# 1926 Taylor St

Block 0100, lot 024. Page: https://www.permitgraph.org/a/0100/024

The city's assessor roll has no record for this parcel.

## Permits filed here

13 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [201405216341](https://www.permitgraph.org/p/201405216341) | May 21, 2014 | Completed: final sign-off Feb 2015 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | to comply with physical inspection report # cc-7615 | $5,000 |
| [M155024](https://www.permitgraph.org/p/M155024) | Mar 10, 2009 | Never finaled: issued Mar 2009, no final | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | street space only. |  |
| [200810164413](https://www.permitgraph.org/p/200810164413) | Oct 16, 2008 | Completed: final sign-off Apr 2009 | [1928 Taylor St](https://www.permitgraph.org/a/0100/024) |  | revision to appl #200806245233 includes: modification to window openings/windows at 1928 taylor st unit and 1930 taylor st unit (floor 2nd & 3rd). | $3,000 |
| [200810154241](https://www.permitgraph.org/p/200810154241) | Oct 15, 2008 | Completed: final sign-off May 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | revision to app #200803116869, install 3 16' garage doors along aladdin terrace. provide new proposed driveway | $10,000 |
| [200809262771](https://www.permitgraph.org/p/200809262771) | Sep 26, 2008 | Completed: final sign-off Apr 2009 | [1930 Taylor St](https://www.permitgraph.org/a/0100/024) |  | remodel kitchen & 2 bathrooms in existing unit. all structural work. beam done on a separate permit. 1930 taylor street is the 1st floor unit. | $28,000 |
| [M135444](https://www.permitgraph.org/p/M135444) | Sep 26, 2008 | Never finaled: issued Sep 2008, no final | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | street space permit. |  |
| [200806245233](https://www.permitgraph.org/p/200806245233) | Jun 24, 2008 | Completed: final sign-off Apr 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | unit 1928 - renovation of unit 1928: removal of several interior walls to reconfigure rooms, renovate existing bath and kitchen, and add 1 bath. no structural work. change rear windows. | $95,000 |
| [200805222718](https://www.permitgraph.org/p/200805222718) | May 22, 2008 | Completed: final sign-off Apr 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | 4th floor interior & min. exterior remodel including (e) kitchen, master bath, dining/living, m. bedrm, guest bedrm; demolition & new wall const. int finishes, new skylight, windows, assoc mep & stru… | $125,000 |
| [200805192417](https://www.permitgraph.org/p/200805192417) | May 19, 2008 | Completed: final sign-off Apr 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | seismic upgrade of 2nd, 3rd & 4th level, plywood shearwall add in both directions, garage level strengthening is already approved, under pa 200803116869. t i under separate permits. |  |
| [200805192390](https://www.permitgraph.org/p/200805192390) | May 19, 2008 | Completed: final sign-off May 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | revision to pa 200803116869, steel beam size revision for garage ceiling. | $30,000 |
| [200803147208](https://www.permitgraph.org/p/200803147208) | Mar 14, 2008 | Completed: final sign-off Apr 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | exterior and interior remodel to roof of existing 3 units residence. scope of work is limited to new roof deck, w integral guardrail, skylight, built in bench seating and hot tuf, new roof penthouse… | $35,000 |
| [200803116869](https://www.permitgraph.org/p/200803116869) | Mar 11, 2008 | Completed: final sign-off Jun 2009 | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | alteration to an existing ground floor garage, infill existing garage door and relocate new proposed at alladin terrace. ecavation, foundation replacement, and interior alteration, new mech, elec | $100,000 |
| [M23110](https://www.permitgraph.org/p/M23110) | Mar 10, 2003 | Never finaled: issued Mar 2003, no final | [1926 Taylor St](https://www.permitgraph.org/a/0100/024) |  | sidewalk repair |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Architects: [Eric Dumican](https://www.permitgraph.org/professional/eric-dumican-C31398) (2)
- Engineers: [Fareed Himmati](https://www.permitgraph.org/professional/fareed-himmati-C58011) (5)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0100/024.
