# 810 Battery St

Block 0141, lot 011. Page: https://www.permitgraph.org/a/0141/011

- City's use: Multi-Family Residential
- Built: 2008
- Units: 87
- Building: 96,396 sq ft
- Lot: 30,936 sq ft
- Zoning: C2
- Construction type: NA

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

30 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202409231346](https://www.permitgraph.org/p/202409231346) | Sep 25, 2024 | Completed: final sign-off May 2026 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216) | install additional notification appliances to existing fire alarm system to comply with sffc section 1103.7.6.1. install (4) new power supplies and (211) low frequency horns in all units' potential s… | $120,000 |
| [202206136223](https://www.permitgraph.org/p/202206136223) | Jun 13, 2022 | Completed: final sign-off Jul 2022 | [820 Battery St](https://www.permitgraph.org/a/0141/011) | [All Best Buildrs.Inc./All Trusty Bldrs.](https://www.permitgraph.org/contractor/all-best-buildrs-inc-all-trusty-bldrs-909984) | add (1) lavatory for child in toilet and 1 lavatory in classroom area for accessibility | $10,000 |
| [202009174386](https://www.permitgraph.org/p/202009174386) | Sep 17, 2020 | Never finaled: issued Dec 2020, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | modification of an unmanned telecommunications facility consisting of replacing 6 antennas with new models, installing 3 4415 rrus, 3 4449 rrus, and 2 bb6630 and 1 bb 6648. install 1 6160 cabinet, b6… | $25,000 |
| [201708215438](https://www.permitgraph.org/p/201708215438) | Aug 21, 2017 | Expired or cancelled: cancelled Jan 2026 | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | solar hot water system, 32 solar hot water collectors (roof mounted) connected to 1900 gal solar hot water storage tank ex plumbing permit pp20170502005 | $70,062 |
| [201601278108](https://www.permitgraph.org/p/201601278108) | Jan 27, 2016 | Never finaled: issued Apr 2016, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [Community Playgrounds Inc.](https://www.permitgraph.org/contractor/community-playgrounds-inc-362950) | playground renovation. remove extg small rockers and install age appropriate playground equipment in current space. n/a for maher. | $3,400 |
| [201504274678](https://www.permitgraph.org/p/201504274678) | Apr 27, 2015 | Completed: final sign-off Jul 2017 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [Excell Construction](https://www.permitgraph.org/contractor/excell-construction-1007263) | modify t-mobile existing cell site on roof mod involves; instal 3 antennas, 6 existing remain. relocate 2 antennas from sector a to penthouse wall, install 3 new rrvs at (n) ant, frd wall over antenn… | $20,000 |
| [201412053199](https://www.permitgraph.org/p/201412053199) | Dec 5, 2014 | Completed: final sign-off Mar 2015 | [150 Broadway](https://www.permitgraph.org/a/0141/011) | [Air Perfection Heating & Air Condition](https://www.permitgraph.org/contractor/air-perfection-heating-air-condition-887963) | revision appl 2013.0801.3307. revised mechanical drawings. maher n/a. |  |
| [M523327](https://www.permitgraph.org/p/M523327) | Oct 2, 2014 | Never finaled: issued Oct 2014, no final | [150 Broadway](https://www.permitgraph.org/a/0141/011) |  | street space permit |  |
| [201308013307](https://www.permitgraph.org/p/201308013307) | Aug 1, 2013 | Completed: final sign-off Mar 2015 | [150 Broadway](https://www.permitgraph.org/a/0141/011) | [Kuality Constructions](https://www.permitgraph.org/contractor/kuality-constructions-825152) | divide extg office into office with to-go- coffee sale. install accessible uni-sex rest room. install split heating and cooling system. | $25,000 |
| [201206192901](https://www.permitgraph.org/p/201206192901) | Jun 19, 2012 | Completed: final sign-off Mar 2013 | [150 Broadway](https://www.permitgraph.org/a/0141/011) | [Melo Willard Tabudlo Dba Dreamt Design](https://www.permitgraph.org/contractor/melo-willard-tabudlo-dba-dreamt-design-879623) | 1st floor-fisrt time t.i-add gyp board to (e) insulated metal framing, add storage room, relocate electrical & plumbing panel. install fixtures & receptacles | $9,600 |
| [201201303190](https://www.permitgraph.org/p/201201303190) | Jan 30, 2012 | Never finaled: issued Mar 2014, no final | [160 Broadway](https://www.permitgraph.org/a/0141/011) | [Real Signs And Lighting](https://www.permitgraph.org/contractor/real-signs-and-lighting-856068) | to erect electric, projecting, double faced sign. | $1,200 |
| [201201303185](https://www.permitgraph.org/p/201201303185) | Jan 30, 2012 | Never finaled: issued Mar 2014, no final | [160 Broadway](https://www.permitgraph.org/a/0141/011) | [Real Signs And Lighting](https://www.permitgraph.org/contractor/real-signs-and-lighting-856068) | to erect electric, wall, single faced sign. | $2,000 |
| [201201273010](https://www.permitgraph.org/p/201201273010) | Jan 27, 2012 | Completed: final sign-off Mar 2012 | [160 Broadway](https://www.permitgraph.org/a/0141/011) | [R T S Systems And Design Llc](https://www.permitgraph.org/contractor/r-t-s-systems-and-design-llc-475550) | 2 -horn strobe,1 strobe,1-bostre, to add ada devices and slc devices to an existing system | $3,000 |
| [201201192562](https://www.permitgraph.org/p/201201192562) | Jan 19, 2012 | Completed: final sign-off Mar 2012 | [160 Broadway](https://www.permitgraph.org/a/0141/011) | [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594) | 1st floor tenant improvements existing fire sprinkler system - relocate 8 & 2 new dry pendant. | $5,000 |
| [201110176958](https://www.permitgraph.org/p/201110176958) | Oct 17, 2011 | Expired or cancelled: expired Dec 2012 | [160 Broadway](https://www.permitgraph.org/a/0141/011) | [Jebian Construction Inc](https://www.permitgraph.org/contractor/jebian-construction-inc-464788) | change of use from (e) vacant retail to (n) restaurant (subway). pa# 2003.02,21.7986 for new construction. new non load bearing walls, mech, elec, plbg, soffits, tbar clg, counter, restroom, walk-in… | $30,000 |
| [200907233316](https://www.permitgraph.org/p/200907233316) | Jul 23, 2009 | Completed: final sign-off Oct 2010 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872) | installation of umanned wireless telecom. facility including 4 base station equip. cabs within sheet metal screen wall exposure, and 3 antennas enclosed w'in rf friendly screening material. installat… | $90,000 |
| [200708139553](https://www.permitgraph.org/p/200708139553) | Aug 13, 2007 | Completed: final sign-off Jul 2008 | [820 Battery St](https://www.permitgraph.org/a/0141/011) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | modify spr system on ground floor for new tenant existing spr heads 32 - relocate added spr heads 18 | $11,000 |
| [200706184188](https://www.permitgraph.org/p/200706184188) | Jun 18, 2007 | Completed: final sign-off Jul 2008 | [820 Battery St](https://www.permitgraph.org/a/0141/011) | [R T S Systems And Design Llc](https://www.permitgraph.org/contractor/r-t-s-systems-and-design-llc-475550) | extend existing fire alaam sytem in base building to meet fire code for e-3 occupancy. adding detection and notification devices. | $24,000 |
| [200706063190](https://www.permitgraph.org/p/200706063190) | Jun 6, 2007 | Completed: final sign-off Jul 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) | install a statioinary emergency generator at building under constr at 810 battery street.appl #200302217486,attached dwgs for ref please not that this is an alteraton to a prev appl to install an eme… | $50,000 |
| [M54306](https://www.permitgraph.org/p/M54306) | Jan 17, 2007 | Never finaled: issued Jan 2007, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | street space |  |
| [M43371](https://www.permitgraph.org/p/M43371) | Sep 26, 2006 | Never finaled: issued Sep 2006, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | street space |  |
| [200607267650](https://www.permitgraph.org/p/200607267650) | Jul 26, 2006 | Completed: final sign-off Jul 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) | install stationary emergency generator at building under construction at 810 battery st, pa# 2003/02/21/7986, attached drawings for reference. | $50,000 |
| [200607106054](https://www.permitgraph.org/p/200607106054) | Jul 10, 2006 | Completed: final sign-off Jul 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [R T S Systems And Design Llc](https://www.permitgraph.org/contractor/r-t-s-systems-and-design-llc-475550) | installation of new fire alarm system | $129,375 |
| [200605091154](https://www.permitgraph.org/p/200605091154) | May 9, 2006 | Completed: final sign-off Jul 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) | install new automatic fire sprinkler system including fire pump, standpipes and sprinklers throughout building. | $350,000 |
| [M37402](https://www.permitgraph.org/p/M37402) | May 2, 2006 | Never finaled: issued May 2006, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | street space permit |  |
| [200512291236](https://www.permitgraph.org/p/200512291236) | Dec 29, 2005 | Completed: final sign-off Feb 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) | crane installation. | $15,000 |
| [200509304373](https://www.permitgraph.org/p/200509304373) | Sep 30, 2005 | Completed: final sign-off Jul 2008 | [820 Battery St](https://www.permitgraph.org/a/0141/011) | [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) | t.i. for child care facility for low income families-1st floor,new occupancy. | $400,000 |
| [200506084563](https://www.permitgraph.org/p/200506084563) | Jun 8, 2005 | Never finaled: issued Oct 2005, no final | [810 Battery St](https://www.permitgraph.org/a/0141/011) | [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) | install temporary shoring for proposed excavation, bldg.appl #200302217986-s | $65,000 |
| [200302217986](https://www.permitgraph.org/p/200302217986) | Feb 21, 2003 | Completed: final sign-off Jul 2008 | [810 Battery St](https://www.permitgraph.org/a/0141/011) |  | erect 87 residential units, commercial, office and parking | $17,000,000 |
| [M21655](https://www.permitgraph.org/p/M21655) | Sep 9, 2002 | Never finaled: issued Sep 2002, no final | [820 Battery St](https://www.permitgraph.org/a/0141/011) |  | house numbers permit |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [James E Roberts-Obayashi Corporation](https://www.permitgraph.org/contractor/james-e-roberts-obayashi-corporation-358519) (5), [R T S Systems And Design Llc](https://www.permitgraph.org/contractor/r-t-s-systems-and-design-llc-475550) (3), [Real Signs And Lighting](https://www.permitgraph.org/contractor/real-signs-and-lighting-856068) (2), [Westates Mechanical Corporation Inc](https://www.permitgraph.org/contractor/westates-mechanical-corporation-inc-828590) (2), [Air Perfection Heating & Air Condition](https://www.permitgraph.org/contractor/air-perfection-heating-air-condition-887963), [All Best Buildrs.Inc./All Trusty Bldrs.](https://www.permitgraph.org/contractor/all-best-buildrs-inc-all-trusty-bldrs-909984), [Anderson, Rowe & Buckley, Inc.](https://www.permitgraph.org/contractor/anderson-rowe-buckley-inc-91594), [Cccs, Inc](https://www.permitgraph.org/contractor/cccs-inc-826872), [Community Playgrounds Inc.](https://www.permitgraph.org/contractor/community-playgrounds-inc-362950), [Excell Construction](https://www.permitgraph.org/contractor/excell-construction-1007263), [Jebian Construction Inc](https://www.permitgraph.org/contractor/jebian-construction-inc-464788), [Kuality Constructions](https://www.permitgraph.org/contractor/kuality-constructions-825152), [Melo Willard Tabudlo Dba Dreamt Design](https://www.permitgraph.org/contractor/melo-willard-tabudlo-dba-dreamt-design-879623), [San Francisco Fire Protection](https://www.permitgraph.org/contractor/san-francisco-fire-protection-806216)
- Architects: [Michael Froehlich](https://www.permitgraph.org/professional/michael-froehlich-C24111) (2), [David Elliott](https://www.permitgraph.org/professional/david-elliott-C11776), [Paulett Taggart](https://www.permitgraph.org/professional/paulett-taggart-C10957)
- Engineers: [Bret Mccomb](https://www.permitgraph.org/professional/bret-mccomb-C69891), [Cliff Abernathy](https://www.permitgraph.org/professional/cliff-abernathy-90242), [Shahla Saiidnia](https://www.permitgraph.org/professional/shahla-saiidnia-M33664)
- Authorized agents: [Wendy Ho](https://www.permitgraph.org/professional/wendy-ho-806216)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0141/011.
