# 450 Pacific Ave

Block 0164, lot 010. Page: https://www.permitgraph.org/a/0164/010

- City's use: Commercial Office
- Built: 1906
- Stories: 4
- Units: 1
- Rooms: 3 bathrooms
- Building: 28,586 sq ft
- Lot: 7,150 sq ft
- Zoning: C2
- Construction type: C

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

35 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202607104878](https://www.permitgraph.org/p/202607104878) | Jul 10, 2026 | Completed: final sign-off Sep 2026 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | occupant load review for intermitent use of lobby as assembly in support of sffd operational permit. |  |
| [202501279121](https://www.permitgraph.org/p/202501279121) | Jan 27, 2025 | In progress: issued Feb 2025 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | assembly permit ref pa # 2023-0717-2307 |  |
| [202404190365](https://www.permitgraph.org/p/202404190365) | Apr 19, 2024 | Completed: final sign-off Apr 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | evacuations signs for bpa 202307172307 | $2,000 |
| [202403198168](https://www.permitgraph.org/p/202403198168) | Mar 25, 2024 | Completed: final sign-off May 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216) | fire alarm tenant improvement: adding 3 power supplies, 18 smoke detectors, 2 heat detectors, 4 duct detectors, 1 control module, 3 dual point monitor modules, 7 relay modules, 42 horn-strobes and 48… | $42,600 |
| [202402085532](https://www.permitgraph.org/p/202402085532) | Feb 8, 2024 | Completed: final sign-off Sep 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | structural revisio to 202308154476 includes revisions to stair footing due to unforseen buried existing conduit. no changes to special inspection requirments. |  |
| [202312152579](https://www.permitgraph.org/p/202312152579) | Dec 15, 2023 | Completed: final sign-off May 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify nfpa 13 sprinkler head floors 1-4. total 324 install new floor controller riser assemblies and main drain instair 1 at all levels. ref 202307172307 | $165,508 |
| [202310209167](https://www.permitgraph.org/p/202310209167) | Oct 20, 2023 | Completed: final sign-off Sep 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | removal of building entrance storefront, exterior metal fence and gate, exterior terrance paving and ceiling. construction of new building entrance storefronts, planters, pavings, and ceiling. no dem… | $400,000 |
| [202308224936](https://www.permitgraph.org/p/202308224936) | Aug 22, 2023 | Completed: final sign-off Jul 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deferred mep submittal for approved bpa#202307172307 | $2,094,002 |
| [202308154476](https://www.permitgraph.org/p/202308154476) | Aug 15, 2023 | Completed: final sign-off Sep 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7… | $1,131,565 |
| [202307172307](https://www.permitgraph.org/p/202307172307) | Jul 17, 2023 | Completed: final sign-off Sep 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | 1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no… | $10,840,867 |
| [202306079420](https://www.permitgraph.org/p/202306079420) | Jun 7, 2023 | Completed: final sign-off Oct 2023 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) | modify sprinkler heads. total heads = 8. | $4,000 |
| [202306059253](https://www.permitgraph.org/p/202306059253) | Jun 5, 2023 | Completed: final sign-off Sep 2024 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) | level 1 to 4 -remove of (e)interior partition, flooring finishes, ceiling, millwork, mech, elect, fire alarm devices, sprinklers and equipment not intended to be reused no demo of structure, no enter… | $300,000 |
| [200811207073](https://www.permitgraph.org/p/200811207073) | Nov 20, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | 1st floor-revision to pa# 2007-1228-1528-approval of "local equivalency" for custom grab bars in (e) 1st floor women's bathroom (#115). see delta "c" changes only | $500 |
| [200811207076](https://www.permitgraph.org/p/200811207076) | Nov 20, 2008 | Completed: final sign-off Feb 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | 2nd floor-revision to pa# 2007-1129-9168-approval of "local equivalency" for 2nd floor women's bathroom #220, no work done. |  |
| [200810224802](https://www.permitgraph.org/p/200810224802) | Oct 22, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | mechanical equipment access to roof top ac unit for maintenance | $10,000 |
| [M130727](https://www.permitgraph.org/p/M130727) | Aug 13, 2008 | Never finaled: issued Aug 2008, no final | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | street space permit only. |  |
| [200807025817](https://www.permitgraph.org/p/200807025817) | Jul 2, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | revision to 200806255310: divide private dining room 106 to create screened serving counter and wet bar. | $20,000 |
| [200806255306](https://www.permitgraph.org/p/200806255306) | Jun 25, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | revision to 200803257951: repair deteriorated portion of existing slab. | $10,000 |
| [200806255310](https://www.permitgraph.org/p/200806255310) | Jun 25, 2008 | Completed: final sign-off Feb 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | revision to 2007-12-28-1528: add moveable file system and make minor layout changes to library and private dining area, add janitor closet. relocate door in copy room. no change to disabled access. | $5,000 |
| [200805011072](https://www.permitgraph.org/p/200805011072) | May 1, 2008 | Completed: final sign-off Feb 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | ti existing fire sprinkler system, 432 changeouts from standard response to quick response. relocate for new partitions | $86,400 |
| [200804280751](https://www.permitgraph.org/p/200804280751) | Apr 28, 2008 | Never finaled: issued May 2008, no final | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167) | installation of new fire alarm system in the whole bldg. | $46,000 |
| [M116181](https://www.permitgraph.org/p/M116181) | Apr 14, 2008 | Never finaled: issued Apr 2008, no final | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | street space permit only. |  |
| [200804089102](https://www.permitgraph.org/p/200804089102) | Apr 8, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | modification to lighting previously approved under pa# 2008-03-17-7332 |  |
| [200803257951](https://www.permitgraph.org/p/200803257951) | Mar 25, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | modify existing entryway.work on grd floor. replace 2 skylites. replace 1 flight of stairs (grd floor to mezz). reference current permit for t.i. 200712281528 & seismic upgrade permit 200709122426. | $290,000 |
| [200803177332](https://www.permitgraph.org/p/200803177332) | Mar 17, 2008 | Expired or cancelled: cancelled May 2008 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | electrical and energy compliance plan for ti applications 1st floor 200712281528,2nd floor 200711299168,3rd floor 200711299171,and 4th floor 200711087623. | $550,000 |
| [200803076662](https://www.permitgraph.org/p/200803076662) | Mar 7, 2008 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | complete new hvac system at all floor levels ( 4 floors). no exterior work. | $500,000 |
| [200712281528](https://www.permitgraph.org/p/200712281528) | Dec 28, 2007 | Completed: final sign-off Feb 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | tenant improvements of 1st floor(5,584 sq.ft). drywall partitions and framing, drywall ceilings on (e) framing, doors, frames, harware, interior glazing, finishes, and handicap access upgrades.new dr… | $290,000 |
| [200711299171](https://www.permitgraph.org/p/200711299171) | Nov 29, 2007 | Completed: final sign-off Feb 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | interior tenant improvement on 3rd fl. drywall and framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permit | $290,000 |
| [200711299168](https://www.permitgraph.org/p/200711299168) | Nov 29, 2007 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) | [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) | office tenant improvement on 2nd floor: interior non bearing, dry wall & framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permit. | $325,000 |
| [200711087623](https://www.permitgraph.org/p/200711087623) | Nov 8, 2007 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | office tenant improvement on 4th fl. non bearing interior drywall and framing, doors, frames and hardware. interior glazing, drywall ceiling @ (e)restrooms, finishes, handicap upgrade. mep under sepa… | $360,000 |
| [M91444](https://www.permitgraph.org/p/M91444) | Oct 18, 2007 | Never finaled: issued Oct 2007, no final | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | street space permit only. |  |
| [200709132592](https://www.permitgraph.org/p/200709132592) | Sep 13, 2007 | Completed: final sign-off Mar 2008 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | interior non-strl. demolition only on all floors. | $100,000 |
| [200709122425](https://www.permitgraph.org/p/200709122425) | Sep 12, 2007 | Completed: final sign-off Jan 2009 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | seismic upgrade and interior demolition of entire office building. upgrade restrooms, elevator and path of travel for accessibility. replacement and upgrade of structure on all floors including roof.… | $3,200,000 |
| [M77584](https://www.permitgraph.org/p/M77584) | Jul 17, 2007 | Never finaled: issued Jul 2007, no final | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | street space permit only. |  |
| [200011145671](https://www.permitgraph.org/p/200011145671) | Nov 14, 2000 | Completed: final sign-off Nov 2001 | [450 Pacific Av](https://www.permitgraph.org/a/0164/010) |  | comply w/nov 200009650 | $4,000 |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Webcor Construction Lp](https://www.permitgraph.org/contractor/webcor-construction-lp-1037217) (12), [Skyline Construction](https://www.permitgraph.org/contractor/skyline-construction-727637) (9), [Pribuss Engineering Inc](https://www.permitgraph.org/contractor/pribuss-engineering-inc-251241) (2), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Pacific Auxiliary Fire Alarm](https://www.permitgraph.org/contractor/pacific-auxiliary-fire-alarm-229167), [Rapid Fire Safety&Security Llc Dba Pafa](https://www.permitgraph.org/contractor/rapid-fire-safety-security-llc-dba-pafa-1108216)
- Architects: [Carrie Byles](https://www.permitgraph.org/professional/carrie-byles-C27689) (6), [Leon Carver](https://www.permitgraph.org/professional/leon-carver-C14519) (6), [Kurt Beckmeyer](https://www.permitgraph.org/professional/kurt-beckmeyer-C11509) (2), [Alton L Carver](https://www.permitgraph.org/professional/alton-l-carver-C14549), [Mark Sarkisian](https://www.permitgraph.org/professional/mark-sarkisian-S4639)
- Engineers: [Beckmeyer Carver Architects](https://www.permitgraph.org/professional/beckmeyer-carver-architects-C14519), [David Loo](https://www.permitgraph.org/professional/david-loo-M30746), [Kylie Lo](https://www.permitgraph.org/professional/kylie-lo-E23357), [Kylie Lo](https://www.permitgraph.org/professional/kylie-lo-39537), [Satwant Bhatia](https://www.permitgraph.org/professional/satwant-bhatia-E10555)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0164/010.