inc.](https://www.permitgraph.org/contractor/field-construction-inc-306094) (13), [Ayoob & Peery Plumbing Co Inc](https://www.permitgraph.org/contractor/ayoob-peery-plumbing-co-inc-392967) (10), [Dfi Construction Company](https://www.permitgraph.org/contractor/dfi-construction-company-902076) (8), [Bcci Construction Company](https://www.permitgraph.org/contractor/bcci-construction-company-492944) (7), [Turner Construction Co](https://www.permitgraph.org/contractor/turner-construction-co-210639) (6), [In Site Design Build Associates](https://www.permitgraph.org/contractor/in-site-design-build-associates-715929) (4), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) (2), [Golden Gate Fire Protection Inc](https://www.permitgraph.org/contractor/golden-gate-fire-protection-inc-960198) (2), [Ratto Construction Company](https://www.permitgraph.org/contractor/ratto-construction-company-489953) (2), [Vanek Construction](https://www.permitgraph.org/contractor/vanek-construction-1080193) (2), [Allied Fire Protection](https://www.permitgraph.org/contractor/allied-fire-protection-251700), [Bilcor Inc](https://www.permitgraph.org/contractor/bilcor-inc-892772), [Clune Construction Company L P](https://www.permitgraph.org/contractor/clune-construction-company-l-p-732107), [E. J. Weber Elect.Co Inc](https://www.permitgraph.org/contractor/e-j-weber-elect-co-inc-744147), [Lynn Safety Inc.](https://www.permitgraph.org/contractor/lynn-safety-inc-823787), [Novo Construction Inc](https://www.permitgraph.org/contractor/novo-construction-inc-791022), [Potter Fire Protection](https://www.permitgraph.org/contractor/potter-fire-protection-338830), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241), [Prima Acquire Inc Dba Lahue And Associat](https://www.permitgraph.org/contractor/prima-acquire-inc-dba-lahue-and-associat-1120064), [Roberts And Sons Builders](https://www.permitgraph.org/contractor/roberts-and-sons-builders-691789), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637), [West And East Bay Cosntruction, Inc](https://www.permitgraph.org/contractor/west-and-east-bay-cosntruction-inc-741755)
- Architects: [Louis H. Felthonse](https://www.permitgraph.org/professional/louis-h-felthonse-C15386) (9), [Yong Jin Park](https://www.permitgraph.org/professional/yong-jin-park-C41013) (5), [Allison Mckenzzie](https://www.permitgraph.org/professional/allison-mckenzzie-C34500) (2), [Charles Blank](https://www.permitgraph.org/professional/charles-blank-C27353), [Dean Orr](https://www.permitgraph.org/professional/dean-orr-C33650), [Michael Zelazek](https://www.permitgraph.org/professional/michael-zelazek-C34048), [Thomas Castle](https://www.permitgraph.org/professional/thomas-castle-4063), [Yong Gin Park](https://www.permitgraph.org/professional/yong-gin-park-C410)
- Engineers: [Jesus B Cabellon Jr](https://www.permitgraph.org/professional/jesus-b-cabellon-jr-E9278) (2), [Alan Charles Burr](https://www.permitgraph.org/professional/alan-charles-burr-SE5062), [Alexander Joseph Pacheco](https://www.permitgraph.org/professional/alexander-joseph-pacheco-E19378), [Chris E. Radtke](https://www.permitgraph.org/professional/chris-e-radtke-M24519), [Prabhjeet Grewal](https://www.permitgraph.org/professional/prabhjeet-grewal-E15692), [Sam H. Alkhatib](https://www.permitgraph.org/professional/sam-h-alkhatib-E20259), [Stanley Coventry](https://www.permitgraph.org/professional/stanley-coventry-83509), [Xuong Quach](https://www.permitgraph.org/professional/xuong-quach-M31981)
- Designers: [Golden Gate Fire Protection](https://www.permitgraph.org/professional/golden-gate-fire-protection-960198), [Lahue And Asso.](https://www.permitgraph.org/professional/lahue-and-asso-1120064)
- Pmt consultant/expediters: [Donald Dammen](https://www.permitgraph.org/professional/donald-dammen-294)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0166/008.