# 152 Lombard St

Block 0059, lot 078. Page: https://www.permitgraph.org/a/0059/078

- City's use: Single Family Residential
- Built: 1975
- Stories: 1
- Units: 1
- Rooms: 2 bedrooms, 2 bathrooms
- Building: 1,150 sq ft
- Zoning: RC4
- Construction type: B

From the assessor's latest secured roll, which can lag recent work.

## Permits filed here

13 permits filed for this property since 2000.

| Permit | Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
| --- | --- | --- | --- | --- | --- | --- |
| [202412025906](https://www.permitgraph.org/p/202412025906) | Dec 2, 2024 | In progress: issued Jan 2026 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153) | bldg #2: addition to the (e) fire alarm system. new nottification appliances will be added to provide proper coverage for area of work. all new notification appliances will be connected to (e) & new… | $111,842 |
| [202108065955](https://www.permitgraph.org/p/202108065955) | Aug 6, 2021 | Completed: final sign-off Jun 2022 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Centric Building Inc.](https://www.permitgraph.org/contractor/centric-building-inc-862909) | level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a. |  |
| [202012110851](https://www.permitgraph.org/p/202012110851) | Dec 11, 2020 | Completed: final sign-off Jun 2022 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Centric Building Inc.](https://www.permitgraph.org/contractor/centric-building-inc-862909) | reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7 |  |
| [202009023303](https://www.permitgraph.org/p/202009023303) | Sep 2, 2020 | Completed: final sign-off Jun 2022 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) |  | bldg #2: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures… | $35,000 |
| [201609157890](https://www.permitgraph.org/p/201609157890) | Sep 15, 2016 | Completed: final sign-off Mar 2017 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Castillo Family Inc Dba Castle Company](https://www.permitgraph.org/contractor/castillo-family-inc-dba-castle-company-962681) | unit 701: remodel kitchen floors, cabinets, counter tops, appliances, lighting, new counter gfi's & light switch; non-structural work; no wall modification. | $25,000 |
| [201110136728](https://www.permitgraph.org/p/201110136728) | Oct 13, 2011 | Completed: final sign-off Mar 2012 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170) | 23 evacuation maps to be reviewed by sffd only (common areas) | $6,900 |
| [200910148936](https://www.permitgraph.org/p/200910148936) | Oct 14, 2009 | Completed: final sign-off Aug 2010 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Lindele Construction Co, Inc](https://www.permitgraph.org/contractor/lindele-construction-co-inc-488129) | unit# 703 at 7th floor. interior remodel of approx. 1,150 sqft incl casework in kitchen, laundry, master bath, bath#2. partial demo of non bearing wall in kitchen. addition of mantle in lv room fire… | $75,000 |
| [200703055446](https://www.permitgraph.org/p/200703055446) | Mar 5, 2007 | Completed: final sign-off May 2007 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Ehj Construction,Inc.](https://www.permitgraph.org/contractor/ehj-construction-inc-530570) | demo & repair wall & floor for bathroom plumbing (waste pipe) repairs. wall & ceiling for kitchen (plumbing pipe repair). open & repair parapet wall for access for new plumbing vent. total work is 1… | $13,950 |
| [200612129711](https://www.permitgraph.org/p/200612129711) | Dec 12, 2006 | Completed: final sign-off Jul 2007 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Sf Contractor](https://www.permitgraph.org/contractor/sf-contractor-749772) | unit #404-master bath:replace cracked shower pan, retile shower and floors, new plumbing fixtures, counter tops, new surface lighting fixtures, switches, gfi's trim. guest bath: replace tub, plumbing… | $21,000 |
| [200508150286](https://www.permitgraph.org/p/200508150286) | Aug 15, 2005 | Completed: final sign-off Dec 2005 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) | [Sure, Inc.](https://www.permitgraph.org/contractor/sure-inc-561658) | replace kitchen cabinets - and bath remodel | $23,000 |
| [200302046648](https://www.permitgraph.org/p/200302046648) | Feb 4, 2003 | Expired or cancelled: expired Sep 2007 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) |  | general upgrade & maintenance to (e) bldng lobby & common hallways, work includes (n) paint, (n) car | $20,000 |
| [20000201804](https://www.permitgraph.org/p/20000201804) | Feb 1, 2000 | Completed: final sign-off Apr 2000 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) |  | new layer of 5/8" gyp over metal channels over existing ceilings (4-rooms) |  |
| [20000107512](https://www.permitgraph.org/p/20000107512) | Jan 7, 2000 | Expired or cancelled: expired Aug 2000 | [152 Lombard St](https://www.permitgraph.org/a/0059/078) |  | renewal of pa 9417671 |  |

## Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

- Contractors: [Centric Building Inc.](https://www.permitgraph.org/contractor/centric-building-inc-862909) (2), [Castillo Family Inc Dba Castle Company](https://www.permitgraph.org/contractor/castillo-family-inc-dba-castle-company-962681), [Ehj Construction,Inc.](https://www.permitgraph.org/contractor/ehj-construction-inc-530570), [Lindele Construction Co, Inc](https://www.permitgraph.org/contractor/lindele-construction-co-inc-488129), [Priority Architectural Graphics Dba Prio](https://www.permitgraph.org/contractor/priority-architectural-graphics-dba-prio-763170), [Pyro-Comm Systems, Inc.](https://www.permitgraph.org/contractor/pyro-comm-systems-inc-612153), [Sf Contractor](https://www.permitgraph.org/contractor/sf-contractor-749772), [Sure, Inc.](https://www.permitgraph.org/contractor/sure-inc-561658)
- Architects: [D. Ian Bevilacqua](https://www.permitgraph.org/professional/d-ian-bevilacqua-C34402) (3)

---
Source: City and County of San Francisco building permit records (DataSF, https://data.sf.gov/), permits filed since 1 January 2000, reloaded nightly. Data as of 22 November 2026.
This is the text of https://www.permitgraph.org/a/0059/078.
